{"id":223764,"date":"2025-03-31T19:39:51","date_gmt":"2025-03-31T19:39:51","guid":{"rendered":"https:\/\/monday.com\/blog\/?p=223764"},"modified":"2025-11-28T09:20:27","modified_gmt":"2025-11-28T14:20:27","slug":"pi-planning","status":"publish","type":"post","link":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/","title":{"rendered":"PI planning : le guide ultime de la planification de l&rsquo;incr\u00e9ment de programme"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"","protected":false},"author":248,"featured_media":223767,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"pages\/cornerstone-primary.php","format":"standard","meta":{"_acf_changed":false,"_yoast_wpseo_title":"PI Planning, c\u2019est quoi ? D\u00e9finition de cet \u00e9v\u00e8nement SAFe Agile","_yoast_wpseo_metadesc":"Pourquoi faire une planification de l'incr\u00e9ment de programme SAFe, qui y participe, son agenda et comment organiser un PI planning Agile.","monday_item_id":11239130965,"monday_board_id":0,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[13953],"tags":[],"class_list":["post-223764","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-dev"],"acf":{"featured_image_link":"","lobby_image":false,"post_thumbnail_title":"","hide_post_info":false,"hide_bottom_cta":false,"hide_from_blog":false,"landing_page_layout":false,"hide_time_to_read":false,"sidebar_color_banner":"","custom_tags":false,"disclaimer":"","cornerstone_hero_cta_override":{"label":"","url":""},"cluster":"","display_dates":"default","faqs":[{"faq_title":"FAQ ","faq_shortcode":"","faq":[{"question":"Qu'est-ce que le PI planning dans SAFe ?","answer":"<p>Le PI planning dans SAFe est un \u00e9v\u00e9nement crucial de deux jours qui a lieu toutes les huit \u00e0 douze semaines et qui rassemble plusieurs \u00e9quipes, parties prenantes et dirigeants afin d'aligner les objectifs et de cr\u00e9er un plan commun pour l'Incr\u00e9ment de Programme (PI) \u00e0 venir. Au cours de la planification du PI, les \u00e9quipes collaborent pour d\u00e9velopper des objectifs communs, identifier les d\u00e9pendances et les risques du projet et s'engager \u00e0 fournir de la valeur au cours des huit \u00e0 douze semaines suivantes, en veillant \u00e0 l'alignement sur la vision et la strat\u00e9gie de l'organisation.<\/p>\n"},{"question":"Qu'est-ce que le PI planning dans Scrum ?","answer":"<p>Le PI planning peut \u00eatre adapt\u00e9 \u00e0 Scrum, m\u00eame s'il ne s'agit pas d'une pratique standard de Scrum. Dans un contexte Scrum, plusieurs \u00e9quipes Scrum pourraient se r\u00e9unir toutes les huit \u00e0 dix semaines pour s'aligner sur les objectifs, discuter des fonctionnalit\u00e9s \u00e0 venir et coordonner leur travail entre les \u00e9quipes. Cette version adapt\u00e9e du PI planning permet aux \u00e9quipes Scrum de conserver leur approche bas\u00e9e sur les sprints Scrum tout en b\u00e9n\u00e9ficiant de l'alignement et de la coordination qu'offre le PI planning.<\/p>\n"},{"question":"Quelle est la diff\u00e9rence entre PI planning et planification du sprint ?","answer":"<p>Le PI planning est un \u00e9v\u00e9nement strat\u00e9gique qui a lieu toutes les huit \u00e0 douze semaines et implique plusieurs \u00e9quipes qui s'alignent sur les objectifs et les plans pour l'ensemble d'un Incr\u00e9ment de Programme (PI).<br \/>\nEn revanche, la planification de sprint est un \u00e9v\u00e9nement tactique qui a lieu au d\u00e9but de chaque sprint de une \u00e0 quatre semaines et qui se concentre sur le plan de projet d\u00e9taill\u00e9 d'une seule \u00e9quipe pour ce sprint.<br \/>\nAinsi, alors que le PI planning d\u00e9finit la vision et les objectifs g\u00e9n\u00e9raux de l'IP, la planification du sprint d\u00e9compose ces objectifs en t\u00e2ches sp\u00e9cifiques et en user stories pour une ex\u00e9cution imm\u00e9diate.<\/p>\n"},{"question":"Quelle est la diff\u00e9rence entre PI planning et Big Room Planning (BRP) ?","answer":"<p>En fait, le PI planning et le Big Room Planning sont le m\u00eame \u00e9v\u00e9nement, le Big Room Planning \u00e9tant un nom alternatif pour la planification de l'IP. Les deux font donc r\u00e9f\u00e9rence \u00e0 un \u00e9v\u00e9nement de planification \u00e0 grande \u00e9chelle impliquant plusieurs \u00e9quipes et se d\u00e9roulant g\u00e9n\u00e9ralement toutes les huit \u00e0 douze semaines. Les termes sont souvent utilis\u00e9s de mani\u00e8re interchangeable, le \u00ab Big Room Planning \u00bb mettant l'accent sur l'aspect physique de la r\u00e9union de nombreuses personnes dans une grande salle, tandis que le \u00ab PI Planning \u00bb met l'accent sur son r\u00f4le dans le Scaled Agile Framework (SAFe).<\/p>\n"}]}],"activate_cta_banner":false,"banner_url":"","main_text_banner":"","sub_title_banner":"","sub_title_banner_second":"","banner_button_text":"","below_banner_line":"","use_customized_cta":false,"custom_schema_code":"","parse_from_google_doc":false,"content_doc":"<p>Le PI planning, ou planification de l&rsquo;incr\u00e9ment de programme en fran\u00e7ais, est un \u00e9v\u00e9nement Agile \u00e0 grande \u00e9chelle r\u00e9current pour aligner toutes les \u00e9quipes d\u2019un Agile Release Train (ART) sur une mission et une vision unique. C&rsquo;est donc un \u00e9l\u00e9ment crucial du Scaled Agile Framework (SAFe) que les organisations doivent imp\u00e9rativement conna\u00eetre si elles veulent ma\u00eetriser avec brio leur d\u00e9veloppement produit Agile.<\/p>\n<p>Dans ce guide, apr\u00e8s une courte d\u00e9finition de PI planning, vous apprendrez pourquoi faire une planification de l&rsquo;incr\u00e9ment de programme, qui est impliqu\u00e9 dans cet \u00e9v\u00e9nement SAFe, ce que couvre l&rsquo;ordre du jour et son agenda. Enfin, nous vous montrerons comment rationaliser votre PI planning en r\u00e9unissant efficacement plusieurs \u00e9quipes avec monday dev.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h2><span style=\"font-weight: 400;\">Le PI planning, c\u2019est quoi : d\u00e9finition<\/span><\/h2>\n<p>Le PI Planning, pour <i>Program Increment Planning<\/i> en anglais, se traduit par <i>planification de l&rsquo;incr\u00e9ment de programme<\/i> en fran\u00e7ais. Parfois aussi appel\u00e9 B<i>ig Room Planning<\/i>, c&rsquo;est l\u2019un des \u00e9v\u00e9nements les plus importants du <i>Scaled Agile Framework<\/i> (SAFe). En effet, lors du PI planning, plusieurs \u00e9quipes du m\u00eame <i>Agile Release Train<\/i> (ART) se rencontrent pour s&rsquo;aligner sur les m\u00eames objectifs et planifier le travail \u00e0 r\u00e9aliser pour l&rsquo;incr\u00e9ment de programme (IP) \u00e0 venir.<\/p>\n<p>De mani\u00e8re g\u00e9n\u00e9rale, on organise un \u00e9v\u00e9nement de PI planning toutes les huit \u00e0 douze semaines et il dure deux jours. Pendant ces deux journ\u00e9es, toutes les \u00e9quipes impliqu\u00e9es d\u00e9finissent ensemble une vision commune, planifient les fonctionnalit\u00e9s n\u00e9cessaires, identifient les d\u00e9pendances les plus contraignantes et s&rsquo;engagent sur des objectifs communs pour le prochain incr\u00e9ment de programme \u00e0 produire.<\/p>\n<p>Pour aller plus loin : <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/safe-scrum\/\">SAFe ou Scrum : les principales diff\u00e9rences<\/a>.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h2><span style=\"font-weight: 400;\">Pourquoi faire un PI planning ?<\/span><\/h2>\n<p>La planification de l&rsquo;IP, ou PI planning, est un \u00e9v\u00e9nement tr\u00e8s important car il vise \u00e0 assurer la coh\u00e9rence entre chaque incr\u00e9mentation, \u00e0 favoriser la collaboration entre toutes les parties prenantes, \u00e0 g\u00e9rer les risques potentiels, \u00e0 am\u00e9liorer la visibilit\u00e9 \u00e0 long terme et \u00e0 garantir que les \u00e9quipes travaillent efficacement avec les m\u00eames objectifs g\u00e9n\u00e9raux en t\u00eate. Alors, m\u00eame si une r\u00e9union de PI planning n\u00e9cessite beaucoup de temps et d&rsquo;efforts pour la mettre en \u0153uvre, de nombreuses organisations estiment que, pour une <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/gestion-de-produit-agile\/\">gestion de produit Agile<\/a> \u00e0 grande \u00e9chelle, les avantages l&#8217;emportent sur les co\u00fbts.<\/p>\n<h3><span style=\"font-weight: 400;\">1. Meilleur alignement et visibilit\u00e9<\/span><\/h3>\n<p>La r\u00e9union de PI planning permet d&rsquo;aligner toutes les \u00e9quipes du Agile Release Train (ART) sur les objectifs g\u00e9n\u00e9raux et la vision de l&rsquo;entreprise. C\u2019est un \u00e9v\u00e9nement qui clarifie le travail pr\u00e9vu pour l&rsquo;incr\u00e9ment de programme \u00e0 venir et permet \u00e0 chacun de toujours travailler sur les \u00e9l\u00e9ments les plus urgents.<\/p>\n<h3><span style=\"font-weight: 400;\">2. Meilleure collaboration et coordination<\/span><\/h3>\n<p>La r\u00e9union de PI planning rassemble toutes les parties prenantes pour discuter et coordonner les d\u00e9pendances entre t\u00e2ches. Elle favorise la collaboration entre les \u00e9quipes et permet des discussions et des prises de d\u00e9cision efficaces et en temps r\u00e9el.<\/p>\n<h3><span style=\"font-weight: 400;\">3. Meilleure gestion des risques<\/span><\/h3>\n<p>Le PI planning permet d&rsquo;identifier rapidement les risques et les probl\u00e8mes potentiels. Il permet d&rsquo;\u00e9laborer de mani\u00e8re proactive des plans d&rsquo;att\u00e9nuation des risques et r\u00e9duit les probabilit\u00e9s de mauvaises surprises lors de l&rsquo;ex\u00e9cution.<\/p>\n<h3><span style=\"font-weight: 400;\">4. Meilleure planification et pr\u00e9visibilit\u00e9<\/span><\/h3>\n<p>L&rsquo;\u00e9v\u00e9nement de PI planning permet une planification et une estimation du travail \u00e0 effectuer plus pr\u00e9cises. Il augmente la fiabilit\u00e9 des livraisons et donne confiance aux parties prenantes dans les engagements de l&rsquo;\u00e9quipe.<\/p>\n<h3><span style=\"font-weight: 400;\">5. Meilleure utilisation des ressources<\/span><\/h3>\n<p>Le PI planning permet de r\u00e9partir plus efficacement les capacit\u00e9s et les comp\u00e9tences de chacun. Il permet d&rsquo;adapter la demande aux capacit\u00e9s r\u00e9elles des \u00e9quipes et d&rsquo;\u00e9liminer les travaux en cours (WIP) inutiles.<\/p>\n<h3><span style=\"font-weight: 400;\">6. Meilleure motivation et clart\u00e9<\/span><\/h3>\n<p>Le PI planning permet de comprendre la situation dans son ensemble tout comme le r\u00f4le de chacun dans le projet. Il donne une compr\u00e9hension commune des objectifs et des priorit\u00e9s du projet et accro\u00eet la motivation de l&rsquo;\u00e9quipe.<\/p>\n<h3><span style=\"font-weight: 400;\">7. Meilleur r\u00e9seautage<\/span><\/h3>\n<p>Le PI planning rassemble les membres de l&rsquo;\u00e9quipe et les parties prenantes pour une communication en face \u00e0 face. Il renforce les relations et la confiance entre les \u00e9quipes et r\u00e9unit les principales parties prenantes pour qu&rsquo;elles prennent les meilleures d\u00e9cisions possibles.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h2><span style=\"font-weight: 400;\">\u00c0 quelle fr\u00e9quence organiser un PI planning<\/span><\/h2>\n<p>On organise g\u00e9n\u00e9ralement un PI planning toutes les 8 \u00e0 12 semaines. Mais, on peut toujours adapter son calendrier selon ses propres besoins. Par exemple, certaines organisations pr\u00e9f\u00e8rent faire un PI planning toutes les huit semaines pour plus d&rsquo;agilit\u00e9, tandis que d&rsquo;autres pr\u00e9f\u00e8rent attendre douze semaines entre chaque PI planning pour correspondre aux trimestres administratifs. Ainsi, de mani\u00e8re g\u00e9n\u00e9rale, si on consid\u00e8re qu\u2019un sprint dure deux semaines, un incr\u00e9ment de programme (IP) dure de quatre \u00e0 six sprints, ce qui donne un rythme coh\u00e9rent pour la planification de l\u2019IP et l&rsquo;alignement g\u00e9n\u00e9ral.<\/p>\n<p>Mais, quelle que soit la fr\u00e9quence choisie, le PI planning doit suivre un calendrier r\u00e9gulier et pr\u00e9visible. En effet, il s&rsquo;agit d&rsquo;un \u00e9v\u00e9nement fixe, encadr\u00e9 dans le temps et qui dure g\u00e9n\u00e9ralement deux jours. Seule cette cadence r\u00e9guli\u00e8re permet de synchroniser, de planifier et d&rsquo;adapter correctement son travail tout au long du Agile Release Train (ART).<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h2><span style=\"font-weight: 400;\">Qui participe au PI planning : r\u00f4les et responsabilit\u00e9s<\/span><\/h2>\n<p>Du fait de sa nature collaborative, le PI planning implique de multiples points de vue diff\u00e9rents. Voici les principaux r\u00f4les et responsabilit\u00e9s d\u2019un \u00e9v\u00e9nement de planification de l&rsquo;incr\u00e9ment de programme.<\/p>\n<p>&nbsp;<\/p>\n<table>\n<tbody>\n<tr>\n<td><b>R\u00f4le<\/b><\/td>\n<td><b>Responsabilit\u00e9s<\/b><\/td>\n<\/tr>\n<tr>\n<td>Release Train Engineer (RTE)<\/td>\n<td>Facilitation des \u00e9v\u00e9nements, alignement, gestion des risques<\/td>\n<\/tr>\n<tr>\n<td>Chef de produit<\/td>\n<td>Communication de la vision, priorisation du processus de travail<\/td>\n<\/tr>\n<tr>\n<td>Propri\u00e9taire de produit<\/td>\n<td>Gestion du backlog, d\u00e9finition des stories<\/td>\n<\/tr>\n<tr>\n<td>Scrum Master<\/td>\n<td>Coaching de l&rsquo;\u00e9quipe, \u00e9limination des obstacles<\/td>\n<\/tr>\n<tr>\n<td>D\u00e9veloppeurs<\/td>\n<td>Planification d\u00e9taill\u00e9e, affinage des stories<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3><span style=\"font-weight: 400;\">Release Train Engineer (RTE)<\/span><\/h3>\n<p>Le Release Train Engineer (RTE) anime l&rsquo;ensemble de l&rsquo;\u00e9v\u00e9nement de planification de l&rsquo;IP. Il aide donc \u00e0 :<\/p>\n<ul>\n<li aria-level=\"1\">g\u00e9rer les risques et les d\u00e9pendances du projet,<\/li>\n<li aria-level=\"1\">cr\u00e9er et suivre les objectifs du programme,<\/li>\n<li aria-level=\"1\">assurer l&rsquo;alignement strat\u00e9gique du processus de planification.<\/li>\n<\/ul>\n<h3><span style=\"font-weight: 400;\">Chef de produit<\/span><\/h3>\n<p>Les chefs de produit pr\u00e9sentent la vision du programme et les \u00e9tapes \u00e0 venir. En outre, ils :<\/p>\n<ul>\n<li aria-level=\"1\">examinent le projet de planification,<\/li>\n<li aria-level=\"1\">g\u00e8rent et hi\u00e9rarchisent les processus de travail,<\/li>\n<li aria-level=\"1\">mettent \u00e0 jour la <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/feuille-de-route-produit\/\">feuille de route du produit<\/a> apr\u00e8s la r\u00e9union de PI planning.<\/li>\n<\/ul>\n<h3><span style=\"font-weight: 400;\">Propri\u00e9taire de produit<\/span><\/h3>\n<p>Les propri\u00e9taires de produit g\u00e8rent le<a href=\"https:\/\/monday.com\/blog\/fr\/dev\/backlog-produit\/\"> backlog produit <\/a>de l&rsquo;\u00e9quipe et en d\u00e9finissent les priorit\u00e9s. Ils sont \u00e9galement charg\u00e9s de :<\/p>\n<ul>\n<li aria-level=\"1\">d\u00e9finir les fonctionnalit\u00e9s et les <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/user-story\/\">user stories<\/a>,<\/li>\n<li aria-level=\"1\">prendre des d\u00e9cisions concernant les user stories d\u00e9finies,<\/li>\n<li aria-level=\"1\">transmettre la vision de l\u2019entreprise.<\/li>\n<\/ul>\n<h3><span style=\"font-weight: 400;\">Scrum Master<\/span><\/h3>\n<p>Les <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/scrum-master\/\">Scrum Masters<\/a> aident les propri\u00e9taires de produit et les d\u00e9veloppeurs en \u00e9liminant tout obstacle qui pourrait g\u00eaner l&rsquo;\u00e9quipe dans son travail. En outre, ils :<\/p>\n<ul>\n<li aria-level=\"1\">s&rsquo;assurent que tout le monde respecte les <a href=\"https:\/\/manifesteagile.fr\/#principes\">principes Agile<\/a>,<\/li>\n<li aria-level=\"1\">contr\u00f4lent la dur\u00e9e de l\u2019\u00e9v\u00e9nement et coachent les \u00e9quipes,<\/li>\n<li aria-level=\"1\">soutiennent les processus de planification de l&rsquo;\u00e9quipe et identifient les d\u00e9pendances.<\/li>\n<\/ul>\n<h3><span style=\"font-weight: 400;\">D\u00e9veloppeurs<\/span><\/h3>\n<p>Les d\u00e9veloppeurs et les <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/tests-agiles\/\">testeurs<\/a> participent aux sessions de groupe pour :<\/p>\n<ul>\n<li aria-level=\"1\">construire et affiner les user stories,<\/li>\n<li aria-level=\"1\">identifier les risques et les d\u00e9pendances,<\/li>\n<li aria-level=\"1\">r\u00e9diger les objectifs de l\u2019incr\u00e9ment de programme (IP) de l&rsquo;\u00e9quipe.<\/li>\n<\/ul>\n<h3><span style=\"font-weight: 400;\">Autres parties prenantes cl\u00e9s<\/span><\/h3>\n<p>En outre, l\u2019\u00e9v\u00e9nement de PI planning peut impliquer :<\/p>\n<ul>\n<li aria-level=\"1\">des architectes syst\u00e8me,<\/li>\n<li aria-level=\"1\">des responsables techniques,<\/li>\n<li aria-level=\"1\">des cadres sup\u00e9rieurs,<\/li>\n<li aria-level=\"1\">les chefs d&rsquo;entreprise,<\/li>\n<li aria-level=\"1\">les clients.<\/li>\n<\/ul>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h2><span style=\"font-weight: 400;\">Quel est l\u2019ordre du jour typique d\u2019un PI planning<\/span><\/h2>\n<p>L&rsquo;ordre du jour d&rsquo;un \u00e9v\u00e9nement de planification de l&rsquo;IP comprend g\u00e9n\u00e9ralement les \u00e9l\u00e9ments suivants :<\/p>\n<ul>\n<li aria-level=\"1\"><b>pr\u00e9sentation du contexte commercial <\/b>: vue d&rsquo;ensemble de l&rsquo;\u00e9tat actuel de l&rsquo;entreprise et des conditions du march\u00e9,<\/li>\n<li aria-level=\"1\"><b>pr\u00e9sentation de la vision du produit<\/b> : d\u00e9tails sur les fonctionnalit\u00e9s \u00e0 venir et les priorit\u00e9s de la gestion des produits,<\/li>\n<li aria-level=\"1\"><b>s\u00e9ances en petits groupes<\/b> : les \u00e9quipes travaillent en petits groupes pour \u00e9laborer des strat\u00e9gies, \u00e9valuer les capacit\u00e9s r\u00e9elles de l\u2019\u00e9quipe et identifier les risques et les d\u00e9pendances possibles,<\/li>\n<li aria-level=\"1\"><b>revue de gestion<\/b> : les \u00e9quipes pr\u00e9sentent leurs projets de planification pour obtenir un feedback. On se concentre alors sur la gestion des risques et les d\u00e9pendances entre \u00e9quipes,<\/li>\n<li aria-level=\"1\"><b>finalisation<\/b> : apr\u00e8s discussions et ajustements, on finalise les objectifs et on s&rsquo;engage \u00e0 les r\u00e9aliser au cours de l&rsquo;incr\u00e9ment de programme \u00e0 venir.<\/li>\n<\/ul>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h2><span style=\"font-weight: 400;\">Comment pr\u00e9parer un \u00e9v\u00e9nement de PI planning en dix \u00e9tapes<\/span><\/h2>\n<p>Voici les dix \u00e9tapes essentielles pour \u00eatre bien pr\u00e9par\u00e9 avant de faire un \u00e9v\u00e9nement de planification de l&rsquo;IP.<\/p>\n<ol>\n<li aria-level=\"1\"><b>Comprendre et communiquer l&rsquo;objectif <\/b>: veillez \u00e0 ce que tous les participants, en particulier les cadres et la direction, comprennent clairement les objectifs du PI planning. Communiquez clairement que l&rsquo;objectif est de cr\u00e9er une feuille de route et d&rsquo;identifier les obstacles potentiels.<\/li>\n<li aria-level=\"1\"><b>Planifier longtemps \u00e0 l&rsquo;avance<\/b> : planifiez le prochain PI planning d\u00e8s la fin du trimestre en cours. Assurez-vous au plus t\u00f4t de la disponibilit\u00e9 de toutes les parties prenantes et de tous les dirigeants.<\/li>\n<li aria-level=\"1\"><b>Pr\u00e9parer la vision et le contexte du programme<\/b> : d\u00e9terminez \u00e0 l&rsquo;avance la vision et l&rsquo;objectif de l\u2019incr\u00e9ment de programme (IP). Assurez-vous que les responsables du programme et les parties prenantes savent comment transmettre correctement ces informations.<\/li>\n<li aria-level=\"1\"><b>Pr\u00e9voir des installations appropri\u00e9es<\/b> : r\u00e9servez une grande salle pouvant accueillir environ le double du nombre de participants pr\u00e9vus. Veillez \u00e0 ce que les participants \u00e0 distance b\u00e9n\u00e9ficient \u00e9galement d&rsquo;une installation adapt\u00e9e comme un \u00e9quipement de vid\u00e9oconf\u00e9rence performant.<\/li>\n<li aria-level=\"1\"><b>Affiner le backlog produit<\/b> : examinez et <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/backlog-refinement\/\">affinez votre backlog produit<\/a>. Veillez \u00e0 ce que les user stories et les fonctionnalit\u00e9s soient bien d\u00e9finies et class\u00e9es par ordre de priorit\u00e9.<\/li>\n<li aria-level=\"1\"><b>Aligner les parties prenantes<\/b> : dialoguez avec les chefs d&rsquo;entreprise et les parties prenantes pour comprendre les priorit\u00e9s et les attentes de chacun.<\/li>\n<li aria-level=\"1\"><b>Planifier la logistique<\/b> : pr\u00e9voir les outils, les ressources et le mat\u00e9riel n\u00e9cessaire pour toute la dur\u00e9e du PI planning. Mettez \u00e9galement en place des <a href=\"https:\/\/monday.com\/lang\/fr\/lp\/mb\/dpm\/project\">outils de collaboration num\u00e9rique<\/a> si n\u00e9cessaire.<\/li>\n<li aria-level=\"1\"><b>Pr\u00e9parer un ordre du jour<\/b> : \u00e9tablissez un programme d\u00e9taill\u00e9 pour les deux jours de l&rsquo;\u00e9v\u00e9nement. Pr\u00e9voyez du temps pour le contexte commercial, les pr\u00e9sentations de la vision, les r\u00e9unions d&rsquo;\u00e9quipe, l&rsquo;examen des plans, etc.<\/li>\n<li aria-level=\"1\"><b>Planification pr\u00e9-PI<\/b> : chaque \u00e9quipe doit organiser sa propre session de planification pr\u00e9-PI afin de pr\u00e9parer les plans initiaux et d&rsquo;identifier les risques potentiels et les d\u00e9pendances de l\u2019incr\u00e9ment.<\/li>\n<li aria-level=\"1\"><b>Mise en place d&rsquo;un tableau de programmation<\/b> : pr\u00e9parez un tableau de programme physique ou num\u00e9rique pour visualiser les fonctionnalit\u00e9s, les d\u00e9pendances et les <a href=\"https:\/\/monday.com\/blog\/fr\/gestion-de-projet\/jalons-de-projet\/\">jalons du projet.<\/a><\/li>\n<\/ol>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h2><span style=\"font-weight: 400;\">Quel est l\u2019agenda typique d\u2019un \u00e9v\u00e9nement de PI planning\u00a0<\/span><\/h2>\n<p>Voici comment se d\u00e9roule le programme type d&rsquo;une r\u00e9union de planification de l&rsquo;IP sur deux jours.<\/p>\n<h3><span style=\"font-weight: 400;\">Agenda : premier jour<\/span><\/h3>\n<p>Le premier jour du PI planning, l\u2019ordre du jour comprend g\u00e9n\u00e9ralement une pr\u00e9sentation du contexte commercial, de la vision du produit et de son architecture, suivie d&rsquo;une planification d\u00e9taill\u00e9e de l&rsquo;\u00e9quipe et d&rsquo;un examen initial de ces plans.<\/p>\n<ul>\n<li aria-level=\"1\"><b>Contexte commercial<\/b> : le chef d&rsquo;entreprise ou un cadre sup\u00e9rieur pr\u00e9sente l&rsquo;\u00e9tat actuel de l&rsquo;organisation, la vision du portefeuille de projet actuel et la mani\u00e8re dont les solutions existantes r\u00e9pondent aux besoins des clients.<\/li>\n<li aria-level=\"1\"><b>Vision du produit\/solution<\/b> : le chef de produit pr\u00e9sente la vision actuelle du produit, g\u00e9n\u00e9ralement repr\u00e9sent\u00e9e par les dix principales fonctionnalit\u00e9s \u00e0 venir.<\/li>\n<li aria-level=\"1\"><b>Vision de l&rsquo;architecture et pratiques de d\u00e9veloppement<\/b> : l&rsquo;architecte syst\u00e8me pr\u00e9sente la vision de l&rsquo;architecture du produit et un responsable du d\u00e9veloppement expose les meilleures pratiques de <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/developpement-produit\/\">d\u00e9veloppement produit<\/a> Agile.<\/li>\n<li aria-level=\"1\"><b>Contexte de planification<\/b> : le Release Train Engineer (RTE) pr\u00e9sente le processus de planification de l\u2019incr\u00e9ment du programme et les r\u00e9sultats attendus.<\/li>\n<li aria-level=\"1\"><b>1ere session par petits groupes<\/b> : les \u00e9quipes estiment leur capacit\u00e9 r\u00e9elle pour chaque it\u00e9ration et identifient les \u00e9l\u00e9ments du backlog n\u00e9cessaires \u00e0 la r\u00e9alisation des fonctionnalit\u00e9s. Elles cr\u00e9ent des plans provisoires visibles par tous, it\u00e9ration apr\u00e8s it\u00e9ration.<\/li>\n<li aria-level=\"1\"><b>Examen du projet de plan<\/b> : les \u00e9quipes pr\u00e9sentent les principaux r\u00e9sultats de la planification de l\u2019IP, notamment leur capacit\u00e9, leur charge de travail, les objectifs provisoires de l&rsquo;IP, les risques potentiels et les d\u00e9pendances. Les chefs d&rsquo;entreprise, les chefs de produits et les autres parties prenantes examinent et apportent leur contribution \u00e0 cet incr\u00e9ment.<\/li>\n<li aria-level=\"1\"><b>Examen par la direction et r\u00e9solution des probl\u00e8mes<\/b> : la direction n\u00e9gocie les modifications de la <a href=\"https:\/\/monday.com\/blog\/fr\/gestion-de-projet\/portee-du-projet\/\">port\u00e9e du projet<\/a> et r\u00e9sout les probl\u00e8mes en acceptant divers ajustements au PI planning. Le RTE anime cette session en r\u00e9unissant les principales parties prenantes pour qu&rsquo;elles prennent les d\u00e9cisions qui s&rsquo;imposent.<\/li>\n<\/ul>\n<h3><span style=\"font-weight: 400;\">Agenda : deuxi\u00e8me jour<\/span><\/h3>\n<p>Le deuxi\u00e8me jour du PI planning, l&rsquo;ordre du jour permet de finaliser les plans, d&rsquo;aborder les risques et de s&rsquo;aligner sur les objectifs de l&rsquo;IP \u00e0 venir. Il se termine par un vote de confiance pour s&rsquo;assurer de l&rsquo;adh\u00e9sion au plan de tous et par une r\u00e9trospective destin\u00e9e \u00e0 am\u00e9liorer les futurs \u00e9v\u00e9nements de planification de l&rsquo;IP.<\/p>\n<ul>\n<li aria-level=\"1\"><b>Ajustements de la planification<\/b> : la direction pr\u00e9sente les r\u00e9sultats des r\u00e9unions du\u00a0 premier jour et les changements \u00e9ventuels.<\/li>\n<li aria-level=\"1\"><b>2\u00e8me session par petits groupes<\/b> : les \u00e9quipes poursuivent la planification et les ajustements sur la base du feedback de la direction et finalisent les objectifs de l&rsquo;IP \u00e0 venir. Les chefs d&rsquo;entreprise attribuent des valeurs commerciales aux objectifs et les classent.<\/li>\n<li aria-level=\"1\"><b>Examen du plan final<\/b> : chaque \u00e9quipe pr\u00e9sente ses plans finalis\u00e9s, y compris les risques, les obstacles et les d\u00e9pendances. \u00c0 ce stade, les chefs d&rsquo;entreprise doivent approuver tous les plans, m\u00eame si les \u00e9quipes doivent encore les ajuster.<\/li>\n<li aria-level=\"1\"><b>Risques ART<\/b> : les \u00e9quipes discutent des risques identifi\u00e9s lors de la pr\u00e9sentation du plan final et les classent dans l&rsquo;une des quatre cat\u00e9gories suivantes :\n<ul>\n<li aria-level=\"2\"><b>R\u00e9solu<\/b> : il n&rsquo;y a plus de risque,<\/li>\n<li aria-level=\"2\"><b>G\u00e9r\u00e9<\/b> : quelqu&rsquo;un prend en charge la gestion du risque non r\u00e9solu,<\/li>\n<li aria-level=\"2\"><b>Accept\u00e9<\/b> : tout le monde comprend et reconna\u00eet que le risque est in\u00e9vitable,<\/li>\n<li aria-level=\"2\"><b>Att\u00e9nu\u00e9<\/b> : les \u00e9quipes identifient des strat\u00e9gies pour r\u00e9duire l&rsquo;impact du risque.<\/li>\n<\/ul>\n<\/li>\n<li aria-level=\"1\"><b>Vote de confiance<\/b> : les \u00e9quipes votent pour montrer leur confiance dans la r\u00e9alisation des objectifs de l&rsquo;IP en utilisant la m\u00e9thode du \u00ab vote \u00e0 cinq doigts \u00bb (physiquement ou num\u00e9riquement).\n<ul>\n<li aria-level=\"2\">Si la moyenne des doigts lev\u00e9s est <b>\u00e9gale ou sup\u00e9rieure \u00e0 trois<\/b>, le plan est accept\u00e9.<\/li>\n<li aria-level=\"2\">Si la moyenne des doigts lev\u00e9s est <b>inf\u00e9rieure \u00e0 trois<\/b>, le plan doit \u00eatre retravaill\u00e9.<\/li>\n<li aria-level=\"2\">Si quelqu&rsquo;un vote avec <b>un ou deux doigts lev\u00e9s<\/b>, il doit faire part ouvertement de ses pr\u00e9occupations. Il peut alors \u00eatre n\u00e9cessaire d&rsquo;ajouter ces pr\u00e9occupations \u00e0 la liste des risques, de les replanifier ou de fournir des informations suppl\u00e9mentaires.<\/li>\n<\/ul>\n<\/li>\n<li aria-level=\"1\"><b>Retravailler le plan<\/b> (facultatif) : si la confiance est faible, les \u00e9quipes peuvent \u00eatre amen\u00e9es \u00e0 retravailler leurs plans.<\/li>\n<li aria-level=\"1\"><b>R\u00e9trospective de la planification et progression<\/b> : le RTE effectue une br\u00e8ve <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/retrospective-agile\/\">r\u00e9trospective<\/a> de l&rsquo;\u00e9v\u00e9nement afin d&rsquo;identifier les am\u00e9liorations \u00e0 apporter aux futures sessions de planification de l&rsquo;IP.<\/li>\n<\/ul>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h2><span style=\"font-weight: 400;\">Que se passe-t-il apr\u00e8s un PI planning : le post-PI planning\u00a0<\/span><\/h2>\n<p>En suivant ces activit\u00e9s post-PI planning, on s&rsquo;assure que les plans sont effectivement mis en \u0153uvre et continuellement am\u00e9lior\u00e9s tout au long de la r\u00e9alisation de l&rsquo;incr\u00e9ment du programme.<\/p>\n<ul>\n<li aria-level=\"1\"><b>Prochaines \u00e9tapes<\/b> : pour faire avancer les objectifs, les \u00e9quipes coordonnent leurs calendriers afin d&rsquo;organiser des r\u00e9unions quotidiennes et des r\u00e9unions d&rsquo;it\u00e9ration.<\/li>\n<li aria-level=\"1\"><b>Documentation<\/b> : les \u00e9quipes transcrivent les objectifs, les user stories et le tableau du programme dans un <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/outils-de-gestion-de-projet-agile\/\">outil de gestion de projet Agile<\/a> comme monday dev et mettent \u00e0 jour les feuilles de route en fonction des objectifs du programme.<\/li>\n<li aria-level=\"1\"><b>Ex\u00e9cution<\/b> : les Agile Release Train (ART) commencent \u00e0 mettre en \u0153uvre les plans d\u00e9finis lors du PI planning et \u00e0 fournir de la valeur conform\u00e9ment aux engagements pris.<\/li>\n<li aria-level=\"1\"><b>\u00c9v\u00e9nements de planification post-PI<\/b> : d&rsquo;autres sessions de planification impliquant les parties prenantes de tous les Agile Release Train (ART) au sein du Solution Train ont lieu pour assurer la synchronisation et l&rsquo;alignement. Les \u00e9quipes pr\u00e9sentent les plans, expliquent les objectifs et partagent les jalons et les \u00e9ch\u00e9ances du projet pour chaque it\u00e9ration et ART.<\/li>\n<li aria-level=\"1\"><b>Am\u00e9lioration continue<\/b> : les \u00e9quipes organisent r\u00e9guli\u00e8rement des sessions d&rsquo;inspection et d&rsquo;adaptation (I&amp;A) tout au long de l&rsquo;incr\u00e9ment, r\u00e9fl\u00e9chissant aux progr\u00e8s r\u00e9alis\u00e9s, identifiant les domaines \u00e0 am\u00e9liorer et adaptant les plans si n\u00e9cessaire pour optimiser les performances.<\/li>\n<li aria-level=\"1\"><b>Feedback des clients<\/b> : les propri\u00e9taires de produits recherchent activement et int\u00e8grent le retour d&rsquo;information des clients et des utilisateurs finaux afin que les plans futurs correspondent aux attentes r\u00e9elles des clients.<\/li>\n<\/ul>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h2><span style=\"font-weight: 400;\">Les pi\u00e8ges courants du PI planning \u00e0 \u00e9viter<\/span><\/h2>\n<p>Voici dix probl\u00e8mes les plus courants lors d\u2019un PI planning.<\/p>\n<ol>\n<li aria-level=\"1\"><b>Pr\u00e9paration insuffisante<\/b> : ne pas fournir suffisamment de contexte ou de vision avant l&rsquo;\u00e9v\u00e9nement et ne pas disposer d&rsquo;un backlog produit clair ou de fonctionnalit\u00e9s class\u00e9es par ordre de priorit\u00e9.<\/li>\n<li aria-level=\"1\"><b>Une mauvaise gestion du temps<\/b> : permettre aux discussions de d\u00e9border et de perturber l&rsquo;ordre du jour et ne pas allouer suffisamment de temps aux r\u00e9unions d&rsquo;\u00e9quipe ou \u00e0 l&rsquo;examen des plans.<\/li>\n<li aria-level=\"1\"><b>Manque d&rsquo;engagement des parties prenantes<\/b> : ne pas impliquer les principaux acteurs de l&rsquo;entreprise tout au long du processus et ne pas obtenir l&rsquo;adh\u00e9sion des dirigeants.<\/li>\n<li aria-level=\"1\"><b>Ignorer les d\u00e9pendances<\/b> : ne pas identifier et g\u00e9rer les d\u00e9pendances entre les \u00e9quipes et ne pas visualiser les d\u00e9pendances sur le tableau du programme.<\/li>\n<li aria-level=\"1\"><b>Mettre trop l&rsquo;accent sur l&rsquo;estimation<\/b> : passer trop de temps sur des d\u00e9tails au d\u00e9triment d&rsquo;autres activit\u00e9s et perdre de vue la situation dans son ensemble.<\/li>\n<li aria-level=\"1\"><b>N\u00e9gliger la dynamique d&rsquo;\u00e9quipe<\/b> : ne pas promouvoir un environnement de collaboration positif et inclusif. Ne pas traiter rapidement les conflits ou les probl\u00e8mes.<\/li>\n<li aria-level=\"1\"><b>Omettre le vote de confiance<\/b> : ne pas organiser ou prendre au s\u00e9rieux le vote de confiance de l&rsquo;\u00e9quipe sur le plan.<\/li>\n<li aria-level=\"1\"><b>Oublier d&rsquo;examiner les IP ant\u00e9rieures<\/b> : ne pas se pencher sur les performances ant\u00e9rieures de l&rsquo;IP pour \u00e9clairer le PI planning actuel.<\/li>\n<li aria-level=\"1\"><b>N\u00e9gliger les r\u00e9trospectives<\/b> : sauter ou b\u00e2cler la r\u00e9trospective de la planification et ne pas mettre en \u0153uvre les am\u00e9liorations bas\u00e9es sur le retour d&rsquo;information des sessions pr\u00e9c\u00e9dentes.<\/li>\n<li aria-level=\"1\"><b>Difficult\u00e9s li\u00e9es \u00e0 la planification virtuelle<\/b> : ne pas adapter efficacement le processus de planification aux \u00e9quipes travaillant \u00e0 distance et utiliser des outils de collaboration inad\u00e9quats.<\/li>\n<\/ol>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h2>Faire son PI planning avec monday dev<\/h2>\n<p>Bas\u00e9 sur le Work OS de monday.com et dot\u00e9 de nombreuses fonctionnalit\u00e9s indispensables, <a href=\"https:\/\/monday.com\/lang\/fr\/dev\">monday dev<\/a> permet \u00e0 toutes les parties prenantes de se connecter et de collaborer facilement \u00e0 chaque \u00e9tape du processus de PI planning.<\/p>\n<h3>Tableaux personnalisables<\/h3>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-222398\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-1024x682.jpg\" alt=\"Exemple de tableau de gestion des t\u00e2ches Agile cr\u00e9\u00e9 avec monday dev\" width=\"1024\" height=\"682\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-1024x682.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-300x200.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-768x512.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-1536x1023.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints.jpg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>Adaptez les tableaux personnalisables de monday dev pour faciliter votre gestion du PI planning selon votre processus de travail personnel. Par exemple, cr\u00e9ez facilement un <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/tableau-scrum\/\">tableau Scrum<\/a> pour visualiser votre tableau de programme complet et comprenez d\u2019un coup d&rsquo;\u0153il toutes les fonctionnalit\u00e9s, les d\u00e9pendances et les jalons impliquant votre \u00e9quipe. Puis, mettez en place des tableaux individuels pour chaque \u00e9quipe afin de suivre leurs objectifs d&rsquo;IP et d\u00e9composer leurs objectifs en \u00e9l\u00e9ments facilement r\u00e9alisables.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h3><span style=\"font-weight: 400;\">Collaboration<\/span><\/h3>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-222468\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-gestion-des-sprints-collaboration-1024x682.jpg\" alt=\"Communiquez en direct avec les workdocs de monday.com\" width=\"1024\" height=\"682\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-gestion-des-sprints-collaboration-1024x682.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-gestion-des-sprints-collaboration-300x200.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-gestion-des-sprints-collaboration-768x512.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-gestion-des-sprints-collaboration-1536x1023.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-gestion-des-sprints-collaboration.jpg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>Utilisez monday dev pour collaborer intuitivement entre toutes les parties prenantes du projet. Ainsi, les \u00e9quipes peuvent travailler simultan\u00e9ment sur leurs plans avec des mises \u00e0 jour en temps r\u00e9el visibles par tous les participants. Ensuite, vous pouvez coop\u00e9rer en direct et partager instantan\u00e9ment des commentaires avec les <a href=\"https:\/\/monday.com\/lang\/fr\/workdocs\">workdocs de monday.com<\/a> pour discuter des d\u00e9pendances, des risques et des ajustements n\u00e9cessaires pendant tout le PI planning.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h3><span style=\"font-weight: 400;\">Vues de travail<\/span><\/h3>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-220823\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/06\/Dev-Kanban-feuille-de-route-1024x778.jpg\" alt=\"G\u00e9rez votre PI planning comme vous l'entendez avec les tableaux Kanban, diagrammes de Gantt et chronologies de monday.com\" width=\"1024\" height=\"778\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/06\/Dev-Kanban-feuille-de-route-1024x778.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/06\/Dev-Kanban-feuille-de-route-300x228.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/06\/Dev-Kanban-feuille-de-route-768x584.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/06\/Dev-Kanban-feuille-de-route-1536x1167.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/06\/Dev-Kanban-feuille-de-route.jpg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>Optimisez votre PI planning gr\u00e2ce aux grandes capacit\u00e9s de visualisation de notre plateforme Agile. Par exemple, vous pouvez visualiser la chronologie des fonctionnalit\u00e9s et des d\u00e9pendances \u00e0 travers l&rsquo;incr\u00e9ment de programme avec la <a href=\"https:\/\/monday.com\/lang\/fr\/features\/gantt\">vue Gantt<\/a>. Sinon, les <a href=\"https:\/\/monday.com\/lang\/fr\/features\/kanban\">tableaux Kanban<\/a> faciliteront la gestion du backlog produit et l&rsquo;organisation du travail pour l&rsquo;IP \u00e0 venir.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h3><span style=\"font-weight: 400;\">Int\u00e9gration<\/span><\/h3>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-219965\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-automatisation-1024x682.jpg\" alt=\"Int\u00e9grez facilement les outils m\u00e9tiers que vous utilisez d\u00e9j\u00e0 avec monday dev\" width=\"1024\" height=\"682\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-automatisation-1024x682.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-automatisation-300x200.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-automatisation-768x512.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-automatisation-1536x1023.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-automatisation.jpg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>Tirez parti des nombreuses fonctions d&rsquo;<a href=\"https:\/\/monday.com\/lang\/fr\/integrations\/sl\">int\u00e9gration pour connecter monday dev<\/a> aux outils de d\u00e9veloppement que vous utilisez d\u00e9j\u00e0. Vous aurez ainsi les donn\u00e9es les plus pertinentes pour la planification de l\u2019IP. Ensuite, mettez en place des <a href=\"https:\/\/monday.com\/lang\/fr\/features\/automations\">automatisations performantes<\/a> afin d&rsquo;informer les membres de l&rsquo;\u00e9quipe des mises \u00e0 jour ou des changements apport\u00e9s au plan.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h3><span style=\"font-weight: 400;\">Outils de reporting<\/span><\/h3>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-219973\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/tableau-de-bord-sprint-integration-1024x449.jpg\" alt=\"Centralisez toutes les donn\u00e9es de votre PI planning dans un tableau de bord intuitif et performant avec monday work management\" width=\"1024\" height=\"449\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/tableau-de-bord-sprint-integration-1024x449.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/tableau-de-bord-sprint-integration-300x132.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/tableau-de-bord-sprint-integration-768x337.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/tableau-de-bord-sprint-integration-1536x674.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/tableau-de-bord-sprint-integration.jpg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>Utilisez les fonctions de reporting de monday dev pour suivre l&rsquo;avancement des objectifs de l&rsquo;IP tout au long de l&rsquo;incr\u00e9ment. Puis, g\u00e9n\u00e9rez des <a href=\"https:\/\/monday.com\/lang\/fr\/features\/dashboards\">tableaux de bord pertinents<\/a> permettant de visualiser la capacit\u00e9 de l&rsquo;\u00e9quipe, d&rsquo;identifier les risques et d&rsquo;analyser d&rsquo;autres indicateurs de performance pour un meilleur PI planning.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h2><span style=\"font-weight: 400;\">Rationalisez votre PI planning avec monday dev<\/span><\/h2>\n<p>La r\u00e9ussite d\u2019un PI planning repose principalement sur la participation active et l&rsquo;alignement de tous les membres de l&rsquo;\u00e9quipe et des parties prenantes. Heureusement, avec monday dev, vous disposez d&rsquo;une plateforme Agile et flexible pour fournir l&rsquo;infrastructure technique n\u00e9cessaire \u00e0 un tel \u00e9v\u00e9nement. Mais, son succ\u00e8s d\u00e9pendra toujours de l&rsquo;efficacit\u00e9 de la facilitation de l\u2019\u00e9v\u00e9nement et de l&rsquo;engagement de l&rsquo;\u00e9quipe.<\/p>\n<p>Alors, essayez monday dev d\u00e8s aujourd\u2019hui pour d\u00e9couvrir comment vous pouvez rationaliser votre processus de PI planning et faire en sorte que tout le monde soit r\u00e9ellement sur la m\u00eame longueur d&rsquo;onde.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n","sections":[{"acf_fc_layout":"content_1","blocks":[{"main_heading":"","content_block":[{"acf_fc_layout":"text","content":"<p>Le PI planning, ou <em>planification de l\u2019incr\u00e9ment de programme<\/em> en fran\u00e7ais, est un \u00e9v\u00e9nement Agile \u00e0 grande \u00e9chelle r\u00e9current pour aligner toutes les \u00e9quipes d\u2019un Agile Release Train (ART) sur une mission et une vision unique. C\u2019est donc un \u00e9l\u00e9ment crucial du Scaled Agile Framework (SAFe) que les organisations doivent imp\u00e9rativement conna\u00eetre si elles veulent ma\u00eetriser avec brio leur d\u00e9veloppement produit Agile.<\/p>\n<p>Dans ce guide, apr\u00e8s une courte d\u00e9finition du PI planning, vous apprendrez pourquoi faire une planification de l\u2019incr\u00e9ment de programme, qui est impliqu\u00e9 dans cet \u00e9v\u00e9nement SAFe, ce que couvre l\u2019ordre du jour et son agenda. Enfin, nous vous montrerons comment rationaliser votre PI planning en r\u00e9unissant efficacement plusieurs \u00e9quipes avec monday dev.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n"}]},{"main_heading":"Le PI planning, c\u2019est quoi : d\u00e9finition","content_block":[{"acf_fc_layout":"text","content":"<p>Le PI Planning, pour <i>Program Increment Planning<\/i> en anglais, se traduit par <i>planification de l\u2019incr\u00e9ment de programme<\/i> en fran\u00e7ais. Parfois aussi appel\u00e9 <em>B<\/em><i>ig Room Planning<\/i>, c\u2019est l\u2019un des \u00e9v\u00e9nements les plus importants du <i>Scaled Agile Framework<\/i> (SAFe). En effet, lors du PI planning, plusieurs \u00e9quipes du m\u00eame <i>Agile Release Train<\/i> (ART) se rencontrent pour s\u2019aligner sur les m\u00eames objectifs et planifier le travail \u00e0 r\u00e9aliser pour l\u2019incr\u00e9ment de programme (IP) \u00e0 venir.<\/p>\n<p>De mani\u00e8re g\u00e9n\u00e9rale, on organise un \u00e9v\u00e9nement de PI planning toutes les huit \u00e0 douze semaines et il dure deux jours. Pendant ces deux journ\u00e9es, toutes les \u00e9quipes impliqu\u00e9es d\u00e9finissent ensemble une vision commune, planifient les fonctionnalit\u00e9s n\u00e9cessaires, identifient les d\u00e9pendances les plus contraignantes et s\u2019engagent sur des objectifs communs pour le prochain incr\u00e9ment de programme \u00e0 produire.<\/p>\n<p>Pour aller plus loin\u00a0: <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/safe-scrum\/\">SAFe ou Scrum : les principales diff\u00e9rences<\/a>.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n"}]},{"main_heading":"Pourquoi faire un PI planning ?","content_block":[{"acf_fc_layout":"text","content":"<p>La planification de l\u2019IP, ou PI planning, est un \u00e9v\u00e9nement tr\u00e8s important car il vise \u00e0 assurer la coh\u00e9rence entre chaque incr\u00e9mentation, \u00e0 favoriser la collaboration entre toutes les parties prenantes, \u00e0 g\u00e9rer les risques potentiels, \u00e0 am\u00e9liorer la visibilit\u00e9 \u00e0 long terme et \u00e0 garantir que les \u00e9quipes travaillent efficacement avec les m\u00eames objectifs g\u00e9n\u00e9raux en t\u00eate. Alors, m\u00eame si une r\u00e9union de PI planning n\u00e9cessite beaucoup de temps et d\u2019efforts pour la mettre en \u0153uvre, de nombreuses organisations estiment que, pour une <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/gestion-de-produit-agile\/\">gestion de produit Agile<\/a> \u00e0 grande \u00e9chelle, les avantages l\u2019emportent sur les co\u00fbts.<\/p>\n<h3>1. Meilleur alignement et visibilit\u00e9<\/h3>\n<p>La r\u00e9union de PI planning permet d\u2019aligner toutes les \u00e9quipes du Agile Release Train (ART) sur les objectifs g\u00e9n\u00e9raux et la <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/vision-produit\/\">vision de l\u2019entreprise<\/a>. C\u2019est un \u00e9v\u00e9nement qui clarifie le travail pr\u00e9vu pour l\u2019incr\u00e9ment de programme \u00e0 venir et permet \u00e0 chacun de toujours travailler sur les \u00e9l\u00e9ments les plus urgents.<\/p>\n<h3>2. Meilleure collaboration et coordination<\/h3>\n<p>La r\u00e9union de PI planning rassemble toutes les parties prenantes pour discuter et coordonner les d\u00e9pendances entre t\u00e2ches. Elle favorise la collaboration entre les \u00e9quipes et permet des discussions et des prises de d\u00e9cision efficaces et en temps r\u00e9el.<\/p>\n<h3>3. Meilleure gestion des risques<\/h3>\n<p>Le PI planning permet d\u2019identifier rapidement les risques et les probl\u00e8mes potentiels. Il permet d\u2019\u00e9laborer de mani\u00e8re proactive des plans d\u2019att\u00e9nuation des risques et r\u00e9duit les probabilit\u00e9s de mauvaises surprises lors de l\u2019ex\u00e9cution.<\/p>\n<h3>4. Meilleure planification et pr\u00e9visibilit\u00e9<\/h3>\n<p>L\u2019\u00e9v\u00e9nement de PI planning permet une planification et une estimation du travail \u00e0 effectuer plus pr\u00e9cises. Il augmente la fiabilit\u00e9 des livraisons et donne confiance aux parties prenantes dans les engagements de l\u2019\u00e9quipe.<\/p>\n<h3>5. Meilleure utilisation des ressources<\/h3>\n<p>Le PI planning permet de r\u00e9partir plus efficacement les capacit\u00e9s et les comp\u00e9tences de chacun. Il permet d\u2019adapter la demande aux capacit\u00e9s r\u00e9elles des \u00e9quipes et d\u2019\u00e9liminer les travaux en cours (WIP) inutiles.<\/p>\n<h3>6. Meilleure motivation et clart\u00e9<\/h3>\n<p>Le PI planning permet de comprendre la situation dans son ensemble tout comme le r\u00f4le de chacun dans le projet. Il donne une compr\u00e9hension commune des objectifs et des priorit\u00e9s du projet et accro\u00eet la motivation de l\u2019\u00e9quipe.<\/p>\n<h3>7. Meilleur r\u00e9seautage<\/h3>\n<p>Le PI planning rassemble les membres de l\u2019\u00e9quipe et les parties prenantes pour une communication en face \u00e0 face. Il renforce les relations et la confiance entre les \u00e9quipes et r\u00e9unit les principales parties prenantes pour qu\u2019elles prennent les meilleures d\u00e9cisions possibles.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n"}]},{"main_heading":"\u00c0 quelle fr\u00e9quence organiser un PI planning","content_block":[{"acf_fc_layout":"text","content":"<p>On organise g\u00e9n\u00e9ralement un PI planning toutes les 8 \u00e0 12\u00a0semaines. Mais, on peut toujours adapter son calendrier selon ses propres besoins. Par exemple, certaines organisations pr\u00e9f\u00e8rent faire un PI planning toutes les huit semaines pour plus d\u2019agilit\u00e9, tandis que d\u2019autres pr\u00e9f\u00e8rent attendre douze semaines entre chaque PI planning pour correspondre aux trimestres administratifs. Ainsi, de mani\u00e8re g\u00e9n\u00e9rale, si on consid\u00e8re qu\u2019un sprint dure deux semaines, un incr\u00e9ment de programme (IP) dure de quatre \u00e0 six sprints, ce qui donne un rythme coh\u00e9rent pour la planification de l\u2019IP et l\u2019alignement g\u00e9n\u00e9ral.<\/p>\n<p>Mais, quelle que soit la fr\u00e9quence choisie, le PI planning doit suivre un calendrier r\u00e9gulier et pr\u00e9visible. En effet, il s\u2019agit d\u2019un \u00e9v\u00e9nement fixe, encadr\u00e9 dans le temps et qui dure g\u00e9n\u00e9ralement deux jours. Seule cette cadence r\u00e9guli\u00e8re permet de synchroniser, de planifier et d\u2019adapter correctement son travail tout au long du Agile Release Train (ART).<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n"}]},{"main_heading":"Qui participe au PI planning : r\u00f4les et responsabilit\u00e9s","content_block":[{"acf_fc_layout":"text","content":"<p>Du fait de sa nature collaborative, le PI planning implique de multiples points de vue diff\u00e9rents. Voici les principaux r\u00f4les et responsabilit\u00e9s d\u2019un \u00e9v\u00e9nement de planification de l\u2019incr\u00e9ment de programme.<\/p>\n\n<table id=\"tablepress-477\" class=\"tablepress tablepress-id-477\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">R\u00f4le<\/th><th class=\"column-2\">Responsabilit\u00e9s<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">Release Train Engineer (RTE)<\/td><td class=\"column-2\">Facilitation des \u00e9v\u00e9nements, alignement, gestion des risques<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">Chef de produit<\/td><td class=\"column-2\">Communication de la vision, priorisation du processus de travail<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">Propri\u00e9taire de produit<\/td><td class=\"column-2\">Gestion du backlog, d\u00e9finition des stories<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">Scrum Master<\/td><td class=\"column-2\">Coaching de l'\u00e9quipe, \u00e9limination des obstacles<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">D\u00e9veloppeurs<\/td><td class=\"column-2\">Planification d\u00e9taill\u00e9e, affinage des stories<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-477 from cache -->\n<h3>Release Train Engineer (RTE)<\/h3>\n<p>Le Release Train Engineer (RTE) anime l\u2019ensemble de l\u2019\u00e9v\u00e9nement de planification de l\u2019IP. Il aide donc \u00e0\u00a0:<\/p>\n<ul>\n<li aria-level=\"1\">g\u00e9rer les risques et les d\u00e9pendances du projet,<\/li>\n<li aria-level=\"1\">cr\u00e9er et suivre les objectifs du programme,<\/li>\n<li aria-level=\"1\">assurer l\u2019alignement strat\u00e9gique du processus de planification.<\/li>\n<\/ul>\n<h3>Chef de produit<\/h3>\n<p>Les chefs de produit pr\u00e9sentent la vision du programme et les \u00e9tapes \u00e0 venir. En outre, ils\u00a0:<\/p>\n<ul>\n<li aria-level=\"1\">examinent le projet de planification,<\/li>\n<li aria-level=\"1\">g\u00e8rent et hi\u00e9rarchisent les processus de travail,<\/li>\n<li aria-level=\"1\">mettent \u00e0 jour la <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/feuille-de-route-produit\/\">feuille de route du produit<\/a> apr\u00e8s la r\u00e9union de PI planning.<\/li>\n<\/ul>\n<h3>Propri\u00e9taire de produit<\/h3>\n<p>Les propri\u00e9taires de produit g\u00e8rent le<a href=\"https:\/\/monday.com\/blog\/fr\/dev\/backlog-produit\/\"> backlog produit <\/a>de l\u2019\u00e9quipe et en d\u00e9finissent les priorit\u00e9s. Ils sont \u00e9galement charg\u00e9s de\u00a0:<\/p>\n<ul>\n<li aria-level=\"1\">d\u00e9finir les fonctionnalit\u00e9s et les <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/user-story\/\">user stories<\/a>,<\/li>\n<li aria-level=\"1\">prendre des d\u00e9cisions concernant les user stories d\u00e9finies,<\/li>\n<li aria-level=\"1\">transmettre la vision de l\u2019entreprise.<\/li>\n<\/ul>\n<h3>Scrum Master<\/h3>\n<p>Les <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/scrum-master\/\">Scrum Masters<\/a> aident les propri\u00e9taires de produit et les d\u00e9veloppeurs en \u00e9liminant tout obstacle qui pourrait g\u00eaner l\u2019\u00e9quipe dans son travail. En outre, ils\u00a0:<\/p>\n<ul>\n<li aria-level=\"1\">s\u2019assurent que tout le monde respecte les <a href=\"https:\/\/manifesteagile.fr\/#principes\">principes Agile<\/a>,<\/li>\n<li aria-level=\"1\">contr\u00f4lent la dur\u00e9e de l\u2019\u00e9v\u00e9nement et coachent les \u00e9quipes,<\/li>\n<li aria-level=\"1\">soutiennent les processus de planification de l\u2019\u00e9quipe et identifient les d\u00e9pendances.<\/li>\n<\/ul>\n<h3>D\u00e9veloppeurs<\/h3>\n<p>Les d\u00e9veloppeurs et les <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/tests-agiles\/\">testeurs<\/a> participent aux sessions de groupe pour\u00a0:<\/p>\n<ul>\n<li aria-level=\"1\">construire et affiner les user stories,<\/li>\n<li aria-level=\"1\">identifier les risques et les d\u00e9pendances,<\/li>\n<li aria-level=\"1\">r\u00e9diger les objectifs de l\u2019incr\u00e9ment de programme (IP) de l\u2019\u00e9quipe.<\/li>\n<\/ul>\n<h3>Autres parties prenantes cl\u00e9s<\/h3>\n<p>En outre, l\u2019\u00e9v\u00e9nement de PI planning peut impliquer\u00a0:<\/p>\n<ul>\n<li aria-level=\"1\">des architectes syst\u00e8me,<\/li>\n<li aria-level=\"1\">des responsables techniques,<\/li>\n<li aria-level=\"1\">des cadres sup\u00e9rieurs,<\/li>\n<li aria-level=\"1\">les chefs d\u2019entreprise,<\/li>\n<li aria-level=\"1\">les clients.<\/li>\n<\/ul>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n"}]},{"main_heading":"Quel est l\u2019ordre du jour typique d\u2019un PI planning","content_block":[{"acf_fc_layout":"text","content":"<p>L\u2019ordre du jour d\u2019un \u00e9v\u00e9nement de planification de l\u2019IP comprend g\u00e9n\u00e9ralement les \u00e9l\u00e9ments suivants\u00a0:<\/p>\n<ul>\n<li aria-level=\"1\"><b>pr\u00e9sentation du contexte commercial\u00a0<\/b>: vue d\u2019ensemble de l\u2019\u00e9tat actuel de l\u2019entreprise et des conditions du march\u00e9,<\/li>\n<li aria-level=\"1\"><b>pr\u00e9sentation de la vision du produit\u00a0<\/b>: d\u00e9tails sur les fonctionnalit\u00e9s \u00e0 venir et les priorit\u00e9s de la gestion des produits,<\/li>\n<li aria-level=\"1\"><b>s\u00e9ances en petits groupes\u00a0<\/b>: les \u00e9quipes travaillent en petits groupes pour \u00e9laborer des strat\u00e9gies, \u00e9valuer les capacit\u00e9s r\u00e9elles de l\u2019\u00e9quipe et identifier les risques et les d\u00e9pendances possibles,<\/li>\n<li aria-level=\"1\"><b>revue de gestion\u00a0<\/b>: les \u00e9quipes pr\u00e9sentent leurs projets de planification pour obtenir un feedback. On se concentre alors sur la gestion des risques et les d\u00e9pendances entre \u00e9quipes,<\/li>\n<li aria-level=\"1\"><b>finalisation\u00a0<\/b>: apr\u00e8s discussions et ajustements, on finalise les objectifs et on s\u2019engage \u00e0 les r\u00e9aliser au cours de l\u2019incr\u00e9ment de programme \u00e0 venir.<\/li>\n<\/ul>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n"}]},{"main_heading":"Comment pr\u00e9parer un \u00e9v\u00e9nement de PI planning en dix \u00e9tapes","content_block":[{"acf_fc_layout":"text","content":"<p>Voici les dix \u00e9tapes essentielles pour \u00eatre bien pr\u00e9par\u00e9 avant de faire un \u00e9v\u00e9nement de planification de l\u2019IP.<\/p>\n<ol>\n<li aria-level=\"1\"><b>Comprendre et communiquer l\u2019objectif\u00a0<\/b>: veillez \u00e0 ce que tous les participants, en particulier les cadres et la direction, comprennent clairement les objectifs du PI planning. Communiquez clairement que l\u2019objectif est de cr\u00e9er une feuille de route et d\u2019identifier les obstacles potentiels.<\/li>\n<li aria-level=\"1\"><b>Planifier longtemps \u00e0 l\u2019avance\u00a0<\/b>: planifiez le prochain PI planning d\u00e8s la fin du trimestre en cours. Assurez-vous au plus t\u00f4t de la disponibilit\u00e9 de toutes les parties prenantes et de tous les dirigeants.<\/li>\n<li aria-level=\"1\"><b>Pr\u00e9parer la vision et le contexte du programme\u00a0<\/b>: d\u00e9terminez \u00e0 l\u2019avance la vision et l\u2019objectif de l\u2019incr\u00e9ment de programme (IP). Assurez-vous que les responsables du programme et les parties prenantes savent comment transmettre correctement ces informations.<\/li>\n<li aria-level=\"1\"><b>Pr\u00e9voir des installations appropri\u00e9es\u00a0<\/b>: r\u00e9servez une grande salle pouvant accueillir environ le double du nombre de participants pr\u00e9vus. Veillez \u00e0 ce que les participants \u00e0 distance b\u00e9n\u00e9ficient \u00e9galement d\u2019une installation adapt\u00e9e comme un \u00e9quipement de vid\u00e9oconf\u00e9rence performant.<\/li>\n<li aria-level=\"1\"><b>Affiner le backlog produit\u00a0<\/b>: examinez et <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/backlog-refinement\/\">affinez votre backlog produit<\/a>. Veillez \u00e0 ce que les user stories et les fonctionnalit\u00e9s soient bien d\u00e9finies et class\u00e9es par ordre de priorit\u00e9.<\/li>\n<li aria-level=\"1\"><b>Aligner les parties prenantes\u00a0<\/b>: dialoguez avec les chefs d\u2019entreprise et les parties prenantes pour comprendre les priorit\u00e9s et les attentes de chacun.<\/li>\n<li aria-level=\"1\"><b>Planifier la logistique\u00a0<\/b>: pr\u00e9voir les outils, les ressources et le mat\u00e9riel n\u00e9cessaire pour toute la dur\u00e9e du PI planning. Mettez \u00e9galement en place des <a href=\"https:\/\/monday.com\/lang\/fr\/lp\/mb\/dpm\/project\">outils de collaboration num\u00e9rique<\/a> si n\u00e9cessaire.<\/li>\n<li aria-level=\"1\"><b>Pr\u00e9parer un ordre du jour\u00a0<\/b>: \u00e9tablissez un programme d\u00e9taill\u00e9 pour les deux jours de l\u2019\u00e9v\u00e9nement. Pr\u00e9voyez du temps pour le contexte commercial, les pr\u00e9sentations de la vision, les r\u00e9unions d\u2019\u00e9quipe, l\u2019examen des plans, etc.<\/li>\n<li aria-level=\"1\"><b>Planification pr\u00e9-PI\u00a0<\/b>: chaque \u00e9quipe doit organiser sa propre session de planification pr\u00e9-PI afin de pr\u00e9parer les plans initiaux et d\u2019identifier les risques potentiels et les d\u00e9pendances de l\u2019incr\u00e9ment.<\/li>\n<li aria-level=\"1\"><b>Mise en place d\u2019un tableau de programmation\u00a0<\/b>: pr\u00e9parez un tableau de programme physique ou num\u00e9rique pour visualiser les fonctionnalit\u00e9s, les d\u00e9pendances et les <a href=\"https:\/\/monday.com\/blog\/fr\/gestion-de-projet\/jalons-de-projet\/\">jalons du projet.<\/a><\/li>\n<\/ol>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n"}]},{"main_heading":"Quel est l\u2019agenda typique d\u2019un \u00e9v\u00e9nement de PI planning\u00a0","content_block":[{"acf_fc_layout":"text","content":"<p>Voici comment se d\u00e9roule le programme type d\u2019une r\u00e9union de planification de l\u2019IP sur deux jours.<\/p>\n<h3>PI planning Agenda : premier jour<\/h3>\n<p>Le premier jour du PI planning, l\u2019ordre du jour comprend g\u00e9n\u00e9ralement une pr\u00e9sentation du contexte commercial, de la vision du produit et de son architecture, suivie d\u2019une planification d\u00e9taill\u00e9e de l\u2019\u00e9quipe et d\u2019un examen initial de ces plans.<\/p>\n<ul>\n<li aria-level=\"1\"><b>Contexte commercial\u00a0<\/b>: le chef d\u2019entreprise ou un cadre sup\u00e9rieur pr\u00e9sente l\u2019\u00e9tat actuel de l\u2019organisation, la vision du portefeuille de projet actuel et la mani\u00e8re dont les solutions existantes r\u00e9pondent aux besoins des clients.<\/li>\n<li aria-level=\"1\"><b>Vision du produit\/solution\u00a0<\/b>: le chef de produit pr\u00e9sente la vision actuelle du produit, g\u00e9n\u00e9ralement repr\u00e9sent\u00e9e par les dix principales fonctionnalit\u00e9s \u00e0 venir.<\/li>\n<li aria-level=\"1\"><b>Vision de l\u2019architecture et pratiques de d\u00e9veloppement\u00a0<\/b>: l\u2019architecte syst\u00e8me pr\u00e9sente la vision de l\u2019architecture du produit et un responsable du d\u00e9veloppement expose les meilleures pratiques de <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/developpement-produit\/\">d\u00e9veloppement produit<\/a> Agile.<\/li>\n<li aria-level=\"1\"><b>Contexte de planification\u00a0<\/b>: le Release Train Engineer (RTE) pr\u00e9sente le processus de planification de l\u2019incr\u00e9ment du programme et les r\u00e9sultats attendus.<\/li>\n<li aria-level=\"1\"><b>1ere session par petits groupes\u00a0<\/b>: les \u00e9quipes estiment leur capacit\u00e9 r\u00e9elle pour chaque it\u00e9ration et identifient les \u00e9l\u00e9ments du backlog n\u00e9cessaires \u00e0 la r\u00e9alisation des fonctionnalit\u00e9s. Elles cr\u00e9ent des plans provisoires visibles par tous, it\u00e9ration apr\u00e8s it\u00e9ration.<\/li>\n<li aria-level=\"1\"><b>Examen du projet de plan\u00a0<\/b>: les \u00e9quipes pr\u00e9sentent les principaux r\u00e9sultats de la planification de l\u2019IP, notamment leur capacit\u00e9, leur charge de travail, les objectifs provisoires de l\u2019IP, les risques potentiels et les d\u00e9pendances. Les chefs d\u2019entreprise, les chefs de produits et les autres parties prenantes examinent et apportent leur contribution \u00e0 cet incr\u00e9ment.<\/li>\n<li aria-level=\"1\"><b>Examen par la direction et r\u00e9solution des probl\u00e8mes\u00a0<\/b>: la direction n\u00e9gocie les modifications de la <a href=\"https:\/\/monday.com\/blog\/fr\/gestion-de-projet\/portee-du-projet\/\">port\u00e9e du projet<\/a> et r\u00e9sout les probl\u00e8mes en acceptant divers ajustements au PI planning. Le RTE anime cette session en r\u00e9unissant les principales parties prenantes pour qu\u2019elles prennent les d\u00e9cisions qui s\u2019imposent.<\/li>\n<\/ul>\n<h3>PI planning\u00a0Agenda : deuxi\u00e8me jour<\/h3>\n<p>Le deuxi\u00e8me jour du PI planning, l\u2019ordre du jour permet de finaliser les plans, d\u2019aborder les risques et de s\u2019aligner sur les objectifs de l\u2019IP \u00e0 venir. Il se termine par un vote de confiance pour s\u2019assurer de l\u2019adh\u00e9sion au plan de tous et par une r\u00e9trospective destin\u00e9e \u00e0 am\u00e9liorer les futurs \u00e9v\u00e9nements de planification de l\u2019IP.<\/p>\n<ul>\n<li aria-level=\"1\"><b>Ajustements de la planification\u00a0<\/b>: la direction pr\u00e9sente les r\u00e9sultats des r\u00e9unions du\u00a0 premier jour et les changements \u00e9ventuels.<\/li>\n<li aria-level=\"1\"><b>2\u00e8me session par petits groupes\u00a0<\/b>: les \u00e9quipes poursuivent la planification et les ajustements sur la base du feedback de la direction et finalisent les objectifs de l\u2019IP \u00e0 venir. Les chefs d\u2019entreprise attribuent des valeurs commerciales aux objectifs et les classent.<\/li>\n<li aria-level=\"1\"><b>Examen du plan final\u00a0<\/b>: chaque \u00e9quipe pr\u00e9sente ses plans finalis\u00e9s, y compris les risques, les obstacles et les d\u00e9pendances. \u00c0 ce stade, les chefs d\u2019entreprise doivent approuver tous les plans, m\u00eame si les \u00e9quipes doivent encore les ajuster.<\/li>\n<li aria-level=\"1\"><b>Risques ART\u00a0<\/b>: les \u00e9quipes discutent des risques identifi\u00e9s lors de la pr\u00e9sentation du plan final et les classent dans l\u2019une des quatre cat\u00e9gories suivantes\u00a0:\n<ul>\n<li aria-level=\"2\"><b>R\u00e9solu<\/b> : il n\u2019y a plus de risque,<\/li>\n<li aria-level=\"2\"><b>G\u00e9r\u00e9<\/b> : quelqu\u2019un prend en charge la gestion du risque non r\u00e9solu,<\/li>\n<li aria-level=\"2\"><b>Accept\u00e9<\/b> : tout le monde comprend et reconna\u00eet que le risque est in\u00e9vitable,<\/li>\n<li aria-level=\"2\"><b>Att\u00e9nu\u00e9<\/b> : les \u00e9quipes identifient des strat\u00e9gies pour r\u00e9duire l\u2019impact du risque.<\/li>\n<\/ul>\n<\/li>\n<li aria-level=\"1\"><b>Vote de confiance<\/b> : les \u00e9quipes votent pour montrer leur confiance dans la r\u00e9alisation des objectifs de l\u2019IP en utilisant la m\u00e9thode du \u00ab\u00a0vote \u00e0 cinq doigts\u00a0\u00bb (physiquement ou num\u00e9riquement).\n<ul>\n<li aria-level=\"2\">Si la moyenne des doigts lev\u00e9s est <b>\u00e9gale ou sup\u00e9rieure \u00e0 trois<\/b>, le plan est accept\u00e9.<\/li>\n<li aria-level=\"2\">Si la moyenne des doigts lev\u00e9s est <b>inf\u00e9rieure \u00e0 trois<\/b>, le plan doit \u00eatre retravaill\u00e9.<\/li>\n<li aria-level=\"2\">Si quelqu\u2019un vote avec <b>un ou deux doigts lev\u00e9s<\/b>, il doit faire part ouvertement de ses pr\u00e9occupations. Il peut alors \u00eatre n\u00e9cessaire d\u2019ajouter ces pr\u00e9occupations \u00e0 la liste des risques, de les replanifier ou de fournir des informations suppl\u00e9mentaires.<\/li>\n<\/ul>\n<\/li>\n<li aria-level=\"1\"><b>Retravailler le plan<\/b> (facultatif)\u00a0: si la confiance est faible, les \u00e9quipes peuvent \u00eatre amen\u00e9es \u00e0 retravailler leurs plans.<\/li>\n<li aria-level=\"1\"><b>R\u00e9trospective de la planification et progression\u00a0<\/b>: le RTE effectue une br\u00e8ve <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/retrospective-agile\/\">r\u00e9trospective<\/a> de l\u2019\u00e9v\u00e9nement afin d\u2019identifier les am\u00e9liorations \u00e0 apporter aux futures sessions de planification de l\u2019IP.<\/li>\n<\/ul>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n"}]},{"main_heading":"Que se passe-t-il apr\u00e8s un PI planning : le post-PI planning\u00a0","content_block":[{"acf_fc_layout":"text","content":"<p>En suivant ces activit\u00e9s post-PI planning, on s\u2019assure que les plans sont effectivement mis en \u0153uvre et continuellement am\u00e9lior\u00e9s tout au long de la r\u00e9alisation de l\u2019incr\u00e9ment du programme.<\/p>\n<ul>\n<li aria-level=\"1\"><b>Prochaines \u00e9tapes\u00a0<\/b>: pour faire avancer les objectifs, les \u00e9quipes coordonnent leurs calendriers afin d\u2019organiser des r\u00e9unions quotidiennes et des r\u00e9unions d\u2019it\u00e9ration.<\/li>\n<li aria-level=\"1\"><b>Documentation\u00a0<\/b>: les \u00e9quipes transcrivent les objectifs, les user stories et le tableau du programme dans un <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/outils-de-gestion-de-projet-agile\/\">outil de gestion de projet Agile<\/a> comme monday dev et mettent \u00e0 jour les feuilles de route en fonction des objectifs du programme.<\/li>\n<li aria-level=\"1\"><b>Ex\u00e9cution<\/b> : les Agile Release Train (ART) commencent \u00e0 mettre en \u0153uvre les plans d\u00e9finis lors du PI planning et \u00e0 fournir de la valeur conform\u00e9ment aux engagements pris.<\/li>\n<li aria-level=\"1\"><b>\u00c9v\u00e9nements de planification post-PI\u00a0<\/b>: d\u2019autres sessions de planification impliquant les parties prenantes de tous les Agile Release Train (ART) au sein du Solution Train ont lieu pour assurer la synchronisation et l\u2019alignement. Les \u00e9quipes pr\u00e9sentent les plans, expliquent les objectifs et partagent les jalons et les \u00e9ch\u00e9ances du projet pour chaque it\u00e9ration et ART.<\/li>\n<li aria-level=\"1\"><b>Am\u00e9lioration continue\u00a0<\/b>: les \u00e9quipes organisent r\u00e9guli\u00e8rement des sessions d\u2019inspection et d\u2019adaptation (I&amp;A) tout au long de l\u2019incr\u00e9ment, r\u00e9fl\u00e9chissant aux progr\u00e8s r\u00e9alis\u00e9s, identifiant les domaines \u00e0 am\u00e9liorer et adaptant les plans si n\u00e9cessaire pour optimiser les performances.<\/li>\n<li aria-level=\"1\"><b>Feedback des clients\u00a0<\/b>: les propri\u00e9taires de produits recherchent activement et int\u00e8grent le retour d\u2019information des clients et des utilisateurs finaux afin que les plans futurs correspondent aux attentes r\u00e9elles des clients.<\/li>\n<\/ul>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n"}]},{"main_heading":"Les pi\u00e8ges courants du PI planning \u00e0 \u00e9viter","content_block":[{"acf_fc_layout":"text","content":"<p>Voici dix probl\u00e8mes les plus courants lors d\u2019un PI planning.<\/p>\n<ol>\n<li aria-level=\"1\"><b>Pr\u00e9paration insuffisante\u00a0<\/b>: ne pas fournir suffisamment de contexte ou de vision avant l\u2019\u00e9v\u00e9nement et ne pas disposer d\u2019un backlog produit clair ou de fonctionnalit\u00e9s class\u00e9es par ordre de priorit\u00e9.<\/li>\n<li aria-level=\"1\"><b>Une mauvaise gestion du temps\u00a0<\/b>: permettre aux discussions de d\u00e9border et de perturber l\u2019ordre du jour et ne pas allouer suffisamment de temps aux r\u00e9unions d\u2019\u00e9quipe ou \u00e0 l\u2019examen des plans.<\/li>\n<li aria-level=\"1\"><b>Manque d\u2019engagement des parties prenantes\u00a0<\/b>: ne pas impliquer les principaux acteurs de l\u2019entreprise tout au long du processus et ne pas obtenir l\u2019adh\u00e9sion des dirigeants.<\/li>\n<li aria-level=\"1\"><b>Ignorer les d\u00e9pendances\u00a0<\/b>: ne pas identifier et g\u00e9rer les d\u00e9pendances entre les \u00e9quipes et ne pas visualiser les d\u00e9pendances sur le tableau du programme.<\/li>\n<li aria-level=\"1\"><b>Mettre trop l\u2019accent sur l\u2019estimation\u00a0<\/b>: passer trop de temps sur des d\u00e9tails au d\u00e9triment d\u2019autres activit\u00e9s et perdre de vue la situation dans son ensemble.<\/li>\n<li aria-level=\"1\"><b>N\u00e9gliger la dynamique d\u2019\u00e9quipe\u00a0<\/b>: ne pas promouvoir un environnement de collaboration positif et inclusif. Ne pas traiter rapidement les conflits ou les probl\u00e8mes.<\/li>\n<li aria-level=\"1\"><b>Omettre le vote de confiance\u00a0<\/b>: ne pas organiser ou prendre au s\u00e9rieux le vote de confiance de l\u2019\u00e9quipe sur le plan.<\/li>\n<li aria-level=\"1\"><b>Oublier d\u2019examiner les IP ant\u00e9rieures\u00a0<\/b>: ne pas se pencher sur les performances ant\u00e9rieures de l\u2019IP pour \u00e9clairer le PI planning actuel.<\/li>\n<li aria-level=\"1\"><b>N\u00e9gliger les r\u00e9trospectives\u00a0<\/b>: sauter ou b\u00e2cler la r\u00e9trospective de la planification et ne pas mettre en \u0153uvre les am\u00e9liorations bas\u00e9es sur le retour d\u2019information des sessions pr\u00e9c\u00e9dentes.<\/li>\n<li aria-level=\"1\"><b>Difficult\u00e9s li\u00e9es \u00e0 la planification virtuelle\u00a0<\/b>: ne pas adapter efficacement le processus de planification aux \u00e9quipes travaillant \u00e0 distance et utiliser des outils de collaboration inad\u00e9quats.<\/li>\n<\/ol>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n"}]},{"main_heading":"Faire son PI planning avec monday dev","content_block":[{"acf_fc_layout":"text","content":"<p>Bas\u00e9 sur le Work OS de monday.com et dot\u00e9 de nombreuses fonctionnalit\u00e9s indispensables, <a href=\"https:\/\/monday.com\/lang\/fr\/dev\">monday dev<\/a> permet \u00e0 toutes les parties prenantes de se connecter et de collaborer facilement \u00e0 chaque \u00e9tape du processus de PI planning.<\/p>\n<h3>Tableaux personnalisables<\/h3>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-222398\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-1024x682.jpg\" sizes=\"(max-width: 1024px) 100vw, 1024px\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-1024x682.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-300x200.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-768x512.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-1536x1023.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints.jpg 1600w\" alt=\"Exemple de tableau de gestion des t\u00e2ches Agile cr\u00e9\u00e9 avec monday dev\" width=\"1024\" height=\"682\" \/><\/p>\n<p>Adaptez les tableaux personnalisables de monday dev pour faciliter votre gestion du PI planning selon votre processus de travail personnel. Par exemple, cr\u00e9ez facilement un <a href=\"https:\/\/monday.com\/blog\/fr\/dev\/tableau-scrum\/\">tableau Scrum<\/a> pour visualiser votre tableau de programme complet et comprenez d\u2019un coup d\u2019\u0153il toutes les fonctionnalit\u00e9s, les d\u00e9pendances et les jalons impliquant votre \u00e9quipe. Puis, mettez en place des tableaux individuels pour chaque \u00e9quipe afin de suivre leurs objectifs d\u2019IP et d\u00e9composer leurs objectifs en \u00e9l\u00e9ments facilement r\u00e9alisables.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h3>Collaboration<\/h3>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-222468\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-gestion-des-sprints-collaboration-1024x682.jpg\" sizes=\"(max-width: 1024px) 100vw, 1024px\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-gestion-des-sprints-collaboration-1024x682.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-gestion-des-sprints-collaboration-300x200.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-gestion-des-sprints-collaboration-768x512.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-gestion-des-sprints-collaboration-1536x1023.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-gestion-des-sprints-collaboration.jpg 1600w\" alt=\"Communiquez en direct avec les workdocs de monday.com\" width=\"1024\" height=\"682\" \/><\/p>\n<p>Utilisez monday dev pour collaborer intuitivement entre toutes les parties prenantes du projet. Ainsi, les \u00e9quipes peuvent travailler simultan\u00e9ment sur leurs plans avec des mises \u00e0 jour en temps r\u00e9el visibles par tous les participants. Ensuite, vous pouvez coop\u00e9rer en direct et partager instantan\u00e9ment des commentaires avec les <a href=\"https:\/\/monday.com\/lang\/fr\/workdocs\">workdocs de monday.com<\/a> pour discuter des d\u00e9pendances, des risques et des ajustements n\u00e9cessaires pendant tout le PI planning.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h3>Vues de travail<\/h3>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-220823\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/06\/Dev-Kanban-feuille-de-route-1024x778.jpg\" sizes=\"(max-width: 1024px) 100vw, 1024px\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/06\/Dev-Kanban-feuille-de-route-1024x778.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/06\/Dev-Kanban-feuille-de-route-300x228.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/06\/Dev-Kanban-feuille-de-route-768x584.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/06\/Dev-Kanban-feuille-de-route-1536x1167.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2021\/06\/Dev-Kanban-feuille-de-route.jpg 1600w\" alt=\"G\u00e9rez votre PI planning comme vous l'entendez avec les tableaux Kanban, diagrammes de Gantt et chronologies de monday.com\" width=\"1024\" height=\"778\" \/><\/p>\n<p>Optimisez votre PI planning gr\u00e2ce aux grandes capacit\u00e9s de visualisation de notre plateforme Agile. Par exemple, vous pouvez visualiser la chronologie des fonctionnalit\u00e9s et des d\u00e9pendances \u00e0 travers l\u2019incr\u00e9ment de programme avec la <a href=\"https:\/\/monday.com\/lang\/fr\/features\/gantt\">vue Gantt<\/a>. Sinon, les <a href=\"https:\/\/monday.com\/lang\/fr\/features\/kanban\">tableaux Kanban<\/a> faciliteront la gestion du backlog produit et l\u2019organisation du travail pour l\u2019IP \u00e0 venir.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h3>Int\u00e9gration<\/h3>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-219965\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-automatisation-1024x682.jpg\" sizes=\"(max-width: 1024px) 100vw, 1024px\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-automatisation-1024x682.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-automatisation-300x200.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-automatisation-768x512.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-automatisation-1536x1023.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/Dev-tableau-gestion-des-sprints-automatisation.jpg 1600w\" alt=\"Int\u00e9grez facilement les outils m\u00e9tiers que vous utilisez d\u00e9j\u00e0 avec monday dev\" width=\"1024\" height=\"682\" \/><\/p>\n<p>Tirez parti des nombreuses fonctions d\u2019<a href=\"https:\/\/monday.com\/lang\/fr\/integrations\/sl\">int\u00e9gration pour connecter monday dev<\/a> aux outils de d\u00e9veloppement que vous utilisez d\u00e9j\u00e0. Vous aurez ainsi les donn\u00e9es les plus pertinentes pour la planification de l\u2019IP. Ensuite, mettez en place des <a href=\"https:\/\/monday.com\/lang\/fr\/features\/automations\">automatisations performantes<\/a> afin d\u2019informer les membres de l\u2019\u00e9quipe des mises \u00e0 jour ou des changements apport\u00e9s au plan.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<h3>Outils de reporting<\/h3>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-219973\" src=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/tableau-de-bord-sprint-integration-1024x449.jpg\" sizes=\"(max-width: 1024px) 100vw, 1024px\" srcset=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/tableau-de-bord-sprint-integration-1024x449.jpg 1024w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/tableau-de-bord-sprint-integration-300x132.jpg 300w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/tableau-de-bord-sprint-integration-768x337.jpg 768w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/tableau-de-bord-sprint-integration-1536x674.jpg 1536w, https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/tableau-de-bord-sprint-integration.jpg 1600w\" alt=\"Centralisez toutes les donn\u00e9es de votre PI planning dans un tableau de bord intuitif et performant avec monday work management\" width=\"1024\" height=\"449\" \/><\/p>\n<p>Utilisez les fonctions de <a href=\"https:\/\/monday.com\/blog\/fr\/gestion-du-travail\/reporting\/\">reporting<\/a> de monday dev pour suivre l\u2019avancement des objectifs de l\u2019IP tout au long de l\u2019incr\u00e9ment. Puis, g\u00e9n\u00e9rez des <a href=\"https:\/\/monday.com\/lang\/fr\/features\/dashboards\">tableaux de bord pertinents<\/a> permettant de visualiser la capacit\u00e9 de l\u2019\u00e9quipe, d\u2019identifier les risques et d\u2019analyser d\u2019autres indicateurs de performance pour un meilleur PI planning.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n"}]},{"main_heading":"Rationalisez votre PI planning avec monday dev","content_block":[{"acf_fc_layout":"text","content":"<p>La r\u00e9ussite d\u2019un PI planning repose principalement sur la participation active et l\u2019alignement de tous les membres de l\u2019\u00e9quipe et des parties prenantes. Heureusement, avec monday dev, vous disposez d\u2019une plateforme Agile et flexible pour fournir l\u2019infrastructure technique n\u00e9cessaire \u00e0 un tel \u00e9v\u00e9nement. Mais, son succ\u00e8s d\u00e9pendra toujours de l\u2019efficacit\u00e9 de la facilitation de l\u2019\u00e9v\u00e9nement et de l\u2019engagement de l\u2019\u00e9quipe.<\/p>\n<p>Alors, essayez monday dev d\u00e8s aujourd\u2019hui pour d\u00e9couvrir comment vous pouvez rationaliser votre processus de PI planning et faire en sorte que tout le monde soit r\u00e9ellement sur la m\u00eame longueur d\u2019onde.<\/p>\n<a class=\"cta-button blue-button\" aria-label=\"Essayer monday dev\" href=\"https:\/\/auth.monday.com\/p\/software\/users\/sign_up_new?origin=hp_fullbg_page_header#soft_signup_from_step\" target=\"_self\">Essayer monday dev<\/a>\n<div class=\"accordion faq\" id=\"faq-\">\n  <h2 class=\"accordion__heading section-title text-left\">FAQ <\/h2>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-\" href=\"#q--1\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">Qu'est-ce que le PI planning dans SAFe ?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q--1\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-\">\n      <p>Le PI planning dans SAFe est un \u00e9v\u00e9nement crucial de deux jours qui a lieu toutes les huit \u00e0 douze semaines et qui rassemble plusieurs \u00e9quipes, parties prenantes et dirigeants afin d'aligner les objectifs et de cr\u00e9er un plan commun pour l'Incr\u00e9ment de Programme (PI) \u00e0 venir. Au cours de la planification du PI, les \u00e9quipes collaborent pour d\u00e9velopper des objectifs communs, identifier les d\u00e9pendances et les risques du projet et s'engager \u00e0 fournir de la valeur au cours des huit \u00e0 douze semaines suivantes, en veillant \u00e0 l'alignement sur la vision et la strat\u00e9gie de l'organisation.<\/p>\n    <\/div>\n  <\/div>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-\" href=\"#q--2\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">Qu'est-ce que le PI planning dans Scrum ?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q--2\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-\">\n      <p>Le PI planning peut \u00eatre adapt\u00e9 \u00e0 Scrum, m\u00eame s'il ne s'agit pas d'une pratique standard de Scrum. Dans un contexte Scrum, plusieurs \u00e9quipes Scrum pourraient se r\u00e9unir toutes les huit \u00e0 dix semaines pour s'aligner sur les objectifs, discuter des fonctionnalit\u00e9s \u00e0 venir et coordonner leur travail entre les \u00e9quipes. Cette version adapt\u00e9e du PI planning permet aux \u00e9quipes Scrum de conserver leur approche bas\u00e9e sur les sprints Scrum tout en b\u00e9n\u00e9ficiant de l'alignement et de la coordination qu'offre le PI planning.<\/p>\n    <\/div>\n  <\/div>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-\" href=\"#q--3\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">Quelle est la diff\u00e9rence entre PI planning et planification du sprint ?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q--3\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-\">\n      <p>Le PI planning est un \u00e9v\u00e9nement strat\u00e9gique qui a lieu toutes les huit \u00e0 douze semaines et implique plusieurs \u00e9quipes qui s'alignent sur les objectifs et les plans pour l'ensemble d'un Incr\u00e9ment de Programme (PI).<br \/>\nEn revanche, la planification de sprint est un \u00e9v\u00e9nement tactique qui a lieu au d\u00e9but de chaque sprint de une \u00e0 quatre semaines et qui se concentre sur le plan de projet d\u00e9taill\u00e9 d'une seule \u00e9quipe pour ce sprint.<br \/>\nAinsi, alors que le PI planning d\u00e9finit la vision et les objectifs g\u00e9n\u00e9raux de l'IP, la planification du sprint d\u00e9compose ces objectifs en t\u00e2ches sp\u00e9cifiques et en user stories pour une ex\u00e9cution imm\u00e9diate.<\/p>\n    <\/div>\n  <\/div>\n    <div class=\"accordion__item\">\n    <a class=\"accordion__button d-block\" data-toggle=\"collapse\" data-parent=\"#faq-\" href=\"#q--4\"\n      aria-expanded=\"false\">\n      <h3 class=\"accordion__question\">Quelle est la diff\u00e9rence entre PI planning et Big Room Planning (BRP) ?        <svg class=\"angle-arrow angle-arrow--down\" width=\"32\" height=\"32\" viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n          <path fill-rule=\"evenodd\" clip-rule=\"evenodd\" d=\"M16.5303 20.8839C16.2374 21.1768 15.7626 21.1768 15.4697 20.8839L7.82318 13.2374C7.53029 12.9445 7.53029 12.4697 7.82318 12.1768L8.17674 11.8232C8.46963 11.5303 8.9445 11.5303 9.2374 11.8232L16 18.5858L22.7626 11.8232C23.0555 11.5303 23.5303 11.5303 23.8232 11.8232L24.1768 12.1768C24.4697 12.4697 24.4697 12.9445 24.1768 13.2374L16.5303 20.8839Z\" fill=\"black\"\/>\n        <\/svg>\n      <\/h3>\n    <\/a>\n    <div id=\"q--4\" class=\"accordion__answer collapse collapse--md\" data-parent=\"#faq-\">\n      <p>En fait, le PI planning et le Big Room Planning sont le m\u00eame \u00e9v\u00e9nement, le Big Room Planning \u00e9tant un nom alternatif pour la planification de l'IP. Les deux font donc r\u00e9f\u00e9rence \u00e0 un \u00e9v\u00e9nement de planification \u00e0 grande \u00e9chelle impliquant plusieurs \u00e9quipes et se d\u00e9roulant g\u00e9n\u00e9ralement toutes les huit \u00e0 douze semaines. Les termes sont souvent utilis\u00e9s de mani\u00e8re interchangeable, le \u00ab Big Room Planning \u00bb mettant l'accent sur l'aspect physique de la r\u00e9union de nombreuses personnes dans une grande salle, tandis que le \u00ab PI Planning \u00bb met l'accent sur son r\u00f4le dans le Scaled Agile Framework (SAFe).<\/p>\n    <\/div>\n  <\/div>\n  <script type='application\/ld+json'>{\n    \"@context\": \"https:\\\/\\\/schema.org\",\n    \"@type\": \"FAQPage\",\n    \"mainEntity\": [\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Qu'est-ce que le PI planning dans SAFe ?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>Le PI planning dans SAFe est un \\u00e9v\\u00e9nement crucial de deux jours qui a lieu toutes les huit \\u00e0 douze semaines et qui rassemble plusieurs \\u00e9quipes, parties prenantes et dirigeants afin d'aligner les objectifs et de cr\\u00e9er un plan commun pour l'Incr\\u00e9ment de Programme (PI) \\u00e0 venir. Au cours de la planification du PI, les \\u00e9quipes collaborent pour d\\u00e9velopper des objectifs communs, identifier les d\\u00e9pendances et les risques du projet et s'engager \\u00e0 fournir de la valeur au cours des huit \\u00e0 douze semaines suivantes, en veillant \\u00e0 l'alignement sur la vision et la strat\\u00e9gie de l'organisation.<\\\/p>\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Qu'est-ce que le PI planning dans Scrum ?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>Le PI planning peut \\u00eatre adapt\\u00e9 \\u00e0 Scrum, m\\u00eame s'il ne s'agit pas d'une pratique standard de Scrum. Dans un contexte Scrum, plusieurs \\u00e9quipes Scrum pourraient se r\\u00e9unir toutes les huit \\u00e0 dix semaines pour s'aligner sur les objectifs, discuter des fonctionnalit\\u00e9s \\u00e0 venir et coordonner leur travail entre les \\u00e9quipes. Cette version adapt\\u00e9e du PI planning permet aux \\u00e9quipes Scrum de conserver leur approche bas\\u00e9e sur les sprints Scrum tout en b\\u00e9n\\u00e9ficiant de l'alignement et de la coordination qu'offre le PI planning.<\\\/p>\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Quelle est la diff\\u00e9rence entre PI planning et planification du sprint ?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>Le PI planning est un \\u00e9v\\u00e9nement strat\\u00e9gique qui a lieu toutes les huit \\u00e0 douze semaines et implique plusieurs \\u00e9quipes qui s'alignent sur les objectifs et les plans pour l'ensemble d'un Incr\\u00e9ment de Programme (PI).<br \\\/>\\nEn revanche, la planification de sprint est un \\u00e9v\\u00e9nement tactique qui a lieu au d\\u00e9but de chaque sprint de une \\u00e0 quatre semaines et qui se concentre sur le plan de projet d\\u00e9taill\\u00e9 d'une seule \\u00e9quipe pour ce sprint.<br \\\/>\\nAinsi, alors que le PI planning d\\u00e9finit la vision et les objectifs g\\u00e9n\\u00e9raux de l'IP, la planification du sprint d\\u00e9compose ces objectifs en t\\u00e2ches sp\\u00e9cifiques et en user stories pour une ex\\u00e9cution imm\\u00e9diate.<\\\/p>\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Quelle est la diff\\u00e9rence entre PI planning et Big Room Planning (BRP) ?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"<p>En fait, le PI planning et le Big Room Planning sont le m\\u00eame \\u00e9v\\u00e9nement, le Big Room Planning \\u00e9tant un nom alternatif pour la planification de l'IP. Les deux font donc r\\u00e9f\\u00e9rence \\u00e0 un \\u00e9v\\u00e9nement de planification \\u00e0 grande \\u00e9chelle impliquant plusieurs \\u00e9quipes et se d\\u00e9roulant g\\u00e9n\\u00e9ralement toutes les huit \\u00e0 douze semaines. Les termes sont souvent utilis\\u00e9s de mani\\u00e8re interchangeable, le \\u00ab Big Room Planning \\u00bb mettant l'accent sur l'aspect physique de la r\\u00e9union de nombreuses personnes dans une grande salle, tandis que le \\u00ab PI Planning \\u00bb met l'accent sur son r\\u00f4le dans le Scaled Agile Framework (SAFe).<\\\/p>\\n\"\n            }\n        }\n    ]\n}<\/script><\/div>\n\n"}]}]}],"show_contact_sales_button":"1","show_sidebar_sticky_banner":false,"custom_header_banner":false},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.6 (Yoast SEO v26.6) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>PI Planning, c\u2019est quoi ? D\u00e9finition de cet \u00e9v\u00e8nement SAFe Agile<\/title>\n<meta name=\"description\" content=\"Pourquoi faire une planification de l&#039;incr\u00e9ment de programme SAFe, qui y participe, son agenda et comment organiser un PI planning Agile.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PI planning : le guide ultime de la planification de l&#039;incr\u00e9ment de programme\" \/>\n<meta property=\"og:description\" content=\"Pourquoi faire une planification de l&#039;incr\u00e9ment de programme SAFe, qui y participe, son agenda et comment organiser un PI planning Agile.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/\" \/>\n<meta property=\"og:site_name\" content=\"monday.com Blog\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-31T19:39:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-28T14:20:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/PI-planning.png\" \/>\n\t<meta property=\"og:image:width\" content=\"4800\" \/>\n\t<meta property=\"og:image:height\" content=\"2400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Blandine Ginhoux\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Blandine Ginhoux\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/\"},\"author\":{\"name\":\"Blandine Ginhoux\",\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/person\/1dba0eca940a594600810b42dc9d1c30\"},\"headline\":\"PI planning : le guide ultime de la planification de l&rsquo;incr\u00e9ment de programme\",\"datePublished\":\"2025-03-31T19:39:51+00:00\",\"dateModified\":\"2025-11-28T14:20:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/\"},\"wordCount\":14,\"publisher\":{\"@id\":\"https:\/\/monday.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/PI-planning.png\",\"articleSection\":[\"Dev\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/\",\"url\":\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/\",\"name\":\"PI Planning, c\u2019est quoi ? D\u00e9finition de cet \u00e9v\u00e8nement SAFe Agile\",\"isPartOf\":{\"@id\":\"https:\/\/monday.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/PI-planning.png\",\"datePublished\":\"2025-03-31T19:39:51+00:00\",\"dateModified\":\"2025-11-28T14:20:27+00:00\",\"description\":\"Pourquoi faire une planification de l'incr\u00e9ment de programme SAFe, qui y participe, son agenda et comment organiser un PI planning Agile.\",\"breadcrumb\":{\"@id\":\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#primaryimage\",\"url\":\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/PI-planning.png\",\"contentUrl\":\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/PI-planning.png\",\"width\":4800,\"height\":2400,\"caption\":\"PI planning le guide ultime de la planification de lrsquoincrment de programme\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/monday.com\/blog\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Product development life cycle\",\"item\":\"https:\/\/monday.com\/blog\/rnd\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"PI planning : le guide ultime de la planification de l&#8217;incr\u00e9ment de programme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/monday.com\/blog\/#website\",\"url\":\"https:\/\/monday.com\/blog\/\",\"name\":\"monday.com Blog\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/monday.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/monday.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/monday.com\/blog\/#organization\",\"name\":\"monday.com Blog\",\"url\":\"https:\/\/monday.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/res.cloudinary.com\/monday-blogs\/fl_lossy,f_auto,q_auto\/wp-blog\/2020\/12\/monday.com-logo-1.png\",\"contentUrl\":\"https:\/\/res.cloudinary.com\/monday-blogs\/fl_lossy,f_auto,q_auto\/wp-blog\/2020\/12\/monday.com-logo-1.png\",\"width\":200,\"height\":200,\"caption\":\"monday.com Blog\"},\"image\":{\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/person\/1dba0eca940a594600810b42dc9d1c30\",\"name\":\"Blandine Ginhoux\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/monday.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/10\/20231027_005213-150x150.jpg\",\"contentUrl\":\"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/10\/20231027_005213-150x150.jpg\",\"caption\":\"Blandine Ginhoux\"},\"url\":\"https:\/\/monday.com\/blog\/fr\/author\/blandine-ginhoux\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"PI Planning, c\u2019est quoi ? D\u00e9finition de cet \u00e9v\u00e8nement SAFe Agile","description":"Pourquoi faire une planification de l'incr\u00e9ment de programme SAFe, qui y participe, son agenda et comment organiser un PI planning Agile.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/","og_locale":"fr_FR","og_type":"article","og_title":"PI planning : le guide ultime de la planification de l'incr\u00e9ment de programme","og_description":"Pourquoi faire une planification de l'incr\u00e9ment de programme SAFe, qui y participe, son agenda et comment organiser un PI planning Agile.","og_url":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/","og_site_name":"monday.com Blog","article_published_time":"2025-03-31T19:39:51+00:00","article_modified_time":"2025-11-28T14:20:27+00:00","og_image":[{"width":4800,"height":2400,"url":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/PI-planning.png","type":"image\/png"}],"author":"Blandine Ginhoux","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Blandine Ginhoux","Dur\u00e9e de lecture estim\u00e9e":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#article","isPartOf":{"@id":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/"},"author":{"name":"Blandine Ginhoux","@id":"https:\/\/monday.com\/blog\/#\/schema\/person\/1dba0eca940a594600810b42dc9d1c30"},"headline":"PI planning : le guide ultime de la planification de l&rsquo;incr\u00e9ment de programme","datePublished":"2025-03-31T19:39:51+00:00","dateModified":"2025-11-28T14:20:27+00:00","mainEntityOfPage":{"@id":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/"},"wordCount":14,"publisher":{"@id":"https:\/\/monday.com\/blog\/#organization"},"image":{"@id":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/PI-planning.png","articleSection":["Dev"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/","url":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/","name":"PI Planning, c\u2019est quoi ? D\u00e9finition de cet \u00e9v\u00e8nement SAFe Agile","isPartOf":{"@id":"https:\/\/monday.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#primaryimage"},"image":{"@id":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/PI-planning.png","datePublished":"2025-03-31T19:39:51+00:00","dateModified":"2025-11-28T14:20:27+00:00","description":"Pourquoi faire une planification de l'incr\u00e9ment de programme SAFe, qui y participe, son agenda et comment organiser un PI planning Agile.","breadcrumb":{"@id":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#primaryimage","url":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/PI-planning.png","contentUrl":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2025\/03\/PI-planning.png","width":4800,"height":2400,"caption":"PI planning le guide ultime de la planification de lrsquoincrment de programme"},{"@type":"BreadcrumbList","@id":"https:\/\/monday.com\/blog\/fr\/dev\/pi-planning\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/monday.com\/blog\/fr\/"},{"@type":"ListItem","position":2,"name":"Product development life cycle","item":"https:\/\/monday.com\/blog\/rnd\/"},{"@type":"ListItem","position":3,"name":"PI planning : le guide ultime de la planification de l&#8217;incr\u00e9ment de programme"}]},{"@type":"WebSite","@id":"https:\/\/monday.com\/blog\/#website","url":"https:\/\/monday.com\/blog\/","name":"monday.com Blog","description":"","publisher":{"@id":"https:\/\/monday.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/monday.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/monday.com\/blog\/#organization","name":"monday.com Blog","url":"https:\/\/monday.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/monday.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/res.cloudinary.com\/monday-blogs\/fl_lossy,f_auto,q_auto\/wp-blog\/2020\/12\/monday.com-logo-1.png","contentUrl":"https:\/\/res.cloudinary.com\/monday-blogs\/fl_lossy,f_auto,q_auto\/wp-blog\/2020\/12\/monday.com-logo-1.png","width":200,"height":200,"caption":"monday.com Blog"},"image":{"@id":"https:\/\/monday.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/monday.com\/blog\/#\/schema\/person\/1dba0eca940a594600810b42dc9d1c30","name":"Blandine Ginhoux","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/monday.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/10\/20231027_005213-150x150.jpg","contentUrl":"https:\/\/monday.com\/blog\/wp-content\/uploads\/2023\/10\/20231027_005213-150x150.jpg","caption":"Blandine Ginhoux"},"url":"https:\/\/monday.com\/blog\/fr\/author\/blandine-ginhoux\/"}]}},"auth_debug":{"user_exists":false,"user_id":0,"user_login":null,"roles":[],"authenticated":false,"get_current_user_id":0},"_links":{"self":[{"href":"https:\/\/monday.com\/blog\/fr\/wp-json\/wp\/v2\/posts\/223764","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/monday.com\/blog\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/monday.com\/blog\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/monday.com\/blog\/fr\/wp-json\/wp\/v2\/users\/248"}],"replies":[{"embeddable":true,"href":"https:\/\/monday.com\/blog\/fr\/wp-json\/wp\/v2\/comments?post=223764"}],"version-history":[{"count":10,"href":"https:\/\/monday.com\/blog\/fr\/wp-json\/wp\/v2\/posts\/223764\/revisions"}],"predecessor-version":[{"id":266223,"href":"https:\/\/monday.com\/blog\/fr\/wp-json\/wp\/v2\/posts\/223764\/revisions\/266223"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/monday.com\/blog\/fr\/wp-json\/wp\/v2\/media\/223767"}],"wp:attachment":[{"href":"https:\/\/monday.com\/blog\/fr\/wp-json\/wp\/v2\/media?parent=223764"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/monday.com\/blog\/fr\/wp-json\/wp\/v2\/categories?post=223764"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/monday.com\/blog\/fr\/wp-json\/wp\/v2\/tags?post=223764"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}