{"id":19586,"date":"2020-10-01T23:22:26","date_gmt":"2020-10-01T23:22:26","guid":{"rendered":"https:\/\/staging-mondaycomblog.kinsta.cloud\/?post_type=pm&#038;p=19586"},"modified":"2025-11-09T05:45:41","modified_gmt":"2025-11-09T10:45:41","slug":"critical-paths","status":"publish","type":"post","link":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/","title":{"rendered":"How to Use the Critical Path Method (CPM) in Project Management [2024]"},"content":{"rendered":"<p class=\"p1\">A critical path is a method used by project managers to prioritize tasks and deliver a project on time. But unlike most <a href=\"https:\/\/monday.com\/blog\/project-management\/guide-to-project-management\/\" target=\"_blank\" rel=\"noopener\"><span class=\"s1\">project management<\/span><\/a> concepts, the title of this one doesn\u2019t give much away.<\/p>\n<p class=\"p1\">That\u2019s why we\u2019ve created this no-nonsense guide to help you understand what critical paths are, why they\u2019re important, and how to implement them. Plus, we\u2019ll show you how the critical path feature in monday work management can make your job easier.<\/p>\n<p style=\"text-align: left;\"><strong><a class=\"cta-button blue-button\" aria-label=\"Get started\" href=\"https:\/\/auth.monday.com\/users\/sign_up_new\" target=\"_blank\">Get started<\/a><\/strong><\/p>\n<h2>What is a critical path?<\/h2>\n<p class=\"p1\">A <b>critical path<\/b> is the longest sequence of dependent tasks that must be completed to execute a project. The tasks are called critical activities because the whole project runs over if they\u2019re delayed.<\/p>\n<p class=\"p1\">For example, if you&#8217;re building a house, the critical path might include activities like digging the foundations, building the walls, and installing the roof. If any of these critical activities fall behind schedule the whole project gets delayed.<\/p>\n<p class=\"p1\">Project managers use the <b>critical path method (CPM)<\/b> to find the critical path. The CPM \u2014 also known as <b>critical path analysis (CPA)<\/b> \u2014 is a project management technique used to plan and schedule complex projects. It\u2019s an algorithm that identifies the longest sequence of dependent activities and measures the time required to complete them from start to finish.<\/p>\n<h3>What does a critical path look like?<\/h3>\n<p class=\"p1\">Asking what a critical path looks like is like asking, \u201chow long is a piece of string?\u201d \u2014 i.e. there\u2019s no definitive answer.<\/p>\n<p class=\"p1\">Traditionally, the critical path was a flow chart. For example, some house-building activities take longer than others, so the critical path highlights the longest duration:<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-135592\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-diagram.png\" alt=\"Simplified critical path flow chart\" width=\"975\" height=\"325\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-diagram.png 975w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-diagram-300x100.png 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-diagram-768x256.png 768w\" sizes=\"(max-width: 975px) 100vw, 975px\" \/><\/p>\n<p class=\"p1\"><a href=\"https:\/\/www.workamajig.com\/blog\/critical-path-method\" target=\"_blank\" rel=\"nofollow noopener\">[Image source]<\/a><\/p>\n<p class=\"p1\">A more complex diagram might look like this:<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-135586\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-graph.jpg\" alt=\"Early example of a critical path flow chart\" width=\"585\" height=\"744\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-graph.jpg 585w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-graph-236x300.jpg 236w\" sizes=\"(max-width: 585px) 100vw, 585px\" \/><\/p>\n<p class=\"p1\"><a href=\"https:\/\/hbr.org\/1963\/09\/the-abcs-of-the-critical-path-method\" target=\"_blank\" rel=\"nofollow noopener\">[Image source]<\/a><\/p>\n<p class=\"p1\">Nowadays, other more visually appealing ways of presenting a critical path exist. For example, using a <a href=\"https:\/\/monday.com\/blog\/project-management\/everything-you-want-to-know-about-gantt-charts\/\" target=\"_blank\" rel=\"noopener\"><span class=\"s1\">Gantt chart<\/span><\/a> allows you to visualize the critical activities:<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-135602\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-client-projects-gantt-chart-1024x563.jpg\" alt=\"Using a Gantt chart allows you to visualize the critical activities\" width=\"1024\" height=\"563\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-client-projects-gantt-chart-1024x563.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-client-projects-gantt-chart-300x165.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-client-projects-gantt-chart-768x422.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-client-projects-gantt-chart-1536x844.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-client-projects-gantt-chart.jpg 1820w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<h3 class=\"p1\">Critical path vs. critical chain<\/h3>\n<p class=\"p2\">Critical path and critical chain are two different approaches to completing a project.<\/p>\n<p class=\"p1\">The <strong>critical chain<\/strong> methodology pinpoints the bottlenecks or limiting factors that can cause businesses to miss project deadlines. It focuses on monitoring the use of resources \u2014 like materials and labor. For example, a project manager might delay the start of one task so that a skilled worker does not have to perform two tasks at the same time.<\/p>\n<p class=\"p2\">The<b> critical path<\/b> focuses on task management, assumes unlimited resources, and identifies the longest track of tasks. It helps identify tasks that may cause project delays and guides project managers to take preventive measures from the start.<\/p>\n<p class=\"p2\">On the other hand,<b> <\/b>the<b> critical chain<\/b> focuses on resource and buffer management, assumes limited resources, and identifies the longest chain of dependent events. It inserts buffers between dependent events to protect the project from delays.<\/p>\n<h3 class=\"p1\">Critical path vs. critical activity<\/h3>\n<p class=\"p2\">Critical path and critical activity are related concepts in project management, both determined by the critical path method (CPM).<\/p>\n<p class=\"p2\">The <b>critical path<\/b> is the longest sequence of tasks that must be completed for the project and comprises critical activities. Any delay in completing tasks on the critical path will also delay the project.<\/p>\n<p class=\"p2\">A <b>critical activity<\/b> is a specific scheduled activity that is part of the critical path. It\u2019s essential to the project\u2019s timeline, and any delay in completing a critical activity will delay the entire project.<\/p>\n<p class=\"p2\">For example, if it takes twice as long to dig the foundations for a new house, then the entire house building project gets delayed. A critical activity typically has zero float, meaning there\u2019s no flexibility in the start or finish dates.<\/p>\n<h3 class=\"p1\">Critical path vs. PERT<\/h3>\n<p class=\"p2\">The critical path and PERT (Program Evaluation and Review Technique) are tools for planning and controlling projects.<\/p>\n<p class=\"p1\"><strong>PERT<\/strong> is a framework to map out task dependencies and estimate how long a project will last. It\u2019s a statistical tool to visualize the overall project schedule \u2014 not just the critical path \u2014 and shows the relationship between tasks as well as the overall project duration.<\/p>\n<p class=\"p1\">For example, a project with seven key activities and a total project duration of 14 days, could have a chart that looks like this:<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-83535\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/10\/project-management-techniques-PERT-chart.png\" alt=\"project management techniques\" width=\"787\" height=\"396\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/10\/project-management-techniques-PERT-chart.png 787w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/10\/project-management-techniques-PERT-chart-300x151.png 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/10\/project-management-techniques-PERT-chart-768x386.png 768w\" sizes=\"(max-width: 787px) 100vw, 787px\" \/><\/p>\n<p class=\"p2\">The <b>critical path<\/b> is used to schedule and manage project tasks, focusing on the longest sequence of tasks and considering task dependencies and slack time. It is suitable for projects with predictable task durations.<\/p>\n<p class=\"p2\">On the other hand, <b>PERT<\/b> is used to calculate the time required to complete project activities, especially when task durations are variable and uncertain. It allows for flexibility in scheduling and focuses on time estimation and uncertainty.<\/p>\n<h3 class=\"p1\">Critical path vs. Gantt chart<\/h3>\n<p class=\"p2\">The critical path and <a href=\"https:\/\/monday.com\/blog\/project-management\/everything-you-want-to-know-about-gantt-charts\/\" target=\"_blank\" rel=\"noopener\"><span class=\"s1\">Gantt chart<\/span><\/a> are both project management visualization tools, but they serve different purposes.<\/p>\n<p class=\"p2\">The <b>critical path<\/b> helps schedule and manage project tasks, taking into account task dependencies and slack time. It\u2019s suitable for projects with predictable task durations.<\/p>\n<p class=\"p2\">On the other hand, a <b>Gantt chart<\/b> provides a visual overview of tasks, durations, and dependencies in a project schedule. It helps track progress, allocate resources, and communicate project timelines.<\/p>\n<p class=\"p2\">While a Gantt chart can highlight the critical path, its primary purpose is to visualize the project schedule.<\/p>\n<h2 class=\"p1\">What are the benefits of the critical path method?<\/h2>\n<p class=\"p2\">The critical path method (CPM) offers improved project planning, enhanced scheduling, clearer communication, effective resource management, tighter cost control, risk detection, and better project management.<\/p>\n<h3>1. Enhances project planning<\/h3>\n<p class=\"p2\">The CPM provides a structured approach to project planning by identifying the sequence of activities and their dependencies. This helps project managers create a realistic and robust project schedule.<\/p>\n<h3 class=\"p1\">2. Helps prioritize tasks<\/h3>\n<p class=\"p2\">The CPM identifies the critical tasks and determines the critical path. This helps project managers prioritize tasks effectively and determine where and how to allocate resources.<\/p>\n<h3 class=\"p1\">3. Improves team communication<\/h3>\n<p class=\"p2\">The CPM requires input from key stakeholders, including team members and subcontractors. This collaboration ensures everyone understands the project timeline and dependencies, leading to better communication and coordination.<\/p>\n<h3 class=\"p1\">4. Facilitates more effective resource management<\/h3>\n<p class=\"p2\">The CPM helps project managers identify resource requirements for each activity. Project managers can allocate resources efficiently by understanding the critical path and resource dependencies, minimizing bottlenecks and unexpected delays.<\/p>\n<h3 class=\"p1\">5. Tightens cost control<\/h3>\n<p class=\"p2\">The CPM assists project managers in controlling costs by allocating the right resources to the right places. This reduces the chances of unexpected delays that may incur additional costs.<\/p>\n<h3 class=\"p1\">6. Detects potential risks<\/h3>\n<p class=\"p2\">The CPM allows project managers to identify potential risks and their impact on the project schedule. By analyzing the critical path and considering the float or slack time, project managers can predict the effects of delays and make adjustments to mitigate risks.<\/p>\n<h3 class=\"p1\">7. Improves project management<\/h3>\n<p class=\"p2\">The CPM enables project managers to clearly communicate project plans, schedules, and performance. This clarity helps them monitor progress, identify issues, and make informed decisions.<\/p>\n<p class=\"p2\"><strong>To summarize:<\/strong> by utilizing the CPM, project managers can optimize project timelines, allocate resources effectively, and mitigate risks, leading to successful project completion.<\/p>\n<h2>How to find the critical path<\/h2>\n<p class=\"p1\">Now, let\u2019s identify the critical path from start to finish.<\/p>\n<h3 class=\"p1\">1. List all your project tasks<\/h3>\n<p class=\"p1\">Before you even think about a critical path, you need to list what tasks to include in the project \u2014 i.e. your <a href=\"https:\/\/monday.com\/blog\/project-management\/your-quick-start-guide-to-work-breakdown-structure\/\" target=\"_blank\" rel=\"noopener\"><span class=\"s1\">work breakdown structure<\/span><\/a>.<\/p>\n<p class=\"p1\">Spend some time speaking with stakeholders to confirm the project details. Once you have all the information, you can identify all the activities that must happen to complete the project.<\/p>\n<h3>2. Put all the tasks in order<\/h3>\n<p class=\"p1\">Once you\u2019ve identified the tasks, it\u2019s time to put them in chronological order and identify any task dependencies. This will help you work out the project timeline.<\/p>\n<p class=\"p1\"><i>So what\u2019s the best way to put them in order?<\/i><\/p>\n<p class=\"p1\">Whether you\u2019d prefer to create a project roadmap, tracker, or overview, using an efficient, easy-to-use work management software \u2014 like <a href=\"https:\/\/monday.com\/work-management\" target=\"_blank\" rel=\"noopener\"><span class=\"s1\">monday work management<\/span><\/a> \u2014 simplifies the process by giving you a clear visualization of all your tasks:<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-135608\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-management-overview-1024x563.jpg\" alt=\"Work management software \u2014 like monday work management \u2014 simplifies the project planning process.\" width=\"1024\" height=\"563\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-management-overview-1024x563.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-management-overview-300x165.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-management-overview-768x422.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-management-overview-1536x844.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-management-overview.jpg 1820w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><strong><a class=\"cta-button blue-button\" aria-label=\"Get started\" href=\"https:\/\/auth.monday.com\/users\/sign_up_new\" target=\"_blank\">Get started<\/a><\/strong><\/p>\n<h3>3. Estimate how long each task will take<\/h3>\n<p class=\"p1\">There are several ways to estimate activity duration. To save you from sifting through all the methods out there, we\u2019ve outlined our top three:<\/p>\n<ul>\n<li><b>Bottom-up estimating: <\/b>Add up the estimates of the lowest-level work tasks to arrive at your summary total. Bottom-up estimates take more time to complete, but they also are more accurate than other estimates.<\/li>\n<li><b>Comparative estimating:<\/b> Base your estimates on similar work or projects completed in the past. If you used time tracking in previous tasks, you\u2019ll see precisely how long they took.<\/li>\n<li><strong><strong>Parametric estimating: <\/strong><\/strong>Calculate a portion of the work and then multiply to get the overall estimate \u2014 e.g. if you believe one ad takes 2 hours and you have five ads to do, it should take 10 hours in total.<\/li>\n<\/ul>\n<h3>4. Find all the potential &#8216;paths&#8217; or &#8216;strings&#8217;<\/h3>\n<p class=\"p1\">Any project can have multiple paths or strings of connected and dependent tasks.<\/p>\n<p class=\"p1\">This part of the process involves finding all these possible paths and calculating how long each one will take so that you can pinpoint the one with the longest duration.<\/p>\n<p class=\"p1\">By hand, this can be a headache with a high chance of error, which is not ideal. Fortunately, project management platforms, like monday work management, can do this automatically.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-135621\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-monday-work-management-gantt-chart-1024x576.jpg\" alt=\"monday work management can find all the possible critical paths and calculate how long each one will take so that you can pinpoint the one with the longest duration.\" width=\"1024\" height=\"576\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-monday-work-management-gantt-chart-1024x576.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-monday-work-management-gantt-chart-300x169.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-monday-work-management-gantt-chart-768x432.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-monday-work-management-gantt-chart-1536x864.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-monday-work-management-gantt-chart-2048x1152.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p class=\"p1\"><strong><a class=\"cta-button blue-button\" aria-label=\"Get started\" href=\"https:\/\/auth.monday.com\/users\/sign_up_new\" target=\"_blank\">Get started<\/a><\/strong><\/p>\n<h3>5. Identify the critical path<\/h3>\n<p class=\"p1\">Now for the main event \u2014 it\u2019s time to find the critical path.<\/p>\n<p class=\"p1\">Once you \u2014 or your work management software \u2014 have listed all the paths and strings, you need to identify the longest path through the project from start to finish.<\/p>\n<p class=\"p1\">So, if you\u2019ve got a string of tasks that takes eight days, one that takes six days, and another that takes 12, then the 12-day string is the critical path. It\u2019s the one that can\u2019t have any delays without moving out your project end date.<\/p>\n<h3>6. Monitor the critical path<\/h3>\n<p class=\"p1\">The critical path can, and most likely will, change throughout the project. Some tasks may take longer than expected, or new tasks get added over time.<\/p>\n<p class=\"p1\">Any changes to the project can have a knock-on effect on the critical path. This means you\u2019ll need to check continuously throughout the project and update your critical path diagram accordingly.<\/p>\n<p class=\"p1\"><i>We know it\u2019s not ideal. <\/i>One of the limitations of using the critical path project management method is its lack of flexibility. That\u2019s why we created a critical path feature in monday work management that accounts for more flexibility.<\/p>\n<h2 class=\"p1\">Manage your critical paths with monday work management<\/h2>\n<p class=\"p1\">The <a href=\"https:\/\/monday.com\/work-management\" target=\"_blank\" rel=\"noopener\"><span class=\"s1\">monday work management<\/span><\/a> critical path feature makes your team more aware and efficient by visually displaying each project\u2019s duration.<\/p>\n<p class=\"p1\">Once you add this feature to your Gantt Chart, it highlights the critical path in your project\u2019s timeline \u2014 the events that must be completed on time for the overall project to finish on schedule.<\/p>\n<p class=\"p1\">Moreover, the software monitors any changes in critical path activity and automatically updates the current critical path in your project plan, so you don\u2019t have to.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter wp-image-92121 size-full\" title=\"Critical path activity\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2020\/10\/cp.gif\" alt=\"\" width=\"1361\" height=\"703\" \/><\/p>\n<p><strong><a class=\"cta-button blue-button\" aria-label=\"Get started\" href=\"https:\/\/auth.monday.com\/users\/sign_up_new\" target=\"_blank\">Get started<\/a><\/strong><\/p>\n<h2>Start identifying critical paths today<\/h2>\n<p class=\"p1\">So there you have it \u2014 a simple, no-nonsense guide to critical paths, including their definition, benefits, and how to identify them in your projects.<\/p>\n<p class=\"p1\">Now you know what\u2019s what, why not check out some <a href=\"https:\/\/monday.com\/blog\/project-management\/the-complete-project-management-software-list\/\" target=\"_blank\" rel=\"noopener\"><span class=\"s1\">project management software<\/span><\/a> that enables you to implement critical paths within your projects?<\/p>\n<div class=\"accordion faq\" id=\"faq-critical-path\">\n  <h2 class=\"accordion__heading section-title text-left\">Critical path FAQs<\/h2>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-critical-path\" href=\"#q-critical-path-1\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">Why is the critical path important in project management?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q-critical-path-1\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-critical-path\">\n      <p>The critical path is important in project management because it helps estimate the project duration accurately, identify critical activities that must be completed on time, and highlight task dependencies, resource constraints, and potential risks.\u00a0<\/p>\n    <\/div>\n  <\/div>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-critical-path\" href=\"#q-critical-path-2\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">What are non-critical activities?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q-critical-path-2\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-critical-path\">\n      <p>Non-critical activities are tasks that can be delayed beyond their allotted deadline without affecting the project's overall duration. These activities have slack time and are not part of the critical path.<\/p>\n    <\/div>\n  <\/div>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-critical-path\" href=\"#q-critical-path-3\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">Can a project have multiple critical paths?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q-critical-path-3\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-critical-path\">\n      <p>Yes, a project can have multiple critical paths. In complex projects, you can have multiple sequences of activities that are equally critical and must be completed on time for the project to run on schedule.<\/p>\n    <\/div>\n  <\/div>\n  <script type='application\/ld+json'>{\n    \"@context\": \"https:\\\/\\\/schema.org\",\n    \"@type\": \"FAQPage\",\n    \"mainEntity\": [\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Why is the critical path important in project management?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>The critical path is important in project management because it helps estimate the project duration accurately, identify critical activities that must be completed on time, and highlight task dependencies, resource constraints, and potential risks.\\u00a0<\\\/p>\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"What are non-critical activities?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>Non-critical activities are tasks that can be delayed beyond their allotted deadline without affecting the project's overall duration. These activities have slack time and are not part of the critical path.<\\\/p>\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Can a project have multiple critical paths?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>Yes, a project can have multiple critical paths. In complex projects, you can have multiple sequences of activities that are equally critical and must be completed on time for the project to run on schedule.<\\\/p>\\n\"\n            }\n        }\n    ]\n}<\/script><\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>A critical path is a method used by project managers to prioritize tasks and deliver a project on time. But unlike most project management concepts, the title of this one doesn\u2019t give much away. That\u2019s why we\u2019ve created this no-nonsense guide to help you understand what critical paths are, why &#8230;<\/p>\n","protected":false},"author":213,"featured_media":135580,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"pages\/cornerstone-primary.php","format":"standard","meta":{"_acf_changed":false,"_yoast_wpseo_title":"How to Use the Critical Path Method (CPM) in Project Management","_yoast_wpseo_metadesc":"Learn how critical paths help you optimize project schedules, allocate resources effectively, minimize delays, and implement successful projects.","monday_item_id":18059572194,"monday_board_id":0,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[13904],"tags":[13994],"class_list":["post-19586","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","tag-project-schedule-management"],"acf":{"lobby_image":false,"post_thumbnail_title":"","hide_post_info":false,"hide_bottom_cta":true,"hide_from_blog":false,"cluster":"","banner_url":"https:\/\/auth.monday.com\/users\/sign_up_new#soft_signup_from_step","main_text_banner":"Try monday.com","sub_title_banner":"Find all critical activities in your workflow","sub_title_banner_second":"","banner_button_text":"","below_banner_line":"","display_dates":"updated","use_customized_cta":true,"display_subscribe_widget":true,"custom_schema_code":"","post_date":"20240701","landing_page_layout":false,"featured_image_link":"","cta_button":{"title":"Sign up for high quality content","url":"https:\/\/forms.monday.com\/forms\/3ce1811bf93765f24eaf8a119ac6436f?r=use1","target":""},"sidebar_color_banner":"","custom_tags":[13994],"faqs":[{"faq_title":"Critical path FAQs","faq_shortcode":"critical-path","faq":[{"question":"Why is the critical path important in project management?","answer":"<p>The critical path is important in project management because it helps estimate the project duration accurately, identify critical activities that must be completed on time, and highlight task dependencies, resource constraints, and potential risks.\u00a0<\/p>\n"},{"question":"What are non-critical activities?","answer":"<p>Non-critical activities are tasks that can be delayed beyond their allotted deadline without affecting the project's overall duration. These activities have slack time and are not part of the critical path.<\/p>\n"},{"question":"Can a project have multiple critical paths?","answer":"<p>Yes, a project can have multiple critical paths. In complex projects, you can have multiple sequences of activities that are equally critical and must be completed on time for the project to run on schedule.<\/p>\n"}]}],"activate_cta_banner":false,"sections":[{"acf_fc_layout":"content_1","blocks":[{"main_heading":"","content_block":[{"acf_fc_layout":"text","content":"<p class=\"p1\">A critical path is a method used by project managers to prioritize tasks and deliver a project on time. But unlike most <a href=\"https:\/\/monday.com\/blog\/project-management\/guide-to-project-management\/\"><span class=\"s1\">project management<\/span><\/a> concepts, the title of this one doesn\u2019t give much away.<\/p>\n<p class=\"p1\">That\u2019s why we\u2019ve created this no-nonsense guide to help you understand what critical paths are, why they\u2019re important, and how to implement them. Plus, we\u2019ll show you how the critical path feature in monday work management can make your job easier.<\/p>\n<p style=\"text-align: left;\"><strong><a class=\"cta-button blue-button\" aria-label=\"Get started\" href=\"https:\/\/auth.monday.com\/users\/sign_up_new\" target=\"_blank\">Get started<\/a><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><iframe loading=\"lazy\" title=\"Critical Path Ultimate Guide - What is Critical Path in Project Management + What Are The Benefits?\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/VAkM8ti6KAw?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n"}]},{"main_heading":"What is a critical path?","content_block":[{"acf_fc_layout":"text","content":"<p class=\"p1\">A <b>critical path<\/b> is the longest sequence of dependent tasks that must be completed to execute a project. The tasks are called critical activities because the whole project runs over if they\u2019re delayed.<\/p>\n<p class=\"p1\">For example, if you&#8217;re building a house, the critical path might include activities like digging the foundations, building the walls, and installing the roof. If any of these critical activities fall behind schedule the whole project gets delayed.<\/p>\n<p class=\"p1\">Project managers use the <b>critical path method (CPM)<\/b> to find the critical path. The CPM \u2014 also known as <b>critical path analysis (CPA)<\/b> \u2014 is a project management technique used to plan and schedule complex projects. It\u2019s an algorithm that identifies the longest sequence of dependent activities and measures the time required to complete them from start to finish.<\/p>\n<h3>What does a critical path look like?<\/h3>\n<p class=\"p1\">Asking what a critical path looks like is like asking, \u201chow long is a piece of string?\u201d \u2014 i.e. there\u2019s no definitive answer.<\/p>\n<p class=\"p1\">Traditionally, the critical path was a flow chart. For example, some house-building activities take longer than others, so the critical path highlights the longest duration:<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-135592\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-diagram.png\" alt=\"Simplified critical path flow chart\" width=\"975\" height=\"325\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-diagram.png 975w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-diagram-300x100.png 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-diagram-768x256.png 768w\" sizes=\"(max-width: 975px) 100vw, 975px\" \/><\/p>\n<p class=\"p1\"><a href=\"https:\/\/www.workamajig.com\/blog\/critical-path-method\" target=\"_blank\" rel=\"nofollow noopener\">[Image source]<\/a><\/p>\n<p class=\"p1\">A more complex diagram might look like this:<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-135586\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-graph.jpg\" alt=\"Early example of a critical path flow chart\" width=\"585\" height=\"744\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-graph.jpg 585w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-graph-236x300.jpg 236w\" sizes=\"(max-width: 585px) 100vw, 585px\" \/><\/p>\n<p class=\"p1\"><a href=\"https:\/\/hbr.org\/1963\/09\/the-abcs-of-the-critical-path-method\" target=\"_blank\" rel=\"nofollow noopener\">[Image source]<\/a><\/p>\n<p class=\"p1\">Nowadays, other more visually appealing ways of presenting a critical path exist. For example, using a <span class=\"s1\">Gantt chart<\/span> allows you to visualize the critical activities:<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-135602\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-client-projects-gantt-chart-1024x563.jpg\" alt=\"Using a Gantt chart allows you to visualize the critical activities\" width=\"1024\" height=\"563\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-client-projects-gantt-chart-1024x563.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-client-projects-gantt-chart-300x165.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-client-projects-gantt-chart-768x422.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-client-projects-gantt-chart-1536x844.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-client-projects-gantt-chart.jpg 1820w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<h3 class=\"p1\">Critical path vs. critical chain<\/h3>\n<p class=\"p2\">Critical path and critical chain are two different approaches to completing a project.<\/p>\n<p class=\"p1\">The <a href=\"https:\/\/monday.com\/blog\/project-management\/critical-chain\/\"><strong>critical chain<\/strong><\/a> methodology pinpoints the bottlenecks or limiting factors that can cause businesses to miss project deadlines. It focuses on monitoring the use of resources \u2014 like materials and labor. For example, a project manager might delay the start of one task so that a skilled worker does not have to perform two tasks at the same time.<\/p>\n<p class=\"p2\">The<b> critical path<\/b> focuses on task management, assumes unlimited resources, and identifies the longest track of tasks. It helps identify tasks that may cause project delays and guides project managers to take preventive measures from the start.<\/p>\n<p class=\"p2\">On the other hand,<b> <\/b>the<b> critical chain<\/b> focuses on resource and buffer management, assumes limited resources, and identifies the longest chain of dependent events. It inserts buffers between dependent events to protect the project from delays.<\/p>\n<h3 class=\"p1\">Critical path vs. critical activity<\/h3>\n<p class=\"p2\">Critical path and critical activity are related concepts in <a href=\"https:\/\/monday.com\/blog\/project-management\/guide-to-project-management\/\">project management<\/a>, both determined by the critical path method (CPM).<\/p>\n<p class=\"p2\">The <b>critical path<\/b> is the longest sequence of tasks that must be completed for the project and comprises critical activities. Any delay in completing tasks on the critical path will also delay the project.<\/p>\n<p class=\"p2\">A <b>critical activity<\/b> is a specific scheduled activity that is part of the critical path. It\u2019s essential to the project\u2019s timeline, and any delay in completing a critical activity will delay the entire project.<\/p>\n<p class=\"p2\">For example, if it takes twice as long to dig the foundations for a new house, then the entire house building project gets delayed. A critical activity typically has zero float, meaning there\u2019s no flexibility in the start or finish dates.<\/p>\n<h3 class=\"p1\">Critical path vs. PERT<\/h3>\n<p class=\"p2\">The critical path and PERT (Program Evaluation and Review Technique) are tools for planning and controlling projects.<\/p>\n<p class=\"p1\"><a href=\"https:\/\/monday.com\/blog\/project-management\/pert\/\"><strong>PERT<\/strong><\/a> is a framework to map out task dependencies and estimate how long a project will last. It\u2019s a statistical tool to visualize the overall project schedule \u2014 not just the critical path \u2014 and shows the relationship between tasks as well as the overall project duration.<\/p>\n<p class=\"p1\">For example, a project with seven key activities and a total project duration of 14 days, could have a chart that looks like this:<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-83535\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/10\/project-management-techniques-PERT-chart.png\" alt=\"project management techniques\" width=\"787\" height=\"396\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/10\/project-management-techniques-PERT-chart.png 787w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/10\/project-management-techniques-PERT-chart-300x151.png 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/10\/project-management-techniques-PERT-chart-768x386.png 768w\" sizes=\"(max-width: 787px) 100vw, 787px\" \/><\/p>\n<p class=\"p2\">The <b>critical path<\/b> is used to schedule and manage project tasks, focusing on the longest sequence of tasks and considering task dependencies and slack time. It is suitable for projects with predictable task durations.<\/p>\n<p class=\"p2\">On the other hand, <b>PERT<\/b> is used to calculate the time required to complete project activities, especially when task durations are variable and uncertain. It allows for flexibility in <a href=\"https:\/\/monday.com\/blog\/project-management\/project-scheduling-101\/\">project scheduling<\/a> and focuses on time estimation and uncertainty.<\/p>\n<h3 class=\"p1\">Critical path vs. Gantt chart<\/h3>\n<p class=\"p2\">The critical path and <a href=\"https:\/\/monday.com\/blog\/project-management\/everything-you-want-to-know-about-gantt-charts\" target=\"_blank\" rel=\"noopener\"><span class=\"s1\">Gantt chart<\/span><\/a> are both project management visualization tools, but they serve different purposes.<\/p>\n<p class=\"p2\">The <b>critical path<\/b> helps schedule and manage project tasks, taking into account task dependencies and slack time. It\u2019s suitable for projects with predictable task durations.<\/p>\n<p class=\"p2\">On the other hand, a <b>Gantt chart<\/b> provides a visual overview of tasks, durations, and dependencies in a project schedule. It helps track progress, allocate resources, and communicate project timelines.<\/p>\n<p class=\"p2\">While a Gantt chart can highlight the critical path, its primary purpose is to visualize the project schedule.<\/p>\n"}]},{"main_heading":"What are the benefits of the critical path method?","content_block":[{"acf_fc_layout":"text","content":"<p class=\"p2\">The critical path method (CPM) offers improved project planning, enhanced scheduling, clearer communication, effective resource management, tighter cost control, risk detection, and better project management.<\/p>\n<h3>1. Enhances project planning<\/h3>\n<p class=\"p2\">The CPM provides a structured approach to project planning by identifying the sequence of activities and their dependencies. This helps project managers create a realistic and robust <a href=\"https:\/\/monday.com\/blog\/project-management\/project-schedule\/\">project schedule<\/a>.<\/p>\n<h3 class=\"p1\">2. Helps prioritize tasks<\/h3>\n<p class=\"p2\">The CPM identifies the critical tasks and determines the critical path. This helps project managers prioritize tasks effectively and determine where and how to allocate resources.<\/p>\n<h3 class=\"p1\">3. Improves team communication<\/h3>\n<p class=\"p2\">The CPM requires input from key stakeholders, including team members and subcontractors. This collaboration ensures everyone understands the <a href=\"https:\/\/monday.com\/blog\/project-management\/project-timeline\/\">project timeline<\/a> and dependencies, leading to better communication and coordination.<\/p>\n<h3 class=\"p1\">4. Facilitates more effective resource management<\/h3>\n<p class=\"p2\">The CPM helps project managers identify resource requirements for each activity. Project managers can allocate resources efficiently by understanding the critical path and resource dependencies, minimizing bottlenecks and unexpected delays.<\/p>\n<h3 class=\"p1\">5. Tightens cost control<\/h3>\n<p class=\"p2\">The CPM assists project managers in controlling costs by allocating the right resources to the right places. This reduces the chances of unexpected delays that may incur additional costs.<\/p>\n<h3 class=\"p1\">6. Detects potential risks<\/h3>\n<p class=\"p2\">The CPM allows project managers to identify potential risks and their impact on the project schedule. By analyzing the critical path and considering the float or slack time, project managers can predict the effects of delays and make adjustments to mitigate risks.<\/p>\n<h3 class=\"p1\">7. Improves project management<\/h3>\n<p class=\"p2\">The CPM enables project managers to clearly communicate project plans, schedules, and performance. This clarity helps them monitor progress, identify issues, and make informed decisions to solve <a href=\"https:\/\/monday.com\/blog\/project-management\/project-management-challenges\/\">project management challenges<\/a>.<\/p>\n<p class=\"p2\"><strong>To summarize:<\/strong> by utilizing the CPM, project managers can optimize project timelines, allocate resources effectively, and mitigate risks, leading to successful projects.<\/p>\n"}]},{"main_heading":"How to find the critical path","content_block":[{"acf_fc_layout":"text","content":"<p class=\"p1\">Now, let\u2019s identify the critical path from start to finish.<\/p>\n<h3 class=\"p1\">1. List all your project tasks<\/h3>\n<p class=\"p1\">Before you even think about a critical path, you need to list what tasks to include in the project \u2014 i.e. your <a href=\"https:\/\/monday.com\/blog\/project-management\/your-quick-start-guide-to-work-breakdown-structure\/\" target=\"_blank\" rel=\"noopener\"><span class=\"s1\">work breakdown structure<\/span><\/a>.<\/p>\n<p class=\"p1\">Spend some time speaking with stakeholders to confirm the project details. Once you have all the information, you can identify all the activities that must happen to complete the project.<\/p>\n<h3>2. Put all the tasks in order<\/h3>\n<p class=\"p1\">Once you\u2019ve identified the tasks, it\u2019s time to put them in chronological order and <a href=\"https:\/\/monday.com\/blog\/project-management\/task-dependencies\/\">identify any task dependencies<\/a>. This will help you work out the project timeline.<\/p>\n<p class=\"p1\"><i>So what\u2019s the best way to put them in order?<\/i><\/p>\n<p class=\"p1\">Whether you\u2019d prefer to create a project roadmap, tracker, or overview, using an efficient, easy-to-use work management software \u2014 like <a href=\"https:\/\/monday.com\/work-management\" target=\"_blank\" rel=\"noopener\"><span class=\"s1\">monday work management<\/span><\/a> \u2014 simplifies the process by giving you a clear visualization of all your tasks:<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-135608\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-management-overview-1024x563.jpg\" alt=\"Work management software \u2014 like monday work management \u2014 simplifies the project planning process.\" width=\"1024\" height=\"563\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-management-overview-1024x563.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-management-overview-300x165.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-management-overview-768x422.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-management-overview-1536x844.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-project-management-overview.jpg 1820w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><strong><a class=\"cta-button blue-button\" aria-label=\"Get started\" href=\"https:\/\/auth.monday.com\/users\/sign_up_new\" target=\"_blank\">Get started<\/a><\/strong><\/p>\n<h3>3. Estimate how long each task will take<\/h3>\n<p class=\"p1\">There are several ways to estimate activity duration. To save you from sifting through all the methods out there, we\u2019ve outlined our top three:<\/p>\n<ul>\n<li><strong>Bottom-up estimating<\/strong>: Add up the estimates of the lowest-level work tasks to arrive at your summary total. Bottom-up estimates take more time to complete, but they also are more accurate than other estimates.<\/li>\n<li><strong>Comparative estimating<\/strong>: Base your estimates on similar work or projects completed in the past. If you used time tracking in previous tasks, you\u2019ll see precisely how long they took.<\/li>\n<li><strong>Parametric estimating<\/strong>: Calculate a portion of the work and then multiply to get the overall estimate \u2014 e.g. if you believe one ad takes 2 hours and you have five ads to do, it should take 10 hours in total.<\/li>\n<\/ul>\n<p>Read also: <a href=\"https:\/\/monday.com\/blog\/project-management\/bottom-up-vs-top-down-project-management\/\">Bottom-up vs. top-down<\/a><\/p>\n<h3>4. Find all the potential &#8216;paths&#8217; or &#8216;strings&#8217;<\/h3>\n<p class=\"p1\">Any project can have multiple paths or strings of connected and dependent tasks.<\/p>\n<p class=\"p1\">This part of the process involves finding all these possible paths and calculating how long each one will take so that you can pinpoint the one with the longest duration.<\/p>\n<p class=\"p1\">By hand, this can be a headache with a high chance of error, which is not ideal. Fortunately, project management platforms, like monday work management, can do this automatically.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-135621\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-monday-work-management-gantt-chart-1024x576.jpg\" alt=\"monday work management can find all the possible critical paths and calculate how long each one will take so that you can pinpoint the one with the longest duration.\" width=\"1024\" height=\"576\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-monday-work-management-gantt-chart-1024x576.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-monday-work-management-gantt-chart-300x169.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-monday-work-management-gantt-chart-768x432.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-monday-work-management-gantt-chart-1536x864.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path-monday-work-management-gantt-chart-2048x1152.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p class=\"p1\"><strong><a class=\"cta-button blue-button\" aria-label=\"Get started\" href=\"https:\/\/auth.monday.com\/users\/sign_up_new\" target=\"_blank\">Get started<\/a><\/strong><\/p>\n<h3>5. Identify the critical path<\/h3>\n<p class=\"p1\">Now for the main event \u2014 it\u2019s time to find the critical path.<\/p>\n<p class=\"p1\">Once you \u2014 or your work management software \u2014 have listed all the paths and strings, you need to identify the longest path through the project from start to finish.<\/p>\n<p class=\"p1\">So, if you\u2019ve got a string of tasks that takes eight days, one that takes six days, and another that takes 12, then the 12-day string is the critical path. It\u2019s the one that can\u2019t have any delays without moving out your project end date.<\/p>\n<h3>6. Monitor the critical path<\/h3>\n<p class=\"p1\">The critical path can, and most likely will, change throughout the project. Some tasks may take longer than expected, or new tasks get added over time.<\/p>\n<p class=\"p1\">Any changes to the project can have a knock-on effect on the critical path. This means you\u2019ll need to check continuously throughout the project and update your critical path diagram accordingly.<\/p>\n<p class=\"p1\"><i>We know it\u2019s not ideal. <\/i>One of the limitations of using the critical path project management method is its lack of flexibility. That\u2019s why we created a critical path feature in monday work management that accounts for more flexibility.<\/p>\n"}]},{"main_heading":"Manage your critical paths with monday work management","content_block":[{"acf_fc_layout":"text","content":"<p class=\"p1\">The <a href=\"https:\/\/monday.com\/work-management\" target=\"_blank\" rel=\"noopener\"><span class=\"s1\">monday work management<\/span><\/a> critical path feature makes your team more aware and efficient by visually displaying each project\u2019s duration.<\/p>\n<p class=\"p1\">Once you add this feature to your Gantt Chart, it highlights the critical path in your project\u2019s timeline \u2014 the events that must be completed on time for the overall project to finish on schedule.<\/p>\n<p class=\"p1\">Moreover, the software monitors any changes in critical path activity and automatically updates the current critical path in your <a href=\"https:\/\/monday.com\/blog\/project-management\/how-to-write-a-killer-project-plan-in-6-simple-steps\/\">project plan<\/a>, so you don\u2019t have to.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter wp-image-92121 size-full\" title=\"Critical path activity\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2020\/10\/cp.gif\" alt=\"\" width=\"1361\" height=\"703\" \/><\/p>\n<p><strong><a class=\"cta-button blue-button\" aria-label=\"Get started\" href=\"https:\/\/auth.monday.com\/users\/sign_up_new\" target=\"_blank\">Get started<\/a><\/strong><\/p>\n"}]},{"main_heading":"Start identifying critical paths today","content_block":[{"acf_fc_layout":"text","content":"<p class=\"p1\">So there you have it \u2014 a simple, no-nonsense guide to critical paths, including their definition, benefits, and how to identify them in your projects.<\/p>\n<p class=\"p1\">Now you know what\u2019s what, why not check out some <a href=\"https:\/\/monday.com\/blog\/project-management\/the-complete-project-management-software-list\/\" target=\"_blank\" rel=\"noopener\"><span class=\"s1\">project management software<\/span><\/a> that enables you to implement critical paths within your projects?<\/p>\n<div class=\"accordion faq\" id=\"faq-critical-path\">\n  <h2 class=\"accordion__heading section-title text-left\">Critical path FAQs<\/h2>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-critical-path\" href=\"#q-critical-path-1\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">Why is the critical path important in project management?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q-critical-path-1\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-critical-path\">\n      <p>The critical path is important in project management because it helps estimate the project duration accurately, identify critical activities that must be completed on time, and highlight task dependencies, resource constraints, and potential risks.\u00a0<\/p>\n    <\/div>\n  <\/div>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-critical-path\" href=\"#q-critical-path-2\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">What are non-critical activities?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q-critical-path-2\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-critical-path\">\n      <p>Non-critical activities are tasks that can be delayed beyond their allotted deadline without affecting the project's overall duration. These activities have slack time and are not part of the critical path.<\/p>\n    <\/div>\n  <\/div>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-critical-path\" href=\"#q-critical-path-3\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">Can a project have multiple critical paths?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q-critical-path-3\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-critical-path\">\n      <p>Yes, a project can have multiple critical paths. In complex projects, you can have multiple sequences of activities that are equally critical and must be completed on time for the project to run on schedule.<\/p>\n    <\/div>\n  <\/div>\n  <script type='application\/ld+json'>{\n    \"@context\": \"https:\\\/\\\/schema.org\",\n    \"@type\": \"FAQPage\",\n    \"mainEntity\": [\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Why is the critical path important in project management?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>The critical path is important in project management because it helps estimate the project duration accurately, identify critical activities that must be completed on time, and highlight task dependencies, resource constraints, and potential risks.\\u00a0<\\\/p>\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"What are non-critical activities?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>Non-critical activities are tasks that can be delayed beyond their allotted deadline without affecting the project's overall duration. These activities have slack time and are not part of the critical path.<\\\/p>\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Can a project have multiple critical paths?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>Yes, a project can have multiple critical paths. In complex projects, you can have multiple sequences of activities that are equally critical and must be completed on time for the project to run on schedule.<\\\/p>\\n\"\n            }\n        }\n    ]\n}<\/script><\/div>\n\n"}]}]}],"hide_time_to_read":false,"cornerstone_hero_cta_override":{"label":"","url":""},"disclaimer":"","parse_from_google_doc":false,"show_contact_sales_button":"0","custom_header_banner":false,"show_sidebar_sticky_banner":false},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.6 (Yoast SEO v26.6) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How to Use the Critical Path Method (CPM) in Project Management<\/title>\n<meta name=\"description\" content=\"Learn how critical paths help you optimize project schedules, allocate resources effectively, minimize delays, and implement successful projects.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Use the Critical Path Method (CPM) in Project Management [2024]\" \/>\n<meta property=\"og:description\" content=\"Learn how critical paths help you optimize project schedules, allocate resources effectively, minimize delays, and implement successful projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/\" \/>\n<meta property=\"og:site_name\" content=\"monday.com Blog\" \/>\n<meta property=\"article:published_time\" content=\"2020-10-01T23:22:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-09T10:45:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1801\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"David Hartshorne\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"David Hartshorne\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/\"},\"author\":{\"name\":\"David Hartshorne\",\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/person\/4cf4e679301900c5395f6f33cbc6d7c9\"},\"headline\":\"How to Use the Critical Path Method (CPM) in Project Management [2024]\",\"datePublished\":\"2020-10-01T23:22:26+00:00\",\"dateModified\":\"2025-11-09T10:45:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/\"},\"wordCount\":1924,\"publisher\":{\"@id\":\"https:\/\/monday.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path.jpg\",\"keywords\":[\"Project schedule management\"],\"articleSection\":[\"Project management\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/\",\"url\":\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/\",\"name\":\"How to Use the Critical Path Method (CPM) in Project Management\",\"isPartOf\":{\"@id\":\"https:\/\/monday.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path.jpg\",\"datePublished\":\"2020-10-01T23:22:26+00:00\",\"dateModified\":\"2025-11-09T10:45:41+00:00\",\"description\":\"Learn how critical paths help you optimize project schedules, allocate resources effectively, minimize delays, and implement successful projects.\",\"breadcrumb\":{\"@id\":\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#primaryimage\",\"url\":\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path.jpg\",\"contentUrl\":\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path.jpg\",\"width\":1801,\"height\":900,\"caption\":\"How to Use the Critical Path Method CPM in Project Management 2024\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/monday.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project management\",\"item\":\"https:\/\/monday.com\/blog\/project-management\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"How to Use the Critical Path Method (CPM) in Project Management [2024]\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/monday.com\/blog\/#website\",\"url\":\"https:\/\/monday.com\/blog\/\",\"name\":\"monday.com Blog\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/monday.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/monday.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/monday.com\/blog\/#organization\",\"name\":\"monday.com Blog\",\"url\":\"https:\/\/monday.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/res.cloudinary.com\/monday-blogs\/fl_lossy,f_auto,q_auto\/wp-blog\/2020\/12\/monday.com-logo-1.png\",\"contentUrl\":\"https:\/\/res.cloudinary.com\/monday-blogs\/fl_lossy,f_auto,q_auto\/wp-blog\/2020\/12\/monday.com-logo-1.png\",\"width\":200,\"height\":200,\"caption\":\"monday.com Blog\"},\"image\":{\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/person\/4cf4e679301900c5395f6f33cbc6d7c9\",\"name\":\"David Hartshorne\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ed456025e4e33ef078189c6c433af6cdb6ebb40d534d44f96d8393ab15fe0f34?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ed456025e4e33ef078189c6c433af6cdb6ebb40d534d44f96d8393ab15fe0f34?s=96&d=mm&r=g\",\"caption\":\"David Hartshorne\"},\"description\":\"David Hartshorne is an experienced writer and the owner of Azahar Media. A former global support and service delivery manager for enterprise software, he uses his subject-matter expertise to create authoritative, detailed, and actionable content for leading brands like Zapier and monday.com.\",\"sameAs\":[\"https:\/\/azaharmedia.co.uk\",\"https:\/\/www.linkedin.com\/in\/dhartshorne\/\"],\"jobTitle\":\"B2B SaaS content marketing writer\",\"url\":\"https:\/\/monday.com\/blog\/author\/davidhartshorne\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"How to Use the Critical Path Method (CPM) in Project Management","description":"Learn how critical paths help you optimize project schedules, allocate resources effectively, minimize delays, and implement successful projects.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/","og_locale":"en_US","og_type":"article","og_title":"How to Use the Critical Path Method (CPM) in Project Management [2024]","og_description":"Learn how critical paths help you optimize project schedules, allocate resources effectively, minimize delays, and implement successful projects.","og_url":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/","og_site_name":"monday.com Blog","article_published_time":"2020-10-01T23:22:26+00:00","article_modified_time":"2025-11-09T10:45:41+00:00","og_image":[{"width":1801,"height":900,"url":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path.jpg","type":"image\/jpeg"}],"author":"David Hartshorne","twitter_card":"summary_large_image","twitter_misc":{"Written by":"David Hartshorne","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#article","isPartOf":{"@id":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/"},"author":{"name":"David Hartshorne","@id":"https:\/\/monday.com\/blog\/#\/schema\/person\/4cf4e679301900c5395f6f33cbc6d7c9"},"headline":"How to Use the Critical Path Method (CPM) in Project Management [2024]","datePublished":"2020-10-01T23:22:26+00:00","dateModified":"2025-11-09T10:45:41+00:00","mainEntityOfPage":{"@id":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/"},"wordCount":1924,"publisher":{"@id":"https:\/\/monday.com\/blog\/#organization"},"image":{"@id":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#primaryimage"},"thumbnailUrl":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path.jpg","keywords":["Project schedule management"],"articleSection":["Project management"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/","url":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/","name":"How to Use the Critical Path Method (CPM) in Project Management","isPartOf":{"@id":"https:\/\/monday.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#primaryimage"},"image":{"@id":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#primaryimage"},"thumbnailUrl":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path.jpg","datePublished":"2020-10-01T23:22:26+00:00","dateModified":"2025-11-09T10:45:41+00:00","description":"Learn how critical paths help you optimize project schedules, allocate resources effectively, minimize delays, and implement successful projects.","breadcrumb":{"@id":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/monday.com\/blog\/project-management\/critical-paths\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#primaryimage","url":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path.jpg","contentUrl":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/08\/critical-path.jpg","width":1801,"height":900,"caption":"How to Use the Critical Path Method CPM in Project Management 2024"},{"@type":"BreadcrumbList","@id":"https:\/\/monday.com\/blog\/project-management\/critical-paths\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/monday.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Project management","item":"https:\/\/monday.com\/blog\/project-management\/"},{"@type":"ListItem","position":3,"name":"How to Use the Critical Path Method (CPM) in Project Management [2024]"}]},{"@type":"WebSite","@id":"https:\/\/monday.com\/blog\/#website","url":"https:\/\/monday.com\/blog\/","name":"monday.com Blog","description":"","publisher":{"@id":"https:\/\/monday.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/monday.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/monday.com\/blog\/#organization","name":"monday.com Blog","url":"https:\/\/monday.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/monday.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/res.cloudinary.com\/monday-blogs\/fl_lossy,f_auto,q_auto\/wp-blog\/2020\/12\/monday.com-logo-1.png","contentUrl":"https:\/\/res.cloudinary.com\/monday-blogs\/fl_lossy,f_auto,q_auto\/wp-blog\/2020\/12\/monday.com-logo-1.png","width":200,"height":200,"caption":"monday.com Blog"},"image":{"@id":"https:\/\/monday.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/monday.com\/blog\/#\/schema\/person\/4cf4e679301900c5395f6f33cbc6d7c9","name":"David Hartshorne","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/monday.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/ed456025e4e33ef078189c6c433af6cdb6ebb40d534d44f96d8393ab15fe0f34?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ed456025e4e33ef078189c6c433af6cdb6ebb40d534d44f96d8393ab15fe0f34?s=96&d=mm&r=g","caption":"David Hartshorne"},"description":"David Hartshorne is an experienced writer and the owner of Azahar Media. A former global support and service delivery manager for enterprise software, he uses his subject-matter expertise to create authoritative, detailed, and actionable content for leading brands like Zapier and monday.com.","sameAs":["https:\/\/azaharmedia.co.uk","https:\/\/www.linkedin.com\/in\/dhartshorne\/"],"jobTitle":"B2B SaaS content marketing writer","url":"https:\/\/monday.com\/blog\/author\/davidhartshorne\/"}]}},"auth_debug":{"user_exists":false,"user_id":0,"user_login":null,"roles":[],"authenticated":false,"get_current_user_id":0},"_links":{"self":[{"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/posts\/19586","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/users\/213"}],"replies":[{"embeddable":true,"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/comments?post=19586"}],"version-history":[{"count":41,"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/posts\/19586\/revisions"}],"predecessor-version":[{"id":260879,"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/posts\/19586\/revisions\/260879"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/media\/135580"}],"wp:attachment":[{"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/media?parent=19586"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/categories?post=19586"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/monday.com\/blog\/wp-json\/wp\/v2\/tags?post=19586"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}