{"id":286842,"date":"2026-01-21T06:53:12","date_gmt":"2026-01-21T11:53:12","guid":{"rendered":"https:\/\/monday.com\/blog\/?p=286842"},"modified":"2026-02-24T06:34:22","modified_gmt":"2026-02-24T11:34:22","slug":"soft-costs","status":"publish","type":"post","link":"https:\/\/monday.com\/blog\/project-management\/soft-costs\/","title":{"rendered":"Soft costs explained: manage project budgets effectively (2026)"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"","protected":false},"author":295,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"pages\/cornerstone-primary.php","format":"standard","meta":{"_acf_changed":false,"_yoast_wpseo_title":"Soft Costs Explained: What They Are And Why They Matter","_yoast_wpseo_metadesc":"Soft costs are indirect project expenses like permits, design, and financing that impact budgets. Learn to track and manage them effectively.","monday_item_id":18041072342,"monday_board_id":0,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[13904],"tags":[],"class_list":["post-286842","post","type-post","status-publish","format-standard","hentry","category-project-management"],"acf":{"sections":[{"acf_fc_layout":"content_1","blocks":[{"main_heading":"","content_block":[{"acf_fc_layout":"text","content":"<p>A project budget looks solid on paper. Materials are quoted, labor is locked in, and the numbers add up perfectly. Then reality hits: permit delays stretch financing costs, design revisions pile up consulting fees, and what seemed like a straightforward timeline becomes a financial drain that nobody saw coming.<\/p>\n<p>These hidden expenses are soft costs: the indirect fees, services, and time-dependent charges that don&#8217;t create physical assets but make or break projects. Unlike materials or labor hours, soft costs remain intangible yet critical. Architectural design, legal permits, project management overhead, and financing interest\u00a0typically consume 15% to 30% of total budgets and prove notoriously difficult to predict or control.<\/p>\n<p>The following sections break down what soft costs actually include, how they differ from hard costs, and why they determine project profitability. Discover the seven major categories every PM should track, proven strategies for controlling these expenses, and how centralized work management platforms help calculate soft cost percentages that protect margins from day one.<\/p>\n"}]},{"main_heading":"Key takeaways","content_block":[{"acf_fc_layout":"text","content":"<ul>\n<li><strong>Soft costs consume 15-30% of your project budget:<\/strong> these indirect expenses like permits, design fees, and financing interest often get overlooked but directly impact your bottom line and profitability.<\/li>\n<li><strong>Time delays multiply soft cost damage exponentially:<\/strong> every month your project runs late adds construction loan interest, insurance premiums, and management salaries that can turn profitable projects into financial losses.<\/li>\n<li><strong>Track soft and hard costs together for complete budget visibility:<\/strong> managing materials without monitoring design fees and permits gives you an incomplete picture that leads to surprise overruns and missed profit targets.<\/li>\n<li><strong>Use real-time dashboards to catch soft cost overruns early:<\/strong> live budget tracking and automated alerts help you spot trends before they destroy your margins, with monday work management&#8217;s\u00a0Portfolio Risk Insights flagging issues across all projects.<\/li>\n<li><strong>Standardize your soft cost categories across all projects:<\/strong> create consistent buckets for legal fees, design costs, and administrative expenses so you can compare performance and identify patterns that drain profitability.<\/li>\n<\/ul>\n<p><span style=\"color: #000000;\"><a class=\"cta-button blue-button\" aria-label=\"Try monday work management\" href=\"https:\/\/auth.monday.com\/users\/sign_up_new\" target=\"_blank\">Try monday work management<\/a><\/span><\/p>\n"}]},{"main_heading":"","content_block":[{"acf_fc_layout":"image","image_type":"normal","image":286826,"image_link":""}]},{"main_heading":"What are soft costs in project management?","content_block":[{"acf_fc_layout":"text","content":"<p>Soft costs are the indirect expenses, required to complete a project, that don&#8217;t result in physical assets. While hard costs cover materials and direct labor, soft costs cover the services, fees, and expertise needed to take a project from idea to finished product.<\/p>\n<p>These expenses hold the project together. Common examples include:<\/p>\n<ul>\n<li><strong>Architectural design fees:<\/strong> covers the end-to-end costs for planning and conceptualization, ensuring the project is viable and aesthetically sound.<\/li>\n<li><strong>Legal permits and regulatory approvals:<\/strong> includes the necessary documentation and processing fees required to meet local building codes and government standards.<\/li>\n<li><strong>Project management software:<\/strong> subscriptions for coordination platforms that streamline task tracking, resource allocation, and team communication.<\/li>\n<li><strong>Financing interest:<\/strong> accounts for the interest that accumulates over the project timeline, ensuring all carrying costs are integrated into the budget.<\/li>\n<\/ul>\n<p>Because these costs are time-based or service-oriented rather than quantity-based, they&#8217;re tough to estimate when you&#8217;re planning.<\/p>\n<p>A delay in your project schedule might not increase material costs, but it drives up soft costs through extended equipment rentals, extra management hours, and prolonged financing fees.<\/p>\n<p>Organizations using work management platforms capture these expenses in real-time. They move beyond static spreadsheets to gain dynamic visibility into how time and administrative overhead impact the bottom line.<\/p>\n<h3>Understanding the definition of soft costs<\/h3>\n<p>A soft cost is any expense not directly tied to building or producing the final product. These costs are typically intangible: you can&#8217;t touch or see them in the final product, but the project won&#8217;t happen without them.<\/p>\n<p>Knowing what makes soft costs different helps you spot and categorize them accurately. Soft costs stand apart and require different tracking because:<\/p>\n<ul>\n<li><strong>Service-oriented:<\/strong> fees paid to architects, consultants, lawyers, and inspectors.<\/li>\n<li><strong>Administrative:<\/strong> overhead for office space, software licenses, and support staff.<\/li>\n<li><strong>Time-dependent:<\/strong> financing interest and insurance premiums that accrue the longer a project takes.<\/li>\n<li><strong>Pre- and post-construction:<\/strong> expenses incurred during planning or after completion, distinct from operational overhead.<\/li>\n<\/ul>\n<h3>Essential soft cost categories every PM tracks<\/h3>\n<p>Smart project managers categorize soft costs to cover the full budget. Breaking these expenses into categories prevents oversights and makes it easier to benchmark against past projects.<\/p>\n<p>The main soft cost categories in most complex projects\u00a0include:<\/p>\n\n<table id=\"tablepress-1836\" class=\"tablepress tablepress-id-1836\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">Category<\/th><th class=\"column-2\">Description<\/th><th class=\"column-3\">Examples<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">Professional services<\/td><td class=\"column-2\">Intellectual roadmap for the project<\/td><td class=\"column-3\">Architects, engineers, specialized consultants<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">Regulatory compliance<\/td><td class=\"column-2\">Legal approvals to proceed<\/td><td class=\"column-3\">Permits, environmental assessments, government fees<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">Financing costs<\/td><td class=\"column-2\">Capital expenses over project lifecycle<\/td><td class=\"column-3\">Loan interest, origination fees, banking charges<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">Administrative expenses<\/td><td class=\"column-2\">Project-specific overhead<\/td><td class=\"column-3\">Office space, communication platforms, software subscriptions<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">Project management overhead<\/td><td class=\"column-2\">Coordination and supervision<\/td><td class=\"column-3\">PM salaries, site supervisors, administrative support<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-1836 from cache -->\n<h3>The real impact on your project bottom line<\/h3>\n<p>Soft costs typically consume between 15% and 30% of a total <a href=\"https:\/\/monday.com\/blog\/project-management\/project-budget\/\" target=\"_blank\" rel=\"noopener\">project budget<\/a>, though this figure can surge higher in complex regulatory environments. Underestimating these figures is one of the biggest reasons budgets blow up.<\/p>\n<p>Consider a three-month delay in a commercial development project. This extends:<\/p>\n<ul>\n<li><strong>Construction loan interest:<\/strong> accumulating monthly.<\/li>\n<li><strong>Insurance premiums:<\/strong> for extended coverage periods.<\/li>\n<li><strong>Project management salaries:<\/strong> for additional oversight time.<\/li>\n<\/ul>\n<p>This domino effect can wipe out profit margins entirely, turning a good project into a money pit.<\/p>\n<p><a href=\"https:\/\/monday.com\/blog\/project-management\/cost-management-software\/\" target=\"_blank\" rel=\"noopener\">Accurate tracking<\/a> protects your project&#8217;s financial health by identifying these trends early, allowing for intervention before the budget is exhausted. Accurate tracking protects your project&#8217;s financial health by identifying these trends early, allowing for intervention before the budget is exhausted.<\/p>\n<p>With live dashboards, teams can see soft costs pile up in real-time, which makes forecasting more accurate based on past patterns.<\/p>\n"}]},{"main_heading":"Soft costs vs hard costs in construction","content_block":[{"acf_fc_layout":"text","content":"<p>Knowing the difference between soft and hard costs is critical for financial control, especially in construction where the line is clearest. Hard costs cover the physical structure and the labor to build it. Soft costs cover design, legal work, and project management.<\/p>\n<h3>Key differences that affect your budget<\/h3>\n<p>Hard and soft costs work differently, so you need to manage them differently. Understanding these differences helps you manage cash flow better and plan projects more accurately.<\/p>\n\n<table id=\"tablepress-1837\" class=\"tablepress tablepress-id-1837\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">Feature<\/th><th class=\"column-2\">Hard costs<\/th><th class=\"column-3\">Soft costs<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">Tangibility<\/td><td class=\"column-2\">Tangible (materials, physical assets)<\/td><td class=\"column-3\">Intangible (services, fees, time)<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">Timing<\/td><td class=\"column-2\">Incurred primarily during construction<\/td><td class=\"column-3\">Incurred before, during, and after construction<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">Predictability<\/td><td class=\"column-2\">High (fixed quotes, material counts)<\/td><td class=\"column-3\">Low (variable based on time and complexity)<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">Measurement<\/td><td class=\"column-2\">Quantifiable units (square feet, hours)<\/td><td class=\"column-3\">Variable units (lump sum, percentage, time)<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">Budget impact<\/td><td class=\"column-2\">~70\u201385% of total budget<\/td><td class=\"column-3\">~15\u201330% of total budget<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-1837 from cache -->\n<p>Hard costs hit during the build phase. In contrast, soft costs hit upfront for design and permits before any physical work starts.<\/p>\n<h3>Why do smart PMs track both cost types?<\/h3>\n<p>Tracking hard costs alone won&#8217;t tell you the full story. Hard costs set the baseline for what you&#8217;re building. However, soft costs often decide whether the project is feasible and stays on schedule.<\/p>\n<p>A project might be under budget on materials but hemorrhaging money on extended consulting fees or legal delays. Integrated <a href=\"https:\/\/monday.com\/blog\/project-management\/operations-management-software\/\" target=\"_blank\" rel=\"noopener\">project management platforms<\/a> allow leaders to view these cost streams in parallel.<\/p>\n<p>Teams using solutions like monday work management track how soft costs stack up against project progress, showing both cost types side by side to improve forecasting accuracy.<\/p>\n<h3>Real examples from construction projects<\/h3>\n<p>How soft and hard costs work together often decides whether your project succeeds. When a permit approval gets delayed by two months, here&#8217;s what happens:<\/p>\n<ul>\n<li><strong>Interest payments and insurance premiums:<\/strong>\u00a0two additional months of accumulating financing costs and coverage fees.<\/li>\n<li><strong>Seasonal construction challenges:<\/strong>\u00a0indirect costs from work pushed into winter months\u00a0with harsher conditions.<\/li>\n<li><strong>Accelerated schedule expenses:<\/strong>\u00a0overtime costs for heating, snow removal, and compressed timelines.<\/li>\n<\/ul>\n<p>Spending more on upfront design and engineering usually means fewer change orders and less material waste during construction. When you see these costs as connected instead of separate, you can make smarter trade-offs that help the overall budget.<\/p>\n<p><span style=\"color: #000000;\"><a class=\"cta-button blue-button\" aria-label=\"Try monday work management\" href=\"https:\/\/auth.monday.com\/users\/sign_up_new\" target=\"_blank\">Try monday work management<\/a><\/span><\/p>\n"},{"acf_fc_layout":"image","image_type":"normal","image":245689,"image_link":""}]},{"main_heading":"7 major types of soft costs in projects","content_block":[{"acf_fc_layout":"text","content":"<p data-path-to-node=\"4\">Specific line items vary by industry, but seven core soft cost categories show up in most complex projects. To plan your budget right, account for each area so surprise expenses don&#8217;t eat into your margins.<\/p>\n<p data-path-to-node=\"5\">Effectively allocating resources and spotting cost overruns before they hurt profitability requires a clear understanding of these categories.<\/p>\n<h3>1. Professional design and engineering services<\/h3>\n<p>This category covers fees paid to architects, structural engineers, interior designers, and specialized consultants who design and plan the project. These costs typically range from 5% to 15% of the total project budget, depending on design complexity.<\/p>\n<p>In software, that means system architects and UX designers. In manufacturing, it&#8217;s process engineers. Better design upfront means fewer expensive mistakes during execution.<\/p>\n<h3>2. Legal fees and administrative expenses<\/h3>\n<p>Projects need constant legal oversight to navigate complex regulations. This category covers:<\/p>\n<ul>\n<li><strong>Contract negotiation\u00a0and dispute resolution:<\/strong>\u00a0legal services to draft agreements and resolve conflicts that arise during project execution.<\/li>\n<li><strong>Zoning applications\u00a0and compliance documentation:<\/strong>\u00a0paperwork and approvals required to meet local land use regulations and building codes.<\/li>\n<li><strong>Document control systems\u00a0and courier services:<\/strong>\u00a0platforms and delivery services that manage and distribute project documentation securely.<\/li>\n<li><strong>Environmental impact assessments\u00a0and regulatory filings:<\/strong>\u00a0studies and submissions required to demonstrate environmental compliance and obtain necessary clearances.<\/li>\n<\/ul>\n<p>The more complex your project, the more legal review you&#8217;ll need.<\/p>\n<h3>3. Permits and regulatory compliance costs<\/h3>\n<p>Before you break ground or launch a product, you need to pay for permits and approvals. This includes:<\/p>\n<ul>\n<li><strong>Building permits\u00a0and occupancy certificates:<\/strong>\u00a0official authorizations to begin construction and certify the structure is safe for use.<\/li>\n<li><strong>Utility connection fees\u00a0and infrastructure assessments:<\/strong>\u00a0charges for connecting to water, power, and sewer systems, plus evaluations of existing infrastructure capacity.<\/li>\n<li><strong>Local government plan review fees\u00a0and inspection costs:<\/strong>\u00a0charges for municipal review of project plans and ongoing inspections throughout construction phases.<\/li>\n<\/ul>\n<p>These costs vary wildly by location and project scope. Beyond the direct fee, the time spent navigating approvals adds up in staff hours and lost opportunities.<\/p>\n<h3>4. Construction financing and insurance<\/h3>\n<p>Financial management in construction involves significant expenditures beyond direct labor and materials. Financing and insurance costs include:<\/p>\n<ul>\n<li><strong>Loan origination fees\u00a0and appraisal expenses:<\/strong>\u00a0upfront charges to secure construction financing and assess property value for lending purposes.<\/li>\n<li><strong>Monthly interest payments\u00a0on construction loans:<\/strong>\u00a0recurring charges that accumulate throughout the project timeline based on borrowed capital.<\/li>\n<li><strong>General liability insurance\u00a0and workers&#8217; compensation:<\/strong>\u00a0coverage protecting against accidents, injuries, and property damage during construction activities.<\/li>\n<li><strong>Performance bonds\u00a0and surety requirements:<\/strong>\u00a0financial guarantees ensuring contractors complete work according to contract terms and specifications.<\/li>\n<\/ul>\n<p>These costs are strictly time-dependent. Finish early and you save on interest and premiums. Run late and these costs multiply fast.<\/p>\n<h3>5. Marketing and customer acquisition<\/h3>\n<p>The completion of a project is rarely the final objective; the primary goal is successful adoption. Marketing soft costs encompass the strategic investments required to launch, promote, and sell the final output.<\/p>\n<p>For real estate developers, this includes brochures, model units, and broker commissions. For internal enterprise projects, this involves <a href=\"https:\/\/monday.com\/blog\/project-management\/change-management-tool\/\" target=\"_blank\" rel=\"noopener\">change management<\/a>, training sessions, and internal communication campaigns to ensure staff adoption of new processes.<\/p>\n<h3>6. Project management and oversight<\/h3>\n<p>Complex projects need dedicated leadership to stay on track. This category tracks:<\/p>\n<ul>\n<li><strong>Salaries and expenses\u00a0of the project management office:<\/strong>\u00a0compensation and operational costs for the PMO team coordinating project execution and strategic alignment.<\/li>\n<li><strong>Site superintendents\u00a0and owner&#8217;s representatives:<\/strong>\u00a0on-site leadership ensuring daily operations align with project specifications and owner expectations.<\/li>\n<li><strong>Project management software licenses\u00a0and communication platforms:<\/strong>\u00a0subscription costs for tools that enable task tracking, resource allocation, and team collaboration.<\/li>\n<li><strong>Travel expenses\u00a0for coordination meetings:<\/strong>\u00a0transportation and accommodation costs for stakeholder meetings and site visits across project locations.<\/li>\n<\/ul>\n<p>These costs scale with team size and geographic distribution.<\/p>\n<h3>7. Testing and commissioning services<\/h3>\n<p>The final phase is making sure everything works as planned. Soft costs include:<\/p>\n<ul>\n<li><strong>Third-party inspections\u00a0and quality assurance testing:<\/strong>\u00a0independent verification services ensuring deliverables meet specified standards and regulatory requirements.<\/li>\n<li><strong>Equipment commissioning\u00a0and system verification:<\/strong>\u00a0technical services confirming all systems operate correctly and integrate seamlessly before final handover.<\/li>\n<li><strong>Certification fees\u00a0and compliance documentation:<\/strong>\u00a0charges for official certifications and preparation of documentation proving regulatory adherence.<\/li>\n<\/ul>\n"},{"acf_fc_layout":"colored_notification","text":"<p>These happen at the end, but you need to budget for them upfront since they&#8217;re required for final handover. Teams streamline this with modern platforms like monday work management to track testing milestones and automate approvals.<\/p>\n","quote":false,"author":"","position":"","avatar":false}]},{"main_heading":"Why do soft costs determine project success?","content_block":[{"acf_fc_layout":"text","content":"<p>Soft costs tell you how healthy your project really is. Since they&#8217;re tied to time and efficiency, they show you how well you&#8217;re managing the project.<\/p>\n<p>These indirect expenses show how efficient your organization is and affect profitability in ways hard costs don&#8217;t.<\/p>\n<h3>The hidden drain on project profitability<\/h3>\n<p>Soft costs pile up throughout the project, often going unnoticed until they eat into your margins. Unlike a concrete purchase order, soft costs trickle in slowly through:<\/p>\n<ul>\n<li><strong>Additional consulting hours:<\/strong>\u00a0extended design phases requiring more expert input and review cycles.<\/li>\n<li><strong>Extended rental fees:<\/strong> prolonged equipment and temporary facility costs when projects run past scheduled completion dates.<\/li>\n<li><strong>Prolonged financing costs:<\/strong>\u00a0accumulating interest and loan fees resulting from schedule delays and timeline extensions.<\/li>\n<\/ul>\n<p>When these costs spiral, they eat into your planned ROI. A project budgeted for a 20% margin can easily drop to single digits if the timeline extends by a few months, just from soft costs piling up.<\/p>\n<h3>Portfolio-wide soft cost patterns<\/h3>\n<p>Looking at soft costs across your portfolio shows how efficient your organization really is. If every project consistently overspends on legal review or permitting, you&#8217;ve got a process problem, not a project problem.<\/p>\n<p>Tracking these patterns helps leadership spot bottlenecks that drive up costs everywhere. With monday work management, Portfolio Risk Insights scans all project boards and flags risks by severity, so you can allocate resources to fix the real problems.<\/p>\n<h3>Building realistic project margins<\/h3>\n<p>If you want to bid competitively and profitably, you need accurate soft cost estimates. Teams that use historical data to forecast soft costs can price projects more realistically.<\/p>\n<p>Instead of applying a generic percentage, teams build margins based on actual performance data. That way, the bid covers real costs and stays competitive.<\/p>\n<p><span style=\"color: #000000;\"><a class=\"cta-button blue-button\" aria-label=\"Try monday work management\" href=\"https:\/\/auth.monday.com\/users\/sign_up_new\" target=\"_blank\">Try monday work management<\/a><\/span><\/p>\n"}]},{"main_heading":"How to calculate soft costs percentage accurately?","content_block":[{"acf_fc_layout":"text","content":"<p>Accurate soft cost calculation requires a structured approach that moves beyond guesswork.<\/p>\n<p>Benchmarks give you a starting point, but adjust them based on your specific project. Here are typical soft cost percentages across different construction sectors:<\/p>\n\n<table id=\"tablepress-1838\" class=\"tablepress tablepress-id-1838\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">Project type<\/th><th class=\"column-2\">Typical soft cost range<\/th><th class=\"column-3\">Key drivers<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">Residential construction<\/td><td class=\"column-2\">15\u201325%<\/td><td class=\"column-3\">Marketing, sales commissions, design fees<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">Commercial construction<\/td><td class=\"column-2\">20\u201330%<\/td><td class=\"column-3\">Tenant improvements, legal fees, financing<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">Infrastructure projects<\/td><td class=\"column-2\">25\u201335%<\/td><td class=\"column-3\">Environmental studies, public consultation, engineering<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-1838 from cache -->\n<p>These variations are driven by factors like marketing, legal fees, and environmental studies.<\/p>\n<p>When finalizing your percentage, remember that soft costs do not scale linearly. While larger projects often benefit from economies of scale, highly complex or &#8220;first-of-its-kind&#8221; builds often face a complexity premium due to specialized engineering and intense regulatory scrutiny. To ensure your pricing remains competitive yet realistic, follow these five essential steps:<\/p>\n<h3>Step 1: analyze historical data<\/h3>\n<p>Review similar past projects to determine actual soft cost ratios within your <a href=\"https:\/\/monday.com\/blog\/project-management\/project-budget\/\" target=\"_blank\" rel=\"noopener\">project budget<\/a>. This gives you realistic expectations based on your own track record, not just industry averages.<\/p>\n<h3>Step 2: categorize expenses<\/h3>\n<p>Break down the project into the seven major categories and estimate each individually. This detailed approach keeps you from missing specific costs and makes tracking more accurate.<\/p>\n<h3>Step 3: apply vendor quotes<\/h3>\n<p>Use actual proposals from architects, consultants, and insurers rather than generic percentages. Real quotes provide defensible estimates that account for current market conditions.<\/p>\n<h3>Step 4: calculate time-based costs<\/h3>\n<p>Model financing and insurance costs based on the projected schedule. These expenses accumulate monthly, making timeline accuracy critical for budget precision.<\/p>\n<h3>Step 5: add contingency<\/h3>\n<p>Include a specific soft cost contingency (typically 5\u201310%) for regulatory delays or design changes. This buffer protects against common variables that inflate indirect expenses.<\/p>\n"}]},{"main_heading":"","content_block":[{"acf_fc_layout":"image","image_type":"normal","image":286834,"image_link":""}]},{"main_heading":"5 proven strategies to control soft costs","content_block":[{"acf_fc_layout":"text","content":"<p>Controlling soft costs requires proactive management and rigorous process discipline. These strategies help organizations maintain financial discipline over indirect expenses while preserving project quality and timeline adherence.<\/p>\n<p>Implementing these approaches creates systematic cost control that scales across project portfolios.<\/p>\n<h3>1. Create standardized cost categories<\/h3>\n<p>Standardization is the prerequisite for control. Organizations establish a consistent Cost Breakdown Structure that applies to every project in the portfolio.<\/p>\n<p>By defining exactly what constitutes administrative overhead or design fees through standardized <a href=\"https:\/\/monday.com\/blog\/project-management\/cost-management-software\/\" target=\"_blank\" rel=\"noopener\">cost categories<\/a>, teams ensure data is comparable across projects. Work management platforms facilitate this by:<\/p>\n<ul>\n<li><strong>Enforcing standardized budget templates:<\/strong>\u00a0consistent structures across all projects that prevent cost categorization inconsistencies.<\/li>\n<li><strong>Preventing teams from hiding soft costs:<\/strong> transparent tracking that eliminates miscellaneous buckets where expenses disappear.<\/li>\n<li><strong>Creating consistent reporting:<\/strong>\u00a0portfolio-level analysis enabled by uniform data collection and categorization.<\/li>\n<\/ul>\n<h3>2. Deploy real-time expense tracking<\/h3>\n<p>Waiting for end-of-month reconciliation is too late to control soft costs. Teams deploy real-time tracking that captures expenses as they&#8217;re incurred.<\/p>\n<p>With solutions like monday work management, dashboards automatically display live project data for insights on:<\/p>\n<ul>\n<li><strong>Budget performance:<\/strong>\u00a0real-time comparison against planned allocations showing exactly where money flows.<\/li>\n<li><strong>Goal achievement:<\/strong>\u00a0progress tracking relative to soft cost targets\u00a0and financial milestones.<\/li>\n<li><strong>Schedule adherence:<\/strong> timeline monitoring that reveals the direct impact on time-dependent costs.<\/li>\n<li><strong>Resource utilization:<\/strong>\u00a0allocation efficiency across project phases to identify waste and optimization opportunities.<\/li>\n<\/ul>\n<p>This immediate visibility enables course correction before the budget is exceeded.<\/p>\n<h3>3. Automate approval workflows<\/h3>\n<p>Manual approval processes create bottlenecks that inflate administrative soft costs. Automating these workflows ensures:<\/p>\n<ul>\n<li><strong>Purchase orders:<\/strong> instant movement through approval chains without manual routing delays.<\/li>\n<li><strong>Invoice approvals:<\/strong> streamlined processing that eliminates payment delays and late fees.<\/li>\n<li><strong>Change requests:<\/strong> immediate review routing without administrative lag or lost documentation.<\/li>\n<\/ul>\n<p>The platform sends approval notifications and reminders automatically. If a soft cost request exceeds the budget threshold, the system flags it for executive review.<\/p>\n<h3>4. Enable cross-team cost visibility<\/h3>\n<p>Silos hide costs. Making soft cost data visible to all relevant stakeholders creates a culture of accountability.<\/p>\n<p>When design teams see how their delays impact financing costs, or when legal teams understand the burn rate of stalled contracts, alignment improves. Dashboards that display real-time budget vs. actuals for soft costs keep the entire project team focused on financial efficiency.<\/p>\n<h3>5. Use predictive analytics for budgeting<\/h3>\n<p>Historical data is a powerful predictor of future performance. Organizations use predictive analytics to model potential soft cost scenarios based on past trends.<\/p>\n<p>If previous projects in a specific region consistently faced 20% higher permitting costs, the model adjusts future budgets accordingly. AI-powered analytics identify these risk patterns, allowing teams to build more resilient budgets.<\/p>\n<p><span style=\"color: #000000;\"><a class=\"cta-button blue-button\" aria-label=\"Try monday work management\" href=\"https:\/\/auth.monday.com\/users\/sign_up_new\" target=\"_blank\">Try monday work management<\/a><\/span><\/p>\n"}]},{"main_heading":"Transform soft cost chaos into strategic visibility with monday work management","content_block":[{"acf_fc_layout":"text","content":"<p>Managing soft costs requires a platform that connects financial data with operational reality. A unified work management solution brings these disparate elements together, providing a single source of truth for project budgets, timelines, and resources.<\/p>\n<p>Traditional approaches to soft cost management create blind spots that lead to budget overruns and missed deadlines. In contrast, integrated work management platforms eliminate these gaps through unified tracking and automated insights.<\/p>\n<p>The table below compares different approaches to soft cost management:<\/p>\n\n<table id=\"tablepress-1839\" class=\"tablepress tablepress-id-1839\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">Feature<\/th><th class=\"column-2\">Spreadsheets \/ manual<\/th><th class=\"column-3\">Legacy ERP systems<\/th><th class=\"column-4\">monday work management<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">Soft cost categorization<\/td><td class=\"column-2\">Manual entry, prone to error<\/td><td class=\"column-3\">Rigid, hard-coded categories<\/td><td class=\"column-4\">Flexible, AI-powered categorization<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">Real-time visibility<\/td><td class=\"column-2\">None (static data)<\/td><td class=\"column-3\">Delayed (batch processing)<\/td><td class=\"column-4\">Instant updates via live dashboards<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">Workflow automation<\/td><td class=\"column-2\">None<\/td><td class=\"column-3\">Complex, requires IT support<\/td><td class=\"column-4\">No-code, customizable automations<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">Cross-team collaboration<\/td><td class=\"column-2\">Fragmented (email\/chat)<\/td><td class=\"column-3\">Siloed by department<\/td><td class=\"column-4\">Contextual communication on items<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">Predictive insights<\/td><td class=\"column-2\">None<\/td><td class=\"column-3\">Limited to historical reporting<\/td><td class=\"column-4\">Portfolio Risk Insights for proactive alerts<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-1839 from cache -->\n<p>Specific capabilities for soft cost control\u00a0with monday work management include:<\/p>\n<ul>\n<li><strong>Portfolio Risk Insights:<\/strong> scans all active projects to identify budget anomalies and soft cost trends\u00a0across your entire portfolio.<\/li>\n<li><strong>AI blocks:<\/strong> automatically sorts expenses into defined soft cost buckets based on text descriptions\u00a0and historical patterns.<\/li>\n<li><strong>Dashboards:<\/strong> visualize soft cost burn rates against project milestones\u00a0with real-time data updates.<\/li>\n<li><strong>Automations:<\/strong> set up triggers that notify management when soft cost spending reaches 80% of allocated budget\u00a0thresholds.<\/li>\n<li><strong>Integrations:<\/strong> connect seamlessly with financial systems for accurate tracking\u00a0and synchronized data flow.<\/li>\n<\/ul>\n"},{"acf_fc_layout":"testimonials_carousel","testimonial_collection_select":14086,"tc_slide_to_show":"2"}]},{"main_heading":"Master soft cost management for sustainable project profitability","content_block":[{"acf_fc_layout":"text","content":"<p>Soft costs represent the invisible foundation of project success. While hard costs build the physical deliverable, soft costs determine whether that deliverable gets built on time, within budget, and according to specifications.<\/p>\n<p>Organizations that master soft cost management gain competitive advantages through more accurate bidding, improved profit margins, and reduced project risk. The key lies in treating these indirect expenses as strategic indicators rather than unavoidable overhead.<\/p>\n<p>Teams using monday work management transform soft cost tracking from reactive damage control into proactive financial strategy. Real-time visibility, automated workflows, and predictive analytics create the foundation for sustainable project profitability across entire portfolios.<\/p>\n<p><span style=\"color: #000000;\"><a class=\"cta-button blue-button\" aria-label=\"Try monday work management\" href=\"https:\/\/auth.monday.com\/users\/sign_up_new\" target=\"_blank\">Try monday work management<\/a><\/span><\/p>\n"}]},{"main_heading":"","content_block":[{"acf_fc_layout":"text","content":"<div class=\"accordion faq\" id=\"faq-frequently-asked-questions\">\n  <h2 class=\"accordion__heading section-title text-left\">Frequently asked questions<\/h2>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-frequently-asked-questions\" href=\"#q-frequently-asked-questions-1\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">What are examples of soft costs?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q-frequently-asked-questions-1\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-frequently-asked-questions\">\n      <p>Examples of soft costs include architectural design fees, legal permits, inspection fees, project management salaries, financing interest, and marketing expenses. These indirect expenses don't result in physical assets but are essential for project completion.<\/p>\n    <\/div>\n  <\/div>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-frequently-asked-questions\" href=\"#q-frequently-asked-questions-2\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">What is hard and soft cost?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q-frequently-asked-questions-2\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-frequently-asked-questions\">\n      <p>Hard costs refer to tangible physical assets like materials and labor, while soft costs refer to intangible services and fees required to complete the project. Hard costs create the physical deliverable, while soft costs enable the project to happen.<\/p>\n    <\/div>\n  <\/div>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-frequently-asked-questions\" href=\"#q-frequently-asked-questions-3\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">What are soft costs in accounting?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q-frequently-asked-questions-3\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-frequently-asked-questions\">\n      <p>In accounting, soft costs are indirect expenses that may be capitalized or expensed immediately, depending on whether they add long-term value to the property. These costs are tracked separately from direct construction or production expenses.<\/p>\n    <\/div>\n  <\/div>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-frequently-asked-questions\" href=\"#q-frequently-asked-questions-4\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">What is another name for soft costs?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q-frequently-asked-questions-4\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-frequently-asked-questions\">\n      <p>Soft costs are frequently referred to as indirect costs, administrative costs, or paper costs in various industries. These terms all describe expenses that support but don't directly create the physical project deliverable.<\/p>\n    <\/div>\n  <\/div>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-frequently-asked-questions\" href=\"#q-frequently-asked-questions-5\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">How do soft costs affect project ROI?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q-frequently-asked-questions-5\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-frequently-asked-questions\">\n      <p>Soft costs reduce ROI by increasing the total investment required without adding direct physical value. Uncontrolled soft costs erode profit margins and extend the time to break-even, making accurate tracking essential for maintaining project profitability.<\/p>\n    <\/div>\n  <\/div>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-frequently-asked-questions\" href=\"#q-frequently-asked-questions-6\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">Can soft costs be capitalized?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q-frequently-asked-questions-6\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-frequently-asked-questions\">\n      <p>Many soft costs like architectural fees and construction interest can be capitalized and depreciated over the asset's life, subject to specific accounting standards. The treatment depends on whether the costs add lasting value to the property or asset being created.<\/p>\n    <\/div>\n  <\/div>\n  <script type='application\/ld+json'>{\n    \"@context\": \"https:\\\/\\\/schema.org\",\n    \"@type\": \"FAQPage\",\n    \"mainEntity\": [\n        {\n            \"@type\": \"Question\",\n            \"name\": \"What are examples of soft costs?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>Examples of soft costs include architectural design fees, legal permits, inspection fees, project management salaries, financing interest, and marketing expenses. These indirect expenses don't result in physical assets but are essential for project completion.<\\\/p>\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"What is hard and soft cost?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>Hard costs refer to tangible physical assets like materials and labor, while soft costs refer to intangible services and fees required to complete the project. Hard costs create the physical deliverable, while soft costs enable the project to happen.<\\\/p>\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"What are soft costs in accounting?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>In accounting, soft costs are indirect expenses that may be capitalized or expensed immediately, depending on whether they add long-term value to the property. These costs are tracked separately from direct construction or production expenses.<\\\/p>\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"What is another name for soft costs?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>Soft costs are frequently referred to as indirect costs, administrative costs, or paper costs in various industries. These terms all describe expenses that support but don't directly create the physical project deliverable.<\\\/p>\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"How do soft costs affect project ROI?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>Soft costs reduce ROI by increasing the total investment required without adding direct physical value. Uncontrolled soft costs erode profit margins and extend the time to break-even, making accurate tracking essential for maintaining project profitability.<\\\/p>\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Can soft costs be capitalized?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>Many soft costs like architectural fees and construction interest can be capitalized and depreciated over the asset's life, subject to specific accounting standards. The treatment depends on whether the costs add lasting value to the property or asset being created.<\\\/p>\\n\"\n            }\n        }\n    ]\n}<\/script><\/div>\n\n"}]}]}],"faqs":[{"faq_title":"Frequently asked questions","faq_shortcode":"frequently-asked-questions","faq":[{"question":"What are examples of soft costs?","answer":"<p>Examples of soft costs include architectural design fees, legal permits, inspection fees, project management salaries, financing interest, and marketing expenses. These indirect expenses don't result in physical assets but are essential for project completion.<\/p>\n"},{"question":"What is hard and soft cost?","answer":"<p>Hard costs refer to tangible physical assets like materials and labor, while soft costs refer to intangible services and fees required to complete the project. Hard costs create the physical deliverable, while soft costs enable the project to happen.<\/p>\n"},{"question":"What are soft costs in accounting?","answer":"<p>In accounting, soft costs are indirect expenses that may be capitalized or expensed immediately, depending on whether they add long-term value to the property. These costs are tracked separately from direct construction or production expenses.<\/p>\n"},{"question":"What is another name for soft costs?","answer":"<p>Soft costs are frequently referred to as indirect costs, administrative costs, or paper costs in various industries. These terms all describe expenses that support but don't directly create the physical project deliverable.<\/p>\n"},{"question":"How do soft costs affect project ROI?","answer":"<p>Soft costs reduce ROI by increasing the total investment required without adding direct physical value. Uncontrolled soft costs erode profit margins and extend the time to break-even, making accurate tracking essential for maintaining project profitability.<\/p>\n"},{"question":"Can soft costs be capitalized?","answer":"<p>Many soft costs like architectural fees and construction interest can be capitalized and depreciated over the asset's life, subject to specific accounting standards. The treatment depends on whether the costs add lasting value to the property or asset being created.<\/p>\n"}]}],"parse_from_google_doc":false,"lobby_image":false,"post_thumbnail_title":"","hide_post_info":false,"hide_bottom_cta":false,"hide_from_blog":false,"landing_page_layout":false,"hide_time_to_read":false,"sidebar_color_banner":"","custom_tags":false,"disclaimer":[{"ID":145596,"post_author":"246","post_date":"2023-12-06 07:48:09","post_date_gmt":"2023-12-06 07:48:09","post_content":"<i>The content in this article is provided for informational purposes only and, to the best of monday.com\u2019s knowledge, the information provided in this article\u00a0 is accurate and up-to-date at the time of publication. That said, monday.com encourages readers to verify all information directly.<\/i>","post_title":"Competitor disclaimer","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"competitor-disclaimer","to_ping":"","pinged":"","post_modified":"2024-10-15 07:24:02","post_modified_gmt":"2024-10-15 07:24:02","post_content_filtered":"","post_parent":0,"guid":"https:\/\/monday.com\/blog\/?post_type=disclaimer&#038;p=145596","menu_order":0,"post_type":"disclaimer","post_mime_type":"","comment_count":"0","filter":"raw"}],"cornerstone_hero_cta_override":{"label":"","url":""},"menu_cta_override":{"label":"","url":""},"show_contact_sales_button":"default","override_contact_sales_label":"","override_contact_sales_url":"","show_sidebar_sticky_banner":false,"cluster":"","display_dates":"default","featured_image_link":"","activate_cta_banner":false,"banner_url":"","main_text_banner":"","sub_title_banner":"","sub_title_banner_second":"","banner_button_text":"","below_banner_line":"","custom_header_banner":false,"use_customized_cta":false,"custom_schema_code":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.6 (Yoast SEO v26.6) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Soft Costs Explained: What They Are And Why They Matter<\/title>\n<meta name=\"description\" content=\"Soft costs are indirect project expenses like permits, design, and financing that impact budgets. Learn to track and manage them effectively.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/monday.com\/blog\/project-management\/soft-costs\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Soft costs explained: manage project budgets effectively (2026)\" \/>\n<meta property=\"og:description\" content=\"Soft costs are indirect project expenses like permits, design, and financing that impact budgets. Learn to track and manage them effectively.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/monday.com\/blog\/project-management\/soft-costs\/\" \/>\n<meta property=\"og:site_name\" content=\"monday.com Blog\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-21T11:53:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-24T11:34:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2018\/02\/22852120_1266763086768693_6004893502123596052_n.png\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"960\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Sean O&#039;Connor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sean O&#039;Connor\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/monday.com\/blog\/project-management\/soft-costs\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/monday.com\/blog\/project-management\/soft-costs\/\"},\"author\":{\"name\":\"Sean O'Connor\",\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/person\/2af9116fd41597bd07fdde2e9d6e6b2c\"},\"headline\":\"Soft costs explained: manage project budgets effectively (2026)\",\"datePublished\":\"2026-01-21T11:53:12+00:00\",\"dateModified\":\"2026-02-24T11:34:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/monday.com\/blog\/project-management\/soft-costs\/\"},\"wordCount\":7,\"publisher\":{\"@id\":\"https:\/\/monday.com\/blog\/#organization\"},\"articleSection\":[\"Project management\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/monday.com\/blog\/project-management\/soft-costs\/\",\"url\":\"https:\/\/monday.com\/blog\/project-management\/soft-costs\/\",\"name\":\"Soft Costs Explained: What They Are And Why They Matter\",\"isPartOf\":{\"@id\":\"https:\/\/monday.com\/blog\/#website\"},\"datePublished\":\"2026-01-21T11:53:12+00:00\",\"dateModified\":\"2026-02-24T11:34:22+00:00\",\"description\":\"Soft costs are indirect project expenses like permits, design, and financing that impact budgets. Learn to track and manage them effectively.\",\"breadcrumb\":{\"@id\":\"https:\/\/monday.com\/blog\/project-management\/soft-costs\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/monday.com\/blog\/project-management\/soft-costs\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/monday.com\/blog\/project-management\/soft-costs\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/monday.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project management\",\"item\":\"https:\/\/monday.com\/blog\/project-management\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Soft costs explained: manage project budgets effectively (2026)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/monday.com\/blog\/#website\",\"url\":\"https:\/\/monday.com\/blog\/\",\"name\":\"monday.com Blog\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/monday.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/monday.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/monday.com\/blog\/#organization\",\"name\":\"monday.com Blog\",\"url\":\"https:\/\/monday.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/res.cloudinary.com\/monday-blogs\/fl_lossy,f_auto,q_auto\/wp-blog\/2020\/12\/monday.com-logo-1.png\",\"contentUrl\":\"https:\/\/res.cloudinary.com\/monday-blogs\/fl_lossy,f_auto,q_auto\/wp-blog\/2020\/12\/monday.com-logo-1.png\",\"width\":200,\"height\":200,\"caption\":\"monday.com Blog\"},\"image\":{\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/person\/2af9116fd41597bd07fdde2e9d6e6b2c\",\"name\":\"Sean O'Connor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/09\/Sean-OConnor-Bio-Image-150x150.jpg\",\"contentUrl\":\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/09\/Sean-OConnor-Bio-Image-150x150.jpg\",\"caption\":\"Sean O'Connor\"},\"description\":\"Sean is a vastly experienced content specialist with more than 15 years of expertise in shaping strategies that improve productivity and collaboration. He writes about digital workflows, project management, and the tools that make modern teams thrive. Sean\u2019s passion lies in creating engaging content that helps businesses unlock new levels of efficiency and growth.\",\"sameAs\":[\"https:\/\/neongorilla.co.uk\/\",\"https:\/\/www.linkedin.com\/in\/sean-o-connor-2a448a5a\/\"],\"jobTitle\":\"Content specialist and digital workflows writer\",\"url\":\"https:\/\/monday.com\/blog\/author\/sean-from-neon-gorillas\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Soft Costs Explained: What They Are And Why They Matter","description":"Soft costs are indirect project expenses like permits, design, and financing that impact budgets. Learn to track and manage them effectively.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/monday.com\/blog\/project-management\/soft-costs\/","og_locale":"en_US","og_type":"article","og_title":"Soft costs explained: manage project budgets effectively (2026)","og_description":"Soft costs are indirect project expenses like permits, design, and financing that impact budgets. Learn to track and manage them effectively.","og_url":"https:\/\/monday.com\/blog\/project-management\/soft-costs\/","og_site_name":"monday.com Blog","article_published_time":"2026-01-21T11:53:12+00:00","article_modified_time":"2026-02-24T11:34:22+00:00","og_image":[{"width":960,"height":960,"url":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2018\/02\/22852120_1266763086768693_6004893502123596052_n.png","type":"image\/png"}],"author":"Sean O'Connor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Sean O'Connor"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/monday.com\/blog\/project-management\/soft-costs\/#article","isPartOf":{"@id":"https:\/\/monday.com\/blog\/project-management\/soft-costs\/"},"author":{"name":"Sean O'Connor","@id":"https:\/\/monday.com\/blog\/#\/schema\/person\/2af9116fd41597bd07fdde2e9d6e6b2c"},"headline":"Soft costs explained: manage project budgets effectively (2026)","datePublished":"2026-01-21T11:53:12+00:00","dateModified":"2026-02-24T11:34:22+00:00","mainEntityOfPage":{"@id":"https:\/\/monday.com\/blog\/project-management\/soft-costs\/"},"wordCount":7,"publisher":{"@id":"https:\/\/monday.com\/blog\/#organization"},"articleSection":["Project management"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/monday.com\/blog\/project-management\/soft-costs\/","url":"https:\/\/monday.com\/blog\/project-management\/soft-costs\/","name":"Soft Costs Explained: What They Are And Why They Matter","isPartOf":{"@id":"https:\/\/monday.com\/blog\/#website"},"datePublished":"2026-01-21T11:53:12+00:00","dateModified":"2026-02-24T11:34:22+00:00","description":"Soft costs are indirect project expenses like permits, design, and financing that impact budgets. Learn to track and manage them effectively.","breadcrumb":{"@id":"https:\/\/monday.com\/blog\/project-management\/soft-costs\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/monday.com\/blog\/project-management\/soft-costs\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/monday.com\/blog\/project-management\/soft-costs\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/monday.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Project management","item":"https:\/\/monday.com\/blog\/project-management\/"},{"@type":"ListItem","position":3,"name":"Soft costs explained: manage project budgets effectively (2026)"}]},{"@type":"WebSite","@id":"https:\/\/monday.com\/blog\/#website","url":"https:\/\/monday.com\/blog\/","name":"monday.com Blog","description":"","publisher":{"@id":"https:\/\/monday.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/monday.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/monday.com\/blog\/#organization","name":"monday.com Blog","url":"https:\/\/monday.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/monday.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/res.cloudinary.com\/monday-blogs\/fl_lossy,f_auto,q_auto\/wp-blog\/2020\/12\/monday.com-logo-1.png","contentUrl":"https:\/\/res.cloudinary.com\/monday-blogs\/fl_lossy,f_auto,q_auto\/wp-blog\/2020\/12\/monday.com-logo-1.png","width":200,"height":200,"caption":"monday.com Blog"},"image":{"@id":"https:\/\/monday.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/monday.com\/blog\/#\/schema\/person\/2af9116fd41597bd07fdde2e9d6e6b2c","name":"Sean O'Connor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/monday.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/09\/Sean-OConnor-Bio-Image-150x150.jpg","contentUrl":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/09\/Sean-OConnor-Bio-Image-150x150.jpg","caption":"Sean O'Connor"},"description":"Sean is a vastly experienced content specialist with more than 15 years of expertise in shaping strategies that improve productivity and collaboration. He writes about digital workflows, project management, and the tools that make modern teams thrive. Sean\u2019s passion lies in creating engaging content that helps businesses unlock new levels of efficiency and growth.","sameAs":["https:\/\/neongorilla.co.uk\/","https:\/\/www.linkedin.com\/in\/sean-o-connor-2a448a5a\/"],"jobTitle":"Content specialist and digital workflows writer","url":"https:\/\/monday.com\/blog\/author\/sean-from-neon-gorillas\/"}]}},"auth_debug":{"user_exists":false,"user_id":0,"user_login":null,"roles":[],"authenticated":false,"get_current_user_id":0},"_links":{"self":[{"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/posts\/286842","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/users\/295"}],"replies":[{"embeddable":true,"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/comments?post=286842"}],"version-history":[{"count":5,"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/posts\/286842\/revisions"}],"predecessor-version":[{"id":308038,"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/posts\/286842\/revisions\/308038"}],"wp:attachment":[{"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/media?parent=286842"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/categories?post=286842"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/tags?post=286842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}